Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.5 LAccepted-AOC HASTINAPUR H NO 12 GUWAHATI P O DISPUR P S DISPUR KAMRUP M | ₹63.5 L | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹63.6 LRejected-AOC | ₹63.6 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | KESHAB GOGOI L2 | PRIYANKA TAMULI L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprootingwild vegetation, grass,
bushes,shrubs,saplings and trees of girth upto 300mm, removal of stumps of
such trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material tobe used or auctioned, up to a lead of 1000 m including
removal and disposal of top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201.
In area of non thorny jungle | 0.26 | Sqm | 52,995.08 ₹13,672.73 | 52,961.14 ₹13,663.97 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 1,140.09 | cum | 258.2 ₹2.9 L | 258.2 ₹2.9 L |
| 3.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 1,049.74 | cum | 339.68 ₹3.6 L | 339.68 ₹3.6 L |
| 4.00 | By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 243.56 | cum | 2,834.34 ₹6.9 L | 2,834.34 ₹6.9 L |
| 5.00 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) WBM Gr. III | 429.28 | cum | 4,537.49 ₹19.5 L | 4,537.49 ₹19.5 L |
| 6.00 | Providing and laying Interlocking Concrete Block Pavement (ICBP) conforming to IS:15658-2006 including all lead and lift complete as per technical specification and as directed.
80mm thick interlocking precast blocks having compressive strength of 40N/sq.mm. | 1,623.75 | Sqm | 1,161.08 ₹18.9 L | 1,161.08 ₹18.9 L |
| 7.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 120.96 | Cum | 127.69 ₹15,445.38 | 127.69 ₹15,445.38 |
| 8.00 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 | 120.96 | Cum | 67.8 ₹8,201.09 | 67.8 ₹8,201.09 |
| 9.00 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Ordinary soil
Manual meands | 34.56 | Cum | 2,596.06 ₹89,719.83 | 2,596.06 ₹89,719.83 |
| 10.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203'(I)PCC Grade M10
Height upto 5m | 17.28 | Cum | 6,036.57 ₹1.0 L | 6,036.57 ₹1.0 L |
Tender Value
₹63.5 L
EMD Value
₹1.3 L
Closing Date
18 Aug 2025, 2:00 pmClosed
CE (Roads), PWRD, Assam, Chandmari, Ghy-3
O/O The CE (Roads), PWRD, Assam, Chandmari, Ghy-3
STBR/SOPD-G/Jalukbari-27/66 Construction of Munia Mikir Road under SOPD-G for the year 2025-26
2025_PWD_45820_50
CE/STBR/SOPD-G/NIT/07/2025 26/1 Dated 26-06-2025
Open Tender
Civil Works – Roads
180 days
Jalukbari
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,271
₹1.3 L
Yes
O/O The CE (Roads), PWRD, Assam, Chandmari, Ghy-3
17 Mar 2026
23 Jul 2025
19 Aug 2025
23 Jul 2025
18 Aug 2025
23 Jul 2025
23 Jul 2025 - 8 Aug 2025
30 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid