Tender Value
₹1.6 Cr
EMD Value
₹2.4 L
Closing Date
20 Aug 2026, 11:00 pmClosed
Minor Irrigation Department
xxxxxxxxxx
Construction of Checkdam across Halla near Kolagallu village in Ballari Taluk of Ballari District.
MI/2026-27/AB/WORK_INDENT12445
MI/2026-27/AB/WORK_INDENT12445
Open
Construction of Anicuts - Barrages
Two Tender Document System(Two Cover)
Minor Irrigation Division Bellary
5 documents required · 5 mandatory
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Satisfactorily completed (at least 90% of contract value) in the last five years (i.e. 2021-22 to 2025-26), as a prime contractor, at least one similar work such as Construction of Bridge CumBarrage /Checkdam / Anicut Pickup Bandara/Bridges of value not less than Rs.80.54 Lakhs. The weightage of 10% will be given per year to bring them to the price level of the FY 2026-27. (Work done must clearly mention the corresponding Indent Number)
Tenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years i.e. 2021-22 to 2025-26 (updated to 2026-27 price level) taking into account the completed as well as works in progress. N, Number of years 06 months prescribed for completion of the works for which tenders are invited. B, Value, at 2026-27 price level, of existing commitments and on-going works to be completed during the next 06 months (06/12 (0.50) year i.e. period of completion of the works for which Tenders are invited. (B Value, at 2026-27 price level, of existing commitments and on-going works should be upload in KPPP Portal)
Section 3, Qualification Information
Executed in any one year, during the last five years ( 2021-22 to 2025-26) the following minimum quantities of work 1.Earthwork in both Desilting ,excavation & embankment (combined quantities) : 17123.00 Cum 2. Cement concrete (including RCC and PCC ) : 1266.00 Cum 3. Supply and Fabrication/Reinforcement steel : 15.00 Tonne 4.Stone Pitching / Revetment :634.00 Sqm
Achieved in at least two financial years during the last five years (i.e. 2021-22 to 2025-26) a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.322.17 Lakhs. Financial turn over of previous years will be given a weightage of 10% per year to bring to them to the price level of the FY 2026-27.
Liquid assets and /or availability of credit facilities of not less than Rs. 81.46 Lakhs Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc
Contractor Registration certificate (Class 3 and Above) PWD REGISTERATION CERTIFICATE
The contractor shall quote the rates without adding GST either materials or works contract Service.GST payable by the Contractor under this works Contract will be paid to the Contractor separately over and above the Contractor s bid amount. The increase if any in the GST shall not be paid in the extended period of Contract for which the Contractor alone is responsible for delay as determined by the Authority.
As per the Govt Ltr No MID/338/MIS/2026 Bangalore Dt : 13.04.2026 the cost of work should not exced the grant provided of Rs. 200.00 lakhs for this work hence contractor shall note that, the work will not be awarded over the estimated amount of this work.
₹4,030
₹2.4 L
12 Aug 2026
12 Aug 2026
24 Aug 2026
19 Aug 2026
18 Aug 2026
Construction of Checkdam across Halla near Kolagallu village in Ballari Taluk of Ballari District.
Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloading and as per spe...
De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machin...
Earth work excavation for Foundation by mechanical means for all works & required depth, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lig...
Earth work excavation for Foundation by mechanical means for all works &required depth , as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lig...
Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from required heigh...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing casing embankment using semi-pervious / pervious soil from dump areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations ...
Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complet...
Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate i...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kolagallu dwgs.pdf
Design Document • 0.74 MB
kw-4 kolagallu.doc
Tender Document • 22.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .