| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.3 Cr+₹2.3 L (1.86%)Rejected-Finance 95 PAVALI ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹1.3 Cr+₹2.3 L (1.86%) | L2 | Rejected-Finance Reject |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
10 Jan 2025, 3:00 pmClosed
the Project Director, DRDA, Virudhunagar District.
the Project Director, DRDA, Virudhunagar District.
Strengthening of the Thlukankurichi District limit - Sevalpatti road to Varakanur road km 0/0 - 2/ 165 of Virudhunagar District under NABARD - RIDF - XXX - 2024-25
2024_RDTN_514956_31
DIPR/5603/TENDER/2024 Dt 26.12.2024
Open Tender
Civil Works
Item Rate
120 days
Virudhunagar
Please refer Tender Document
5 documents required · 5 mandatory
₹0
₹1.2 L
the Project Director, DRDA, Virudhunagar District.
10 Mar 2025
1 Jan 2025
10 Jan 2025
1 Jan 2025
10 Jan 2025
1 Jan 2025
2 Jan 2025
Amount
Part-1:- Strengthening of the Thlukankurichi District limit - Sevalpatti road to Varakanur road
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soils, such as gravelly soil hard red earth shales, murrams gravel stoney earth and earth mixed with 50% lair sized boulders and hard gravel soil exept sand and hard rock requiring blasting as per SS 20A (Box cutting)
Picking the existing old metal for the B.T. surface and sectioning the undulations and all compacting charges etc., complete
Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 1
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying Bituminous Concrete (BC) with plastic of 25mm thick based on Job Mix Formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving CRMB 55 penetration grade3 (IS:73) and aggregates conforming to grading 2 of Table 500 - 5 of MORT & H specifications and BC shall be laid using sensor paver finisher to the required level, grade and compacting to atleast 98% of laboratory Marshall desnity as per clause 509 complete.
Providing and fixing of KM stones for standard specification
Providing and fixing of HM stones for standard specification
Provision for Sign Board etc
Provision for Road Marker Road / Stud with lens Reflector
Providing and fixing of Name Board cum Citizen Board standard specification
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Culvert ch - 147 m
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Collection and supply of Msand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:3:6 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Centering charges for all RCC works including all cost and conveyance etc., complete
Centering charges for all RCC works including all cost and conveyance etc., complete
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
RCC 1:11/2:3 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard
Provision for Culvert ch - 1045 m
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Collection and supply of Msand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:3:6 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Centering charges for all RCC works including all cost and conveyance etc., complete
Centering charges for all RCC works including all cost and conveyance etc., complete
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
RCC 1:11/2:3 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard
Provision for Culvert ch - 1665 m
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Collection and supply of Msand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:3:6 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Centering charges for all RCC works including all cost and conveyance etc., complete
Centering charges for all RCC works including all cost and conveyance etc., complete
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
RCC 1:11/2:3 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard
Constrution of Retaining wall ch 722 m
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
centering and Shuttering for Roof Slab Work including cost and conveyance of all materials to site and all labour charges etc complete
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GMARIAPPANANDCO (BID ID -1229128)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .