Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹1.8 L Comprehensive Maintenance of Sewage Treatment Plant 200 KLD Capacity with MBBR/FBBR system during 2022-2024 for New IMU campus (HQ) at Uthandi (SH: Comprehensive Running and maintenance of sewage treatment plant 200 KLD Capacity with MBBR/FBBR system for New IMU Campus (HQ) at Uthandi for 2 months) | Comprehensive Maintenance of Sewage Treatment Plant 200 KLD Capacity with MBBR/FBBR system during 2022-2024 for New IMU campus (HQ) at Uthandi (SH: Comprehensive Running and maintenance of sewage treatment plant 200 KLD Capacity with MBBR/FBBR system for New IMU Campus (HQ) at Uthandi for 2 months) | L1 | |
| 2 | - | - |
| Sl No | Description | Qty | Unit | ENVIROCHEM ENGINEERS AND CONSULTANTS INDIA PVT LTD L1 |
|---|---|---|---|---|
| - | Comprehensive Running and maintenance of sewage treatment two lakh litres capacity (Extended aeration/activated sludge process) for 24.00 hrs per day by engaging qualified plant operator in 3 shifts (each 8 hours per day) using chemicals like Sodium hypocholorite, Bioculture,Consumables required for maintenance as directed by the Engineer-in-Charge.The treated sewage shall have the following standards: BOD : Lessthan20mg/lit COD :Lessthan100mg/lit Suspended Solids :Lessthan100mg/lit PH : 6.50-7.50 The treated effluent shall be within BIS limits and shall be reused for horticultural purposes/flushing water or recharged to ground water after treatment and chlorination. Frequency of testing shall be at an equal intervals of 2 months.(The quoted rate is inclusive of electrical and mechanical repairs, cost of all materials including spare parts, replacement, winding etc., to sewage pumps, motors, airetors, panel board, cable, replacement of filter media etc. )Frequency of testing shall be at an equal intervals of 2 months. (The quoted rate is inculsive of eletrical and mechanical repairs, cost of all materials inculding spare parts, replacement, winding etc., to sewage pumps, motors, airetors, panel board, cable, replacement of filter media etc.) | 2 | per month | 90,240 ₹1,80,480 Lowest |
Tender Value
₹2.0 L
EMD Value
₹4,100
Closing Date
1 Nov 2024, 3:00 pmClosed
AE-C-4
GUGANATHAN MANIKANDAN
IMU-HQ
Comprehensive Maintenance of Sewage Treatment Plant 200 KLD Capacity with MBBR/FBBR system during 2022-2024 for New IMU campus (HQ) at Uthandi (SH: Comprehensive Running and maintenance of sewage treatment plant 200 KLD Capacity with MBBR/FBBR system for New IMU Campus (HQ) at Uthandi for 2 months)
92705
59/AE-4/II/C2D/2024-25/Chennai
OPEN
Civil Works - Others
NCB
2 months
Chennai, Tamil Nadu
8 documents required · 8 mandatory
₹4,100
Not Applicable
1 Nov 2024
24 Oct 2024
1 Nov 2024
1 Nov 2024
31 Oct 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+DOCUMENT+59.pdf
document • 1.68 MB
DG%2BCON%2Bupto%2B03062024%2BConstruction%2Bworks+%281%29.pdf
document • 14.96 MB
GCCConstruction2023.pdf
document • 23.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .