Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance J 38 ASHIANA SHRI RAJ BHAWAN KANPUR ROAD ASHIANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | Admitted-Finance |
| 3 | Admitted-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹61.8 L
EMD Value
₹1.2 L
Closing Date
3 Mar 2023, 3:00 pmClosed
AGM (CE), FCI RO (Mah)
FCI RO (Mah)
Systematic Maintenance Contract of Railway Siding at FSD Borivali during the year 2023-24
2023_FCI_741323_1
RO MH-22.0044.0(25.0)/1/2022-CIVI Engi - BORIVALI
Open Tender
Civil Works
Item Rate
365 days
FSD Borivali
Please refer tender document
3 documents required · 3 mandatory
₹0
₹1.2 L
11 Apr 2023
18 Feb 2023
4 Mar 2023
18 Feb 2023
3 Mar 2023
18 Feb 2023
Amount
Systematic maintenance of Railway track in the private railway siding of FSD Borivali for all items as included in the Technical specification Para No. 3.0 to 3.9 on annual programme basis.
Supply of 60 kg pre stresses (pre tensioned type) mono block concrete sleepers (Class-I) for 52 kg/60 kg rail section, Broad gauge, as per RDSO drawing No. T-2496 (with latest alterations, if any) and IRS specification T-39 (with latest alterations, if any) and as per directions of Engineer-in-charge, duly inspected by Railways or its authorised in-specting agency at manufacturers work site. The rate includes cost of all materials, labours, loading, transportation, unloading, stacking, taxes, octroi, levies, inspection charges etc. complete (should be fit for track circuit). (Note: All materials should be supplied within 3 months from the date of issue of work order.)
Replacement of sleepers in track with sleepers ly-ing on cess for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor’s tools including pack-ing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over. BG Track (Wooden / Metal to PSC sleepers)
Supply of Elastic Rail Clips (Class-I) for 90R, 52/60 kg rail section on 52/60 kg BG PSC Sleepers as per RDSO Drg. No. T-3701 (with latest alterations, if any) and conforming to IRS specification T-31 (with latest alterations, if any) and as per directions of Engineer-in-charge, duly inspected by Railways or its authorised inspecting agency at manufacturers work site. The rate includes cost of all materials, labours, loading, transportation, unloading, stacking, taxes, octroi, levies, inspection charges etc. complete. (Note: All materials should be supplied within 3 months from the date of issue of work order.) (One set constitutes of two outer & two inner clips)
Supply of Metal liners (Class-I) for use with ERC for 90R, 52/60 kg rail section on 52/60 kg BG PSC Sleepers as per RDSO Drg. No. T-3741 & T-3742 (with latest alterations, if any) and conforming to IRS specification T-56 (with latest alterations, if any) and as per directions of Engineer-in-charge, duly inspected by Railways or its authorised in-specting agency at manufacturers work site. The rate includes cost of all materials, labours, loading, transportation, unloading, stacking, taxes, octroi, levies, inspection charges etc. complete. (Note: All materials should be supplied within 3 months from the date of issue of work order.) (One set consti-tutes of two outer & two inner liners)
Supply of Grooved Rubber sole plates (Class-I) for 90R, 52/60 kg rail section on 52/60 kg BG PSC Sleepers as per RDSO Drg. No. T-3703 (with latest alterations, if any) and conforming to IRS specifica-tion T-47 (with latest alterations, if any) and as per directions of Engineer-in-charge, duly inspected by Railways or its authorised inspecting agency at manufacturers work site. The rate includes cost of all materials, labours, loading, transportation, un-loading, stacking, taxes, octroi, levies, inspection charges etc. complete. (Note: All materials should be supplied within 3 months from the date of issue of work order.) (One set constitutes of two nos.)
Supplying and stacking of approved quality of stone ballast of 50 mm gage clean, angular, hard and durable track ballast as per RDSO specification and stacking the same on cess of the formation or toe of the bank or at suitable places as per directions of Engineer-in-charge. The rate includes all cost of lead, lift, royalty, taxes and duties and all inci-dental charges, testing in lab complete as applica-ble. Tools and plants and screens of approved mesh and dimensions required for inspection and passing at the time of measurements/supply are to be arranged by the contractor. The rate also in-cludes levelling of ground. If necessary, where the ballast are to be stacked and as directed by Engi-neer-in-charge. (Note: All materials should be sup-plied within 3 months from the date of issue of work order.)
Credit for taking away dismantles unserviceable obsolete railway material as is where is basis in-cluding GST etc. complete. CI pot railway sleepers
DeviMaaShakti Constructions and Consultancy Services Pvt Ltd
Ms P B KUNDU
armaity
R. K. MISHRA & SONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .