Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC A | |
| 2 | L2₹25.3 L+₹78,531.47 (3.21%)Rejected-AOC | L2 | Rejected-AOC A |
| Sl No | Description | Qty | Unit | SUDHIR KUMAR CONTRACTOR L1 | SUDESH KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Silt Clearance/trench digging including lift upto 1.50m. and lead upto 6m. Including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc. but excluding levelling, dressing & compaction. | 42,218.38 | Cum. | 45 ₹18,99,827.1 Lowest | 45.67 ₹19,28,113.42 |
| 2.00 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | 1,25,110 | Sqm. | 4 ₹5,00,440 Lowest | 4.4 ₹5,50,484 |
| 3.00 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | 40.23 | per km | 1,085 ₹43,649.55 Lowest | 1,090 ₹43,850.7 |
| 4.00 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | 1 | no | 4,999 ₹4,999 Lowest | 4,999 ₹4,999 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
26 Sept 2026, 11:00 amClosed
EE Lower Division Yamuna Canal Shamli
EE Lower Division Yamuna Canal Office Shamli
01- SILT CLEARANCE OF KALLARPUR DY. FROM KM. 0.000 TO KM. 40.230
2026_UPIDC_1187244_1
C-53/T-5/05/EE/2026-27 DT. 05-09-2026
Open Tender
Civil Works
Item Rate
20 days
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.5 L
8 Oct 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt Clearance/trench digging including lift upto 1.50m. and lead upto 6m. Including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc. but excluding levelling, dressing & compaction. | 42,218.38 | Cum. | - | - |
| 2 | Scrapping of internal section of Existing channel i.c Bed & slope with silt upto 5cm. | 1,25,110 | Sqm. | - | - |
| 3 | Video Graphy/Photography of Silt Clearance works in canal and drains before & after Silt clearance by DRONE as per requirement including supply of Videography/Photography in Pen Drive and vehicles for movement as per direction of Engineer-in-charge. | 40.23 | per km | - | - |
| 4 | Painting & Letter Writing on Old Iron Sign Board i/c all cost of material, labour, T & P etc. | 1 | no | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_2235232.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .