Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹21,800
Closing Date
25 Jun 2026, 10:00 am
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
Providng and Laying Prime coat ,tack,along with 25mm thick bituminous concrete in Km 0/00 to 0/605).(Under SCA Head). (Balance Work
2026_PWD_136617_6
SD-I-CTR-Tender-26- 9850 dated 12-06-2026
Open Tender
Civil Works
30 days
Shimla
As per SBD
13 documents required · 13 mandatory
₹500
₹21,800
16 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 Kg/Sqm (Zero point Eighty five Kilogram) per Square meter. using mechanical means as per Techanical Specification Clause 502 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Square Metre | 85 | - |
| 2 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor @ 0.25 to 0.30 kg/Sqm ( zero pointy twenty five to zero point thirty kilogram per square meter) on the prepared granular surface and cleaned with Hydraulic broom as per M.O.R.D 2014 technical specifications clause 503. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.as per direction of Engineer-In-Charge | - | Per Square Metre | 36.29 | - |
| 3 | Providing and laying bituminous concrete 25 mm ( twenty five milimetre ) thick with 100-120 (one hunderd -one hundred twenty ) TPH batch type hot mix plant producing an average output of 75 ( seventy five ) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 ( five point four to five point six ) per cent of mix and filler, and filler with Zycotherm or equavalant 0.1% by weight of Bitumentransporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 (five hundred nine ) complete in all respect. including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | - | Per Cubic Metre | 18,372.42 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
SBD1088963.pdf
Tender Documents • 6.85 MB
BOQ_202210.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid