Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
3 Aug 2026, 3:00 pm
Provision of retaining wall, earthwork in embankment, stone pitching (as river training works) and jacketing work at Important Bridge No.110 in the section of ADEN-II/LKO under the jurisdiction of Sr.DEN-V/LKO. (Estt. No. 142-2026)
06-Sr-DEN-V-LKO-2026-27
06-Sr-DEN-V-LKO-2026-27
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹5.2 L
10 Jul 2026
10 Jul 2026
20 Jul 2026
Item Breakup - A-All USSOR-2021 items (Rate of inclusive of all taxes including GST @ 18%)
cum Turfing / planting, including all lead & lift and watering as required until properly rooted with. Note: Initially payment of only 40% will be made. Balance 60% will be paid after 3 months of maintenance period, only if the turfing is properly rooted on entire turfed area.
100 Turfing with planted doob grass. Sqm Total 5556701.30 Item- 2 Chapter 02: Bridge works- Sub Structure S No. Item Description of Item Unit Qty Rate Amount No LUCKNOW-NR-DIVISION-ENGINEERING/NORTHERN RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
cum Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
220.00 graded stone aggregate 20 mm nominal size) Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
75.00 Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in- Charge. Centering and shuttering including strutting, propping etc. and removal of form for : LUCKNOW-NR-DIVISION-ENGINEERING/NORTHERN RLY
1000.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
170.00 batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site using 20mm graded crushed stone aggregate and coarse sand of approved quality in jacketing of piers and abutments from bottom of foundation up to a height of 10m for designed thickness of jacketing including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be paid extra under relevant item. 2. Plasticizer shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticisers at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over 025040 for drilling of holes and insertion of dowel bars in case of Jacketing
dia. jacketing / anchoring
100.00 dia. (cost of rods to be paid extra) Supply and using Cement at Worksite
175.00 brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
18000.00 Fe-500D or more of approved brands/makes. Total 6084820.75 Item- 3 Chapter 03: Bridge Works - Super Structure (RCC) S No. Item Description of Item Unit Qty Rate Amount No
750.00 coats on existing bottom surface of deck slab including cleaning surface of dirt, dust & other foreign matter, sand papering, wire brushing as required with all contractor's materials tools, machinery, scaffolding, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge Total 206512.50 Item- 4 Chapter 05: Bridge Works-Miscellaneous S No. Item Description of Item Unit Qty Rate Amount No
750.00 bed for protection against scour with stone boulders weighing not less than 35 kg each with voids filled with spalls complete as per drawing and Technical Specification. LUCKNOW-NR-DIVISION-ENGINEERING/NORTHERN RLY
950.00 Boulders, weighing not less than 35kg each with voids filled with cement sand mortar 1:4 on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). Rate is excluding cost of cement which shall be paid extra under relevant item.
300.00 RDSO Specifications underneath pitching in slopes complete as per drawing and Technical Specification. Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
750.00 compound w.r.t. cement.
300.00 combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification with average thickness of 10mm including priming coat, mortar plaster and seal coat of epoxy.
5500.00 from any location. Payment to be done for Hour Horse power of pump multiplied by pumping hours. Designing and developing Detailed structural and working Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof-checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in-charge.
/ piers/abutments
1.00 114393.67 retaining wall, abutment and approach slab Total 12063528.64 Item- 5 Chapter 11:Formation Rehabilitation S No. Item Description of Item Unit Qty Rate Amount No LUCKNOW-NR-DIVISION-ENGINEERING/NORTHERN RLY
1000.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 438210.00 Item- 6 Chapter 13:Maintenance Activities S No. Item Description of Item Unit Qty Rate Amount No Painting 2 coats to Bridge Reference / Boards, Structures etc. along track with enamel paint of approved make with different colours & letters, as directed by Engineer in-charge.
Each Total 1902.42 Item- 7 Chapter 21: Miscellaneous items S No. Item Description of Item Unit Qty Rate Amount No Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
600.00 minimum 1.10 cum bucket capacity
125.00 crane of 12T capacity for misc. works of handling of material Total 624966.50
Item Breakup - B-All DSR-2021 items(Rate of inclusive of all taxes including GST @ 18%)
A-All USSOR-2021 items (Rate of inclusive of all taxes including GST @
B-All DSR-2021 items(Rate of inclusive of all taxes including GST @
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
06-TenderDocument.pdf
ATTACHMENT
Download all tender documents and submit your bid