| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹49.1 L+₹1.4 L (2.87%)Rejected-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | L2 | Rejected-AOC L2 |
Tender Value
₹47.8 L
EMD Value
₹49,000
Closing Date
12 Jul 2024, 3:00 pmClosed
Project Director DRDA Perambalur
Project Director DRDA Perambalur
MGSMT 2024-2025 Upgradation of the Road From Esanai EB Sub Station Road Km 0 0 - 1 0 Perambalur Block Perambalur District Package No TN 11 04
2024_RDTN_459771_1
DIPR/2074/TENDER/2024
Open Tender
Civil Works
Item Rate
180 days
DRDA Perambalur
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹49,000
DRDA Perambalur
11 Sept 2024
3 Jul 2024
12 Jul 2024
4 Jul 2024
12 Jul 2024
4 Jul 2024
5 Jul 2024
Amount
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.., KM 0/000 - 1/000
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10 metre and lift of 2 metre including all labour charges and incidental charges such as shoring, strutting, providing coffer dams,bailing out of water KM 0/000 - 1/000
Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers KM 0/000 - 1/000.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete KM 0/000 - 1/000
Providing and laying PRIME COAT using slow setting emulsion bitumen Grade I at the rate of 7kg/10sqm over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/000
Providing and laying TACK COAT over WMM surface (treated with primer) using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., KM 0/000 - 1/000
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/000 - 1/000
Provision for HM Stone charges etc complete
Provision for KM Stone charges etc complete
Road Marking with Hot Applied thermoplastic compound with reflectorising Glass beeds on bituminous surface providing and laying of hot applied thermoplastic compound 2.5mm thick including reflecctorising Glass beeds at 250gms per sqm area ,thickness of 2.50mm is exclusive of surface applied glass beeds as per IRC 35 . The finished surface to level uniform and free from streeks and holes extra complete as per MORTH specification no 803.KM 0/0-1/000
Construction of 1.50M RCC slab Culvert @ Ch 10m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Superstructure
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Bed Block
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
Above Sill level
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck Slab
Providing and fixing Tar Paper for bearing between Bed Block and Deck slab
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
Filling the Well gravel including cost and conveyance of materials to worksote etc complete.
Construction of 1.50M RCC slab Culvert @ Ch 525m Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
Plain cement concrete in 1:3:6 using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Superstructure
Plain cement concrete in 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.Bed Block
Providing plain reinforced concrete in mix 1:11/2:3 using 20mm HBG metal including cost conveyance of all labnour charges etc completed
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges,etc., complete Below Sill level
Above Sill level
Suppling Fitting and palcing HYSD bar reinfourcement (Fe 415) in super structure complete as per drawing and technical specification as per clause 1002,1010 and 1202 for MORD
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck Slab
Providing and fixing Tar Paper for bearing between Bed Block and Deck slab
Provision PVC pipes 110mm 4KG for WEEP holes etc., Complete
Filling the Well gravel including cost and conveyance of materials to worksote etc complete.
Provision for Name Board Cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R SELVARAJ (BID ID -1080163)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .