| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC D 39 DIVYA NAGAR GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹12.4 L | L1 | Accepted-AOC Found Lowest Rate |
| 2 | L2₹14.3 LRejected-Finance PADAV CHANDAULI | ₹14.3 L | L2 | Rejected-Finance others bidders found lowest rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MODERN ENGINEERING WORKS L2 | M/S SHUBHAM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.10 | Repairing of 1475 KW Crompton make squirrel cage 3-phase induction type H.T motor by shifting from foundation ,dismantling ,taking out rotor ,stator,cleaning of rotor& stator with overhead braiding and drying it by heating up to completion ,taking out over heated/damage 72 nos. coils and repairing of 48 no coils and reinsulation of 72 nos .coils by removing damaged insulation and insulating with F class insulating materials as required for proper insulation.Rewinding of H.T stator by inserting 72 nos cols in stator checking of rotors bars by dye penitration test,spray varnishing of stator and rotor with bectol red gel epoxy resin and heating to reach required IR value.Reassembly of motor shifting from working place to foundation alignment of motor with pump Radially and axially both by using SS Shims rubber coupling bushes etc as per required then testing on NO load complete in all respect at SPC IIIrd stage. | 1 | Job | 14,33,997 ₹14.3 L | 12,39,372 ₹12.4 L |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
1 Dec 2025, 10:00 amClosed
EE SMCD VARANASI
O/O EE SMCD VARUNAPURAM SICHAI COLONY SIGRA VARANASI
Repairing/Rewinding of 6.6KV 1475 KW H.T Motor
2025_UPIDM_1093016_1
05/EE/SMCD/25-26
Open Tender
Pumps/Motors
30 days
SONE PUMP CANAL STAGE 3 CHURK DIST-SONEBHADRA
Please Refer Tender Documents
3 documents required · 3 mandatory
₹2,354
₹32,000
30 Dec 2025
22 Nov 2025
1 Dec 2025
22 Nov 2025
1 Dec 2025
22 Nov 2025
22 Nov 2025 - 28 Nov 2025
Amount
Repairing of 1475 KW Crompton make squirrel cage 3-phase induction type H.T motor by shifting from foundation ,dismantling ,taking out rotor ,stator,cleaning of rotor& stator with overhead braiding and drying it by heating up to completion ,taking out over heated/damage 72 nos. coils and repairing of 48 no coils and reinsulation of 72 nos .coils by removing damaged insulation and insulating with F class insulating materials as required for proper insulation.Rewinding of H.T stator by inserting 72 nos cols in stator checking of rotors bars by dye penitration test,spray varnishing of stator and rotor with bectol red gel epoxy resin and heating to reach required IR value.Reassembly of motor shifting from working place to foundation alignment of motor with pump Radially and axially both by using SS Shims rubber coupling bushes etc as per required then testing on NO load complete in all respect at SPC IIIrd stage.
MODERN ENGINEERING WORKS (BID ID -5709671)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
05EESMCD.pdf
Tender Documents • 0.79 MB
BOQ_2008507.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid