Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹74.1 L
EMD Value
₹1.5 L
Closing Date
21 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Karnataka Forest Department
ACF Ballari
Raising of seedlings including trench plantation and its maintenance 20 Ha at Ubbalagandi RF Block 26 of Ballari Range during the year 2026-27 under KMERC Scheme (Unit No 44)
KFD/2026-27/OW/WORK_INDENT42591
KFD/2026-27/OW/WORK_INDENT42591
Open
Other Works
Two Tender Document System(Two Cover)
KFD ACF Territorial Sub Division Office Bellari
1 document required · 1 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Work done certificate as per tender notification (Afforestation Works)
₹1,860
₹1.5 L
9 Oct 2026
9 Oct 2026
22 Oct 2026
19 Oct 2026
16 Oct 2026
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
Name of the Range : Ballari Location : Toranagallu Sy No 272 Block-I
Budget Head :- CEPMIZ-KMERC (Toranagallu RF Projects) Extent:-20 Ha
Number of Trench :- 200 Trench/ Ha Size of Trench:- 4 M x 1.0 M x 0.75 M
GPS Readings : N-15 12 50.56 E- 76 41 35.03 Total amount 4,685,000
Sl. CSSR Item No. Particulars of the Work Qnty. Rate Per Amount
1 22(d)(ii) Mechanical (through machine) clearance of unwanted growth of Prosopis juliflora trees by uprooting the shrubs/trees over the entire area, heaping, leveling of soil and also retaining native species and after that dragging the cleared material and burning (ii) Average height of PJ below 6 feet 4 Ha 65643.69 Ha 262,575.00
2 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 1440 Rmtrs 1542.78 Km 2,222.00
3 28 (a) Aligning in the planting area along the contours and making for trenches 4,000 Trench 1813.42 1000 7,254.00
4 28 (b) (ii) Excavation of continuous contour trenches of size 4 M x 1.00 M x 0.75 M with uncut portion of 25 cm. In between adjacent trenches and depositing the 1/3rd top soil on the upper slopes & 2/3rd excavated earth on lower slopes of the trenches in - Hard Soil 12,000 Cum 263.78 1 3,165,360.00
5 As per PCCF data Sheet Procurement of seeds for sowing on the mounds of the trenches during next rains. 20 Ha 116.55 1 2,331.00
6 Sub Estimate Raising of 10" X 16" Seedlings including 10% Casuality 8,800.00 Km 61.326 1 539,668.80
7 Sub Estimate Erection Barbed Wire Fencing with wooden fence post for protection of Plantation 2.62 Km 264,000 Km 691,680.00
8 - Purchase and fixing of stone pillars including painting of stone for plantation boundary,Laying of sample plots for study, Soil testing, Plantation Photos & Documents Miscellaneous, Unforeseen & rounding off Ls 13,909.20
Grand Total Amount 4,685,000.00 2.34
9 28 (C.) Refilling of trenches cutting the edges of the excavated trench on the lower side and refilling the trench with 75% of the excavated earth duly breaking the clods and formation of uniformly sloping continuous mound all along the lower side of the trench 4000 Trench 26.69 Trench 106,760.00
10 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 8800 Seedl. 6,233.91 1000 54,858.41
(e) Seedlings raised in 10" x 16" size bags
11 24 (e) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
(iv) Seedlings raised in 10" x 16" size bags: Distance from 31 to 40 Kms. 8800 Seedl. 7,995.06 1000 70,356.53
12 25(e) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near eachtrench-10" x 16" Size bagged seedlings 8800 Seedl. 7,334.34 1000 64,542.19
13 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (10" x 16" Seedlings) 8800 Seedl. 1,320.14 1000 11,617.23
14 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 10" x 16"size bagged seedlings 8800 Seedl. 7,074.72 1000 62,257.54
15 28(d) Sowing of seeds on trench mound of 4 Meter in length. 4000 Trench 5.99 1 23,960.00
16 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 1600 Kg 35.98 Kg 57,568.00
17 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 8000 Plants 586.52 1000 9,384.32
18 28 (e) Weeding inside the trenches and on mounds of 4 meter length trench 4000 Trench 13.65 Trench 54,600.00
19 28 (f) Scraping of grass and other growth around the trenches & mounds to a width of 60 cm on each side of trenches (4 meter length trench) 4000 Trench 12.41 Trench 49,640.00
20 28 (g) Soil working the trenches by digging with pickaxe to a depth of 15 cm. and to a width of 60 cm. starting from the lower edge of the trench towards the other side of trench of 4 m. length so as to loosen the soil uniformly including scraping around the plant before digging and reformation of damaged mounds during rains. (Trench mound should not be disturbed while soil working) 4000 Trench 21.10 Trench 84,400.00
21 wage Protection of plantation as per the standard norms from 01-07-2027 to 31-03-2028 (for 20 Ha as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 day 170,060.84
22 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 6.60 Km 3080.34 1 20,330.24
23 As per PCCF data Sheet Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 20.00 Nos 162.44 1 3,248.80
24 Sub estimate Maintenance of 10"x16" seedlings till planting during 2026 rains 8800 Pbs 10.79 Each 94,934.40
25 Raising of 10"x16" seedlings for casuality replacement upto 10% during 2028-29 800 Pbs 61.33 Each 49,060.80
26 Ls/RQ Miscellaneous like (Plantation Photos & Documents & Tender Notification Charges Unforeseen & rounding off) - 56,120.000
Total Amount 5,728,700.00
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
Name of the Range : Ballari Location : Toranagallu Sy No 272 Block-I
Budget Head :- CEPMIZ-KMERC (Toranagallu RF Projects) Extent:-20 Ha
Number of Trench :- 200 Trench/ Ha Size of Trench:- 4 M x 1.0 M x 0.75 M
GPS Readings : N-15 12 50.56 E- 76 41 35.03 Total amount 3,993,320
Sl. CSSR Item No. Particulars of the Work Qnty. Rate Per Amount
1 22(d)(ii) Mechanical (through machine) clearance of unwanted growth of Prosopis juliflora trees by uprooting the shrubs/trees over the entire area, heaping, leveling of soil and also retaining native species and after that dragging the cleared material and burning (ii) Average height of PJ below 6 feet 4 Ha 65643.69 Ha 262,575.00
2 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 1440 Rmtrs 1542.78 Km 2,222.00
3 28 (a) Aligning in the planting area along the contours and making for trenches 4,000 Trench 1813.42 1000 7,254.00
4 28 (b) (ii) Excavation of continuous contour trenches of size 4 M x 1.00 M x 0.75 M with uncut portion of 25 cm. In between adjacent trenches and depositing the 1/3rd top soil on the upper slopes & 2/3rd excavated earth on lower slopes of the trenches in - Hard Soil 12,000 Cum 263.78 1 3,165,360.00
5 As per PCCF data Sheet Procurement of seeds for sowing on the mounds of the trenches during next rains. 20 Ha 116.55 1 2,331.00
6 Sub Estimate Raising of 10" X 16" Seedlings including 10% Casuality 8,800.00 Km 61.326 1 539,668.80
7 Sub Estimate Erection Barbed Wire Fencing with wooden fence post for protection of Plantation 0 Km 264,000 Km 0.00
8 - Purchase and fixing of stone pillars including painting of stone for plantation boundary,Laying of sample plots for study, Soil testing, Plantation Photos & Documents Miscellaneous, Unforeseen & rounding off Ls 13,909.20
Grand Total Amount 3,993,320.00 2.00
9 28 (C.) Refilling of trenches cutting the edges of the excavated trench on the lower side and refilling the trench with 75% of the excavated earth duly breaking the clods and formation of uniformly sloping continuous mound all along the lower side of the trench 4000 Trench 26.69 Trench 106,760.00
10 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 8800 Seedl. 6,233.91 1000 54,858.41
(e) Seedlings raised in 10" x 16" size bags
11 24 (e) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
(iv) Seedlings raised in 10" x 16" size bags: Distance from 31 to 40 Kms. 8800 Seedl. 7,995.06 1000 70,356.53
12 25(e) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near eachtrench-10" x 16" Size bagged seedlings 8800 Seedl. 7,334.34 1000 64,542.19
13 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (10" x 16" Seedlings) 8800 Seedl. 1,320.14 1000 11,617.23
14 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 10" x 16"size bagged seedlings 8800 Seedl. 7,074.72 1000 62,257.54
15 28(d) Sowing of seeds on trench mound of 4 Meter in length. 4000 Trench 5.99 1 23,960.00
16 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 1600 Kg 35.98 Kg 57,568.00
17 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 8000 Plants 586.52 1000 9,384.32
18 28 (e) Weeding inside the trenches and on mounds of 4 meter length trench 4000 Trench 13.65 Trench 54,600.00
19 28 (f) Scraping of grass and other growth around the trenches & mounds to a width of 60 cm on each side of trenches (4 meter length trench) 4000 Trench 12.41 Trench 49,640.00
20 28 (g) Soil working the trenches by digging with pickaxe to a depth of 15 cm. and to a width of 60 cm. starting from the lower edge of the trench towards the other side of trench of 4 m. length so as to loosen the soil uniformly including scraping around the plant before digging and reformation of damaged mounds during rains. (Trench mound should not be disturbed while soil working) 4000 Trench 21.10 Trench 84,400.00
21 wage Protection of plantation as per the standard norms from 01-07-2027 to 31-03-2028 (for 20 Ha as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 day 170,060.84
22 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 6.60 Km 3080.34 1 20,330.24
23 As per PCCF data Sheet Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 20.00 Nos 162.44 1 3,248.80
24 Sub estimate Maintenance of 10"x16" seedlings till planting during 2026 rains 8800 Pbs 10.79 Each 94,934.40
25 Raising of 10"x16" seedlings for casuality replacement upto 10% during 2028-29 800 Pbs 61.33 Each 49,060.80
26 Ls/RQ Miscellaneous like (Plantation Photos & Documents & Tender Notification Charges Unforeseen & rounding off) - 62,801.000
Total Amount 5,043,700.00
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
1 32(a) Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design) 1800 Pits 544.16 1000 979
2 32(b)(i) Excavation of pits of size 1 Mtr. x 1 Mtr. x 1Mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil outside the pits (1/3rd top soil to be deposited on the upper side & 2/3rd on the lower side): in ORDINARY soil. 1800 Pits 263.78 1 474804
3 Sub Estimate Cost of raising of 14"x20" seedlings Pbs, including 10% Casuality replacement 1980 Seed 102.676 1 203298
4 Ls/RQ Procurement and application of plant protection and growth promotion compands / material and various unforseen expances including rounding off. - 28919
5 32(.C) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil, duly breaking the clods & formation of saucer shaped mound on the lower side of the pit. 1350 Cum 32.89 1 44401
6 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 1980 Seedl. 13568.87 1000 26866
7 (f) Seedlings raised in 14" x 20" size bags
8 24 (f) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site. 1980 Seedl. 12472.34 1000 24695.2332
9 (iii) Seedlings raised in 14" x 20" size bags: Distance from 21 to 30 Kms.
10 25(f) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near each pits-14" x 20" Size bagged seedlings 1980 Seedl. 14668.68 1000 29043.9864
11 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather - (Flexi) 1980 Seedl. 1320.14 1000 2613.8772
12 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 14" x 20" size bagged seedlings 1980 Seedl. 15721.38 1000 31128.3324
13 29(j) Scraping out of grass and weeds to a radius of 50 cms around the plant, earthening up of soil in the form of a semi-circular slanting saucer shape slope, loosening of boulders if any with soil by using pickaxe and arranging the loosened boulders and soil in semi-circular fashion at the lower side of the plant (Dimension 80 cms diameter and 25 cms depth at deepest point) 1800 Seedl. 15956.21 1000 28721.178
14 RQ Procurement, Transportation & fixing of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet. 1800 Seedl. 51.87 1 93366
15 32 (g) Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (10 branches per tall plant) 1800 Seedl. 44.07 1 79326
16 32 (h) Conveyance of P. J. branches to individual pit, tying P. J. branches around the supporting stake properly covering the tall plant with P. J. thorny branches to a height of more than 2 m and tying the P. J. branches with G. I. wire or equivalent at 3 places (10 P.J. branches to be used for tying the tall seedling). [Alternately phoenix leaves could be used depending on availability]. 1800 Seedl. 51.51 1 92718
17 RQ Purchase of NPK / DAP (50+50=100 gms per plant) 2 times 180 Kg 35.98 Kg 6476.4
19 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 1800 Plants 586.52 1000 2111.472
20 32(j) First Weeding around the plants (pit) to radius of 60 cm 1800 Plants 1833.43 1000 3300.174
21 32(o) Scraping of grass and other growth around the plant (Pits) to a radius of 1m 1800 plants 12637.26 1000 22747.068
22 32(m) Hoeing and soil working with pickaxe around the plant to a depth of 15cm. and to a radius of 60 cm. so as to loosen the soil around the plants (pits only) 1800 plants 7334.34 1000 13201.812
23 41(j)(ii) Watering to the seedlings along roadside and in the city limits at 50 liters/plants 6 times (Nos. are flexi) (One Watering if planted in may, 5 watering in Jan,Feb & Mar) 1800 plants 56.23 1 607284
24 wage Protection of plantation as per the standard norms (One Watcher for 3 km as a unit). 274 days 620.66 day 340121.68
25 RQ Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 6 Nos 4065.88 1 24395.28
26 Sub estimate Maintenance of 14"x20" seedlings till planting 1980 Pbs 13.873 Each 27468.54
27 Raising of 14"x20" seedlings for casuality replacement upto 10% 180 Pbs 102.676 Each 18481.68
28 Ls/RQ Procurement of Clay pots for Drip Irrigation and application of plant protection and growth promotion compands / material and various unforseen expances including rounding off. - 144731.3
Total Amount 2371199.0132
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
1 22(d)(ii) Mechanical (through machine) clearance of unwanted growth of Prosopis juliflora trees by uprooting the shrubs/trees over the entire area, heaping, leveling of soil and also retaining native species and after that dragging the cleared material and burning (ii) Average height of PJ below 6 feet 5 Ha 65643.69 Ha 328218
2 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 1440 Rmtrs 1542.78 Km 2222
3 28 (a) Aligning in the planting area along the contours and making for trenches 4000 Trench 1813.42 1000 7254
4 28 (b) (ii) Excavation of continuous contour trenches of size 4 M x 1.00 M x 0.75 M with uncut portion of 25 cm. In between adjacent trenches and depositing the 1/3rd top soil on the upper slopes & 2/3rd excavated earth on lower slopes of the trenches in - Hard Soil 12000 Cum 263.78 1 3165360
5 Sub Estimate Cost of Raising Seedlings in 10" x 16" PBs, including 10% Casuality Replacement 8800 Seedl. 61.326 1 539668.8
6 LS/RQ Procurement of seeds of suitable local species for sowing on the mounds of the trenches during next rains. 20 Ha 116.55 1 2331
7 - Purchase and fixing of stone pillars including painting for plantation boundary, Laying of sample plots for study, soil testing, Plantation Photos & Documents Miscellaneous, Unforeseen & rounding off Ls 24946
8 28 (C.) Refilling of trenches cutting the edges of the excavated trench on the lower side and refilling the trench with 75% of the excavated earth duly breaking the clods and formation of uniformly sloping continuous mound all along the lower side of the trench 4000 Trench 26.69 Trench 106760
9 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 8800 Seedl. 6233.91 1000 54858.408
10 (e) Seedlings raised in 10" x 16" size bags
11 24 (e) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
12 (iv) Seedlings raised in 10" x 16" size bags: Distance from 31 to 40 Kms. 8800 Seedl. 7995.06 1000 70356.528
13 25(e) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near eachtrench-10" x 16" Size bagged seedlings 8800 Seedl. 7334.34 1000 64542.192
14 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (10" x 16" Seedlings) 8800 Seedl. 1320.14 1000 11617.232
15 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 10" x 16"size bagged seedlings 8800 Seedl. 7074.72 1000 62257.536
16 28(d) Sowing of seeds on trench mound of 4 Meter in length. 4000 Trench 5.99 1 23960
17 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 1600 Kg 35.98 Kg 57568
19 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 8000 Plants 586.52 1000 9384.32
20 28 (e) Weeding inside the trenches and on mounds of 4 meter length trench 4000 Trench 13.65 Trench 54600
21 28 (f) Scraping of grass and other growth around the trenches & mounds to a width of 60 cm on each side of trenches (4 meter length trench) 4000 Trench 12.41 Trench 49640
22 28 (g) Soil working the trenches by digging with pickaxe to a depth of 15 cm. and to a width of 60 cm. starting from the lower edge of the trench towards the other side of trench of 4 m. length so as to loosen the soil uniformly including scraping around the plant before digging and reformation of damaged mounds during rains. (Trench mound should not be disturbed while soil working) 4000 Trench 21.1 Trench 84400
23 wage Protection of plantation as per the standard norms from 01-07-2026 to 31-03-2027 (for 20 Ha as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 day 170060.84
24 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 6.6 Km 3080.34 1 20330.244
25 RQ Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 20 Nos 162.44 1 3248.8
26 Sub estimate Maintenance of 10"x16" seedlings till planting during 2026 rains 8800 Pbs 10.788 Each 94934.4
27 Raising of 10"x16" seedlings for casuality replacement upto 10% during 2027-28 800 Pbs 61.326 Each 49060.8
28 Ls/RQ Miscellaneous like (Plantation Photos & Documents & Tender Notification Charges Unforeseen & rounding off) - 56120.9
Total Amount 5,113,700.00
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
1 22(d)(ii) Mechanical (through machine) clearance of unwanted growth of Prosopis juliflora trees by uprooting the shrubs/trees over the entire area, heaping, leveling of soil and also retaining native species and after that dragging the cleared material and burning (ii) Average height of PJ below 6 feet 5 Ha 65643.69 Ha 328218
2 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 1800 Rmtrs 1542.78 Km 2778
3 29(b) Aligning in the planting area along to the contours and making for pit (without Staking) 6950 Pits 580.08 1000 4032
4 29(C.) (ii) Excavation of pits by mechanical of size by 0.75m x 0.75m x 0.75m with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in - Hard Soil 2932.205 Pits 307.85 1 902680
5 Sub Estimate Cost of Raising Seedlings in 10" x 16" PBs, including 10% Casuality Replacement 7650 Seedl. 61.326 1 469143.9
6 - Purchase and fixing of stone pillars including painting for plantation boundary demarcation, Laying of sample plots for study, soil testing, Plantation Photos & Documents Miscellaneous, Unforeseen & rounding off Ls 28148.1
7 29 (d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods & arranging the remaining soil on the lower slope. (0.75x0.75x0.75=0.4219 Cum x278 Pit =117.2882 Cum *75% =87.9662 cum 2199.155 Cum 32.89 Cmtr 72330.20795
8 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 7650 Seedl. 6233.91 1000 47689.4115
9 (e) Seedlings raised in 10" x 16" size bags
10 24 (e) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
11 (iv) Seedlings raised in 10" x 16" size bags: Distance from 31 to 40 Kms. 7650 Seedl. 7995.06 1000 61162.209
12 25(e) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near each pits-10" x 16" Size bagged seedlings 7650 Seedl. 7334.34 1000 56107.701
13 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (10" x 16" Seedlings) 7650 Seedl. 1320.14 1000 10099.071
14 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 10" x 16" size bagged seedlings 7650 Seedl. 7074.72 1000 54121.608
15 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 1390 Kg 35.98 Kg 50012.2
17 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 6950 Plants 586.52 1000 8152.628
18 29(e)(i) First Weeding around the plants (pit) to radius of 60 cm 6950 Plants 1833.43 1000 12742.3385
19 29 (i) (iii) Scraping of grass and other growth around the plant (Pits) to a radius of 60 cm. 6950 plants 4547.58 1000 31605.681
20 29 (m) Hoeing and soil working with pickaxe around the plant to a depth of 15cm. and to a radius of 60 cm. so as to loosen the soil around the plants (pits only) 6950 plants 7334.34 1000 50973.663
21 RQ Procurement & transportation of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet. 6950 plants 51.87 each 360496.5
22 wage Protection of plantation as per the standard norms from 01-07-2027 to 31-03-2028 (for 25Ha as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 day 170060.84
23 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 8.25 Km /Ha 3080.34 1 25412.805
24 RQ Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 25 Nos 162.44 1 4061
25 Sub estimate Maintenance of 10"x16" seedlings till planting during 2026 rains 7650 Pbs 10.788 Each 82528.2
26 Raising of 10"x16" seedlings for casuality replacement upto 10% during 2028-29 700 Pbs 61.326 Each 42928.2
27 Ls/RQ Miscellaneous like (Plantation Photos & Documents & Tender Notification Charges Unforeseen & rounding off) - 70165.74
Total Amount 2,945,650.00
Estimate for Raising of Seedlings, Monsoon Plantation including its maintenance during the year 2026-27 & 2027-28
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 1440 Rmtrs 1542.78 Km 2222
2 28 (a) Aligning in the planting area along the contours and making for trenches 4000 Trench 1813.42 1000 7254
3 28 (b) (ii) Excavation of continuous contour trenches of size 4 M x 1.00 M x 0.75 M with uncut portion of 25 cm. In between adjacent trenches and depositing the 1/3rd top soil on the upper slopes & 2/3rd excavated earth on lower slopes of the trenches in - Hard Soil 12000 Cum 263.78 1 3165360
4 As per PCCF data Sheet Procurement of seeds for sowing on the mounds of the trenches during next rains. 20 Ha 116.55 1 2331
5 Sub Estimate Raising of 10" X 16" Seedlings including 10% Casuality 8800 Km 61.326 1 539668.8
6 - Purchase and fixing of stone pillars including painting of stone for plantation boundary,Laying of sample plots for study, Soil testing, Plantation Photos & Documents Miscellaneous, Unforeseen & rounding off Ls 23164.2
7 28 (C.) Refilling of trenches cutting the edges of the excavated trench on the lower side and refilling the trench with 75% of the excavated earth duly breaking the clods and formation of uniformly sloping continuous mound all along the lower side of the trench 4000 Trench 26.69 Trench 106760
8 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 8800 Seedl. 6233.91 1000 54858.408
9 (e) Seedlings raised in 10" x 16" size bags
10 24 (e) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
11 (iv) Seedlings raised in 10" x 16" size bags: Distance from 31 to 40 Kms. 8800 Seedl. 7995.06 1000 70356.528
12 25(e) Conveyance of polythene / HDPE bagged seedlings as head loads from the dumping site to planting location near eachtrench-10" x 16" Size bagged seedlings 8800 Seedl. 7334.34 1000 64542.192
13 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (10" x 16" Seedlings) 8800 Seedl. 1320.14 1000 11617.232
14 27 Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. (e) 10" x 16"size bagged seedlings 8800 Seedl. 7074.72 1000 62257.536
15 28(d) Sowing of seeds on trench mound of 4 Meter in length. 4000 Trench 5.99 1 23960
16 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 1600 Kg 35.98 Kg 57568
18 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 8000 Plants 586.52 1000 9384.32
19 28 (e) Weeding inside the trenches and on mounds of 4 meter length trench 4000 Trench 13.65 Trench 54600
20 28 (f) Scraping of grass and other growth around the trenches & mounds to a width of 60 cm on each side of trenches (4 meter length trench) 4000 Trench 12.41 Trench 49640
21 28 (g) Soil working the trenches by digging with pickaxe to a depth of 15 cm. and to a width of 60 cm. starting from the lower edge of the trench towards the other side of trench of 4 m. length so as to loosen the soil uniformly including scraping around the plant before digging and reformation of damaged mounds during rains. (Trench mound should not be disturbed while soil working) 4000 Trench 21.1 Trench 84400
22 wage Protection of plantation as per the standard norms from 01-07-2027 to 31-03-2028 (for 20 Ha as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 day 170060.84
23 82 Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 6.6 Km 3080.34 1 20330.244
24 As per PCCF data Sheet Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 20 Nos 162.44 1 3248.8
25 Sub estimate Maintenance of 10"x16" seedlings till planting during 2026 rains 8800 Pbs 10.788 Each 94934.4
26 Raising of 10"x16" seedlings for casuality replacement upto 10% during 2028-29 800 Pbs 61.326 Each 49060.8
27 Ls/RQ Miscellaneous like (Plantation Photos & Documents & Tender Notification Charges Unforeseen & rounding off) - 56120.7
Total Amount 4,783,700.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Revised Tender Notification for Afforestation Works During 2026 to 2028.pdf
Tender Document • 0.25 MB
Data Sheet For Tender.xlsx
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .