| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | ₹5.1 L | L1 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | vetrivel constructions L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing Plain Cement Concrete by manual / by using deploying machineries and clearing the site , including labour,lead,lift etc complete. | 4 | M3 | 1,000 ₹4,000 |
| 2.00 | Earth work excavating and depositing on bank with initial lead 10m & initial life of 2 m in Hard stiff clay, stiff black cotton, hard red earth, mixed with small size boulders HGS (SS.20B) a) Hard stiff clay, stiff black cotton hard red earth shales,muram,gravel earth and earth mixed with small size boulders and hand gravell soil | 11.6 | M3 | 200 ₹2,320 |
| 3.00 | b) In soft disintegrated rock not requiring blasting | 11.6 | M3 | 250 ₹2,900 |
| 4.00 | c) In medium rock and dense medium rock not requiring blasting | 5.8 | M3 | 350 ₹2,030 |
| 5.00 | Supplying and filling in foundation and basement with filling M-Sand in layers of not more than 10 cm thick well rammed, watered and compacted complete, as per standard specification | 2 | M3 | 1,900 ₹3,800 |
| 6.00 | Refilling with excavated earth wherever required including labour for filling, watering and consolidating with all lead, lift, etc, as per standard specification. | 22 | M3 | 100 ₹2,200 |
| 7.00 | Laying plain cement concrete M7.5 (1:4:8) mix using 220kg minimum cement content and using 40mm HBG (machine broken) for foundation and basement leveling course including cost of all materials, lead, lift and labour complete as per std.specification. | 15.5 | M3 | 6,000 ₹93,000 |
| 8.00 | Laying PCC in M20 (1:1.5:3)design mix using 12mm to 20mm down graded metal for various types of work for LV Plinth, Transformer basement at any level., etc., including chipping the piles up to cut off level, complete. | 11.5 | M3 | 7,000 ₹80,500 |
| 9.00 | Laying RCC in M15 (1:2:4)design mix using 12mm to 20mm down graded metal for various types of work for grade beam, column, footing at any level., etc., including chipping the piles up to cut off level, complete. (excluding reinforcement) a) R.C.C.Foundation First Footing | 1.5 | M3 | 15,000 ₹22,500 |
| 10.00 | b) R.C.C. Foundation Second footing | 0.6 | M3 | 17,000 ₹10,200 |
Tender Value
₹59.6 L
EMD Value
₹6,000
Closing Date
21 Feb 2026, 2:00 pmClosed
SE/Namakkal EDC
Supa towers,T,gode Road,Namakkal
Construction of New Fire Protection Wall, New LV Plinth and New PCC Road at Rasipuram 110 / 22 KV SS
2026_EB_652961_1
Spe.No.12/25-26,dt.06.02.26
Open Tender
Civil Works
Namakkal
Kindly See the Tender Documents
2 documents required · 2 mandatory
₹0
₹6,000
3 Mar 2026
7 Feb 2026
23 Feb 2026
7 Feb 2026
21 Feb 2026
7 Feb 2026
Dismantling the existing Plain Cement Concrete by manual / by using deploying machineries and clearing the site , including labour,lead,lift etc complete.
Earth work excavating and depositing on bank with initial lead 10m & initial life of 2 m in Hard stiff clay, stiff black cotton, hard red earth, mixed with small size boulders HGS (SS.20B) a) Hard stiff clay, stiff black cotton hard red earth shales,muram,gravel earth and earth mixed with small size boulders and hand gravell soil
b) In soft disintegrated rock not requiring blasting
c) In medium rock and dense medium rock not requiring blasting
Supplying and filling in foundation and basement with filling M-Sand in layers of not more than 10 cm thick well rammed, watered and compacted complete, as per standard specification
Refilling with excavated earth wherever required including labour for filling, watering and consolidating with all lead, lift, etc, as per standard specification.
Laying plain cement concrete M7.5 (1:4:8) mix using 220kg minimum cement content and using 40mm HBG (machine broken) for foundation and basement leveling course including cost of all materials, lead, lift and labour complete as per std.specification.
Laying PCC in M20 (1:1.5:3)design mix using 12mm to 20mm down graded metal for various types of work for LV Plinth, Transformer basement at any level., etc., including chipping the piles up to cut off level, complete.
Laying RCC in M15 (1:2:4)design mix using 12mm to 20mm down graded metal for various types of work for grade beam, column, footing at any level., etc., including chipping the piles up to cut off level, complete. (excluding reinforcement) a) R.C.C.Foundation First Footing
b) R.C.C. Foundation Second footing
c) R.C.C. Column
d) R.C.C. Beam
Supply, fabrication and placing in position of MS / RTS / TMT grills for reinforced cement concrete works including cost of steel, binding wire, labour, lead, lift, etc., complete.
Supplying and laying of interloking bricks size of 0.28x0.13x0.15 at all levels including cost of all required materials, bonding, transporting, labour, lead, lift,etc., complete as per std. specification.
Plastering with wall finishes with cm 1:5, 12mm thick with water proof compound 1kg per bag of cement as directed by the engineer including cost of all materials,labour,lead,lift etc.complete for Inner and outside of the building.
Colour washing two coats with best quality of white cement with suitable colour,pigments as directed by the engineer including cost of all materials,labour,lead,lift etc.complete for Inner and outside of the building.
Supplying and filling gravel and consolidating in 300mm thick layers, well rammed with all leads and lifts, watering, as per standard specification, etc., complete as per standard specification and as per direction of the Engineer incharge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_782960.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid