Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹8.2 L+₹18,628.17 (2.32%)Rejected-Finance | ₹8.2 L+₹18,628.17 (2.32%) | L2 | Rejected-Finance Rates are on higher side |
| 3 | L3₹8.5 L+₹48,552.29 (6.05%)Rejected-Finance | ₹8.5 L+₹48,552.29 (6.05%) | L3 | Rejected-Finance Rates are on higher side |
| 4 | L4₹9.3 L+₹1.3 L (16.3%)Rejected-Finance H NO 104 BASANT VIHAR KARNAL | KARNAL | HARYANA | 132001 | ₹9.3 L+₹1.3 L (16.3%) | L4 | Rejected-Finance Rates are on higher side |
| Sl No | Description | Qty | Unit | Vardaan Construction L4 | AJAY SINGH CONTRACTOR RETAULI L3 | yadvi construction company L1 | swastik contractor L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply and Fixing of Street Light 90/100 watt Crompton Make. (Havells/Crompton/Philips) complete as per DNIT..... | 24 | Each | 4,500 ₹1,08,000 | 3,200 ₹76,800 | 2,200 ₹52,800 Lowest | 3,000 ₹72,000 |
| 2.00 | S/E of 3-Pin top for LED street light connection(Anchor/SSK/Bajaj) complete as per DNIT..... | 24 | Each | 39 ₹936 | 50 ₹1,200 | 30 ₹720 Lowest | 50 ₹1,200 |
| 3.00 | P/F of LED bulb 14/15-watt complete as per DNIT (Syska/Havells and Philips) ..... | 30 | Each | 100 ₹3,000 Lowest | 300 ₹9,000 | 100 ₹3,000 Lowest | 100 ₹3,000 Lowest |
Tender Value
₹10.6 L
EMD Value
₹21,180
Closing Date
20 Apr 2026, 3:00 pmClosed
Naresh Kumar
Bays No 15-18 Sector 2 Panchkula
ESTIMATE FOR RE-WIRING IN GODOWN AND PROVISION OF STREET LIGHT AT PEHOWA OLD and NEW CAMPUS
2026_HBC_514220_1
20263A343B52 9CE2 4DC6 BBFE 1C73037C24F31135HWC
Open Tender
Civil Works
Works
30 days
Pehowa
2 documents required · 2 mandatory
₹1,180
₹21,180
Yes
30 Jun 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and Fixing of Street Light 90/100 watt Crompton Make. (Havells/Crompton/Philips) complete as per DNIT..... | - | Each | - | - |
| 2 | S/E of 3-Pin top for LED street light connection(Anchor/SSK/Bajaj) complete as per DNIT..... | - | Each | - | - |
| 3 | P/F of LED bulb 14/15-watt complete as per DNIT (Syska/Havells and Philips) ..... | - | Each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_593046.xls
BOQ • 0.26 MB
AD0158648.pdf
Additional Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .