| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | L G S ENTERPRISES L1 | SRI VAARI TOTALGAZ DISTRIBUTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 81 | Cum | 200 ₹16,200 | 300 ₹24,300 |
| 2.00 | Plain Cement Concrete 1:5:10 (one cement, five fine aggregates and ten coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 1 | Cum | 5,617 ₹5,617 | 5,700 ₹5,700 |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed | 10 | Sqm | 732 ₹7,320 | 830 ₹8,300 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | Cum | 6,800 ₹34,000 | 6,900 ₹34,500 |
| 5.00 | Plastering with cement mortar (1:3) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications | 3 | Sqm | 629 ₹1,887 | 730 ₹2,190 |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 135 | Kg | 96 ₹12,960 | 195 ₹26,325 |
| 7.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 100 mm thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 9 | Cum | 973 ₹8,757 | 1,074 ₹9,666 |
| 8.00 | Supply and delivery of 450mm dia NP2 RCC Pipe including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification. | 148 | Rm | 1,721 ₹2.5 L | 1,820 ₹2.7 L |
| 9.00 | Supply and delivery of 450mm dia NP2 RCC Collor including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification. | 62 | Nos | 249 ₹15,438 | 350 ₹21,700 |
| 10.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification. | 148 | Rm | 133 ₹19,684 | 235 ₹34,780 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
21 Jan 2026, 3:00 pmClosed
THE COMMISIONER
hosur city municipal corporation bagalur road
Providing 450mm dia Sewer Line at Ward No. 21 Manjunatha Layout Culvert to AVS Residency Main Road in Hosur City Municipal Corporation
2026_MAWS_639189_10
15490-2/2025/E1/hosur city municipal corporation
Open Tender
Civil Works
90 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,500
28 Mar 2026
5 Jan 2026
21 Jan 2026
5 Jan 2026
21 Jan 2026
5 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:5:10 (one cement, five fine aggregates and ten coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar (1:3) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 100 mm thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.
Supply and delivery of 450mm dia NP2 RCC Pipe including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification.
Supply and delivery of 450mm dia NP2 RCC Collor including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification.
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment including cost of material, labour charges and all other incidental charges etc., complete as per standard Specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_765199.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid