| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹19.8 L−₹7,109.94 (0.36%)Accepted-AOC | H2 | Accepted-AOC Lowest Tender Rate | |
| 2 | H1₹19.9 LRejected-Finance | H1 | Rejected-Finance Highest Amount |
| Sl No | Description | Qty | Unit | SRI MUNIAPPAN CONSTRUCTION H1 | PALANIAPPAN AND CO H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary as per SS 20 B for foundation.. | 29.68 | Cum | 300 ₹8,904 | 295.82 ₹8,779.94 Lowest |
| 2.00 | Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 45.22 | Cum | 6,530 ₹2,95,286.6 | 6,519.8 ₹2,94,825.36 Lowest |
| 3.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc | 201.4 | Sqm | 610 ₹1,22,854 | 605 ₹1,21,847 Lowest |
| 4.00 | Cement concrete in 1:2:4 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 53.53 | Cum | 7,990 ₹4,27,704.7 | 7,962.97 ₹4,26,257.78 Lowest |
| 5.00 | Provision for Bitumen Pad | 13.5 | KK | 250 ₹3,375 | 234.3 ₹3,163.05 Lowest |
| 6.00Construction of Culvert | |||||
| 7.00 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary as per SS 20 B for foundation.. | 22.8 | Cum | 300 ₹6,840 | 295.82 ₹6,744.7 Lowest |
| 8.00 | Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 1.8 | Cum | 6,530.8 ₹11,755.44 | 6,519.8 ₹11,735.64 Lowest |
| 9.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc | 28 | Sqm | 610 ₹17,080 | 605 ₹16,940 Lowest |
| 10.00 | Cement concrete in 1:3:6 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 13.52 | Cum | 6,864.96 ₹92,814.26 Lowest | 6,864.96 ₹92,814.26 Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
31 Jul 2025, 3:00 pmClosed
Block Development Officer(VP), Anthiyur
Block Development Office, Anthiyur
Providing Cement Concrete Pavement at Middle Solaganai HO Burgur
2025_RDTN_582725_1
1118/2025-Burgur
Open Tender
Civil Works - Roads
Item Rate
Block Development Office, Anthiyur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹40,000
Yes
6 Aug 2025
22 Jul 2025
31 Jul 2025
22 Jul 2025
31 Jul 2025
22 Jul 2025
Amount
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary as per SS 20 B for foundation..
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc
Cement concrete in 1:2:4 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Provision for Bitumen Pad
Construction of Culvert
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary as per SS 20 B for foundation..
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc
Cement concrete in 1:3:6 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement concrete in 1:1.5:3 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plastering with Cement Mortar 1:4 20mm thick mixed including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Construction of Retaining wall
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary as per SS 20 B for foundation..
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for etc
Cement concrete in 1:3:6 mix using 20 mm metal used including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plastering with Cement Mortar 1:5 20mm thick mixed including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Provision for Name board
PALANIAPPAN AND CO (BID ID -1413630)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .