Loading…
Loading…
Tender Value
₹62.2 L
EMD Value
₹1.2 L
Closing Date
22 Jul 2026, 4:00 pm
Executive Engineer Construction Division kashmir
Construction of Sports Facility at Kalaroos, Kupwara
Construction of Sports Facility at Kalaroos, Kupwara
2026_SPORT_314311_5
08 of 2026-27
Open Tender
Civil Works
90 days
srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
EX ENGINEER CDK
₹1.2 L
2 Jul 2026
2 Jul 2026
23 Jul 2026
2 Jul 2026
22 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shopian
Basketball Court Synthetic
Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead. | 600 | Sqm | 91.75 | ₹55,050 |
| 2 | P/L stone soling hand packed incl ramming with heavy rammers all carriage upto site of work | 60 | Cum | 1,000 | ₹60,000 |
| 3 | P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level
(1;4;8) stone aggregate 40 mm nominal size crushed aggregate . | 45 | Cum | 5,202.9 | ₹2,34,130.5 |
| 4 | P/L in position cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level (1:2:4) stone aggregate 20mm nominal size aggregate | 90 | Cum | 7,104.35 | ₹6,39,391.5 |
| 5 | Reinforcement for RCC work incl. straightening, cutting, placing in position and binding all complete Fe.500 Grade (Comforming to IS:1786-1985) upto floor 5 level complete job incl. all carriages. | 4,050 | Kgs | 123.2 | ₹4,98,960 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 15 | sqm | 286.35 | ₹4,295.25 |
| 7 | Supply, installation, Curbing and marking of FIBA approved synthetic modular suspended interlocking Sports Flooring (Tile) with
specifications as size (340.8mmx304.8mmx15.8mm) :- weight not less than 370gm/Sft, thickness not less than 1.50 cm, UV resistant antiskid surface made of Polypropylene (PP), double layered structure / Mesh with side locks, minimum temperature bearing capacity -40°C to 70°C, stay for 24 hours, Ball rebound performance ≥ 90%, slip resistance 80s-110, vertical deformation :1.5mm-5mm & the Product shall be listed on official FIBA website. The product should be Modular Flooring with application
of game lines and transition materials. The items should be inclusive of drainage, adjustment of poles, curbing of edges / corners etc. complete marking of game line with game line paint as per FIBA inclusive of all leads, lifts, GST and carriages etc. complete in all respects”. | 5,292 | Sft | 320 | ₹16,93,440 |
| 8 | Supply of basketball post set of standard quality and approved make Cosco, Koxxton, Lifetime or equivalent made of heavy duty tube structure with spring loaded system for height adjustment at different levels along with 20mm acrylic board dunking rings and padding for the safety of players, provided with wheels for smooth shifting and levelers to adjust height on uneven surfaces complete incl. all taxes(GST), royalties etc with loading/unloading assembling erecting and adjusting at site and all leads lifts and carriages complete. | 2 | Nos. | 1,36,372 | ₹2,72,744 |
| 9 | Carriageof material by MT from source to site of work
A) (Sand and aggregate upto 25 Km by mt) | 60.75 | Cum | 465.14 | ₹28,257.25 |
| 10 | B) (stone aggregate upto 15 km by MT) | 40.5 | Cum | 344.49 | ₹13,951.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1017829.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid