| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43,291Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹53,970+₹10,679 (24.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹60,551+₹17,260 (39.9%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Pungotra Electricals L1 | M/s Wazir Agencies L3 | M/S SURYA ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 25 KVA DTR | ||||||
| 1.01 | Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job. | 1 | Job | 360 ₹360 | 302 ₹302 | 200 ₹200 Lowest |
| 1.02 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs) | 1 | Set | 185 ₹185 | 122 ₹122 Lowest | 150 ₹150 |
| 1.03 | Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs) | 1 | Set | 264 ₹264 | 218 ₹218 | 200 ₹200 Lowest |
| 1.04 | Labour Charges for cleaning & washing of transformer tank, radiators top covers etc. | 1 | Job | 50 ₹50 | 63 ₹63 | 40 ₹40 Lowest |
| 1.05 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any | 1 | Job | 50 ₹50 | 75 ₹75 | 10 ₹10 Lowest |
| 1.06 | Labour Charges for painting of Transformer tank, radiators (Complete Job). | 1 | Job | 120 ₹120 | 159 ₹159 | 10 ₹10 Lowest |
| 1.07 | Impregnation and heat treatment of coils | 1 | Job | 315 ₹315 | 261 ₹261 | 200 ₹200 Lowest |
| 1.08 | Shifting/Draging of damaged DTs from stacking site to workshop for repair | 1 | Job | 50 ₹50 | 30 ₹30 Lowest | 30 ₹30 Lowest |
| 1.09 | Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank | 1 | Job | 50 ₹50 | 30 ₹30 Lowest | 30 ₹30 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
7 Nov 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, ECWD, Jammu
Repair-Reclamation of Damaged DT of different capacities viz 25 KVA, 50-63 KVA, 100 KVA, 200-250 KVA, 300-400 KVA, 500-630 KVA and 800 KVA at ECWD, Jammu
2024_PDD_260604_1
ECWD-J-Repair of DTs-04 of 2024
Open Tender
Electrical and Maintenance Works
Item Rate
3 days
Narwal
Please refer tender documents
3 documents required · 3 mandatory
₹3,000
Yes
Executive Engineer, ECWD, Jammu
₹3 L
Yes
Executive Engineer, ECWD, Jammu
16 Nov 2024
17 Oct 2024
9 Nov 2024
17 Oct 2024
7 Nov 2024
17 Oct 2024
17 Oct 2024 - 25 Oct 2024
28 Oct 2024
Amount
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 25 KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 50/63KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 100KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 200/250 KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 300/400KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 500/630KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Repair/Reclamation of Damaged Distribution Transformers (11KV/6.6KV/0.44KV) 800KVA DTR
Opening of transformer, draining of oil, opening of HV /LV connections, taking out core, opening of side channel lamination complete job.
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage HT Coils (Three limbs)
Taking out of all the coils after opening the connection and inspection of coils to ascertain the damage LT Coils (Three limbs)
Labour Charges for cleaning & washing of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Labour Charges for painting of Transformer tank, radiators (Complete Job).
Impregnation and heat treatment of coils
Shifting/Draging of damaged DTs from stacking site to workshop for repair
Shifting/Draging of Transformer tank from repair site to stacking site and back for refitting (to make space in workshop area for repair activities) for cleanliness of tank
Shifting/Draging of Transformer tank from stacking site to painting site and back to stacking site after painting
Shifting/Draging of repaired DT to testing site and after testing to stacking site
Winding of HV Leg Coil (Copper/Aluminium).
Winding of LV Leg Coil (Copper/Aluminium).
Rewinding of LV leg (Copper/Aluminium).
Labour charges for filtration of transformer oil
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core, refitting & testing of transformer.
Testing of Repaired Transformer
High Voltage Test (28 KV for 60 Sec) HV Side
High Voltage Test (3 KV for 60 Sec) LV Side
Open Circuit Test
Short Circuit Tes
And Other Relevant Tests
M/S SURYA ENTERPRISES (BID ID -2218814)
M/s Wazir Agencies (BID ID -2219715)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 1.39 MB
BOQ_780824.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .