Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-AOC | ₹23.6 L | L1 | Accepted-AOC - |
| 2 | L2₹24.9 LRejected-Finance | ₹24.9 L | L2 | Rejected-Finance - |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST Clearance certificate not submitted |
| Sl No | Description | Qty | Unit | Mangalaraj A L2 | ARUMUGAA BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00Construction of 60000 liter Capacity OHT Tank Keelavaippar Village and Panchayat | |||||
| 2.00Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer. | |||||
| 3.00 | First depth of 2m for column foundation | 118.58 | Cubic metre | 265 ₹31,423.70 | 263.5 ₹31,245.83 |
| 4.00 | Second depth of 2m for column foundation | 32.61 | Cubic metre | 280 ₹9,130.80 | 276 ₹9,000.36 |
| 5.00Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level. | |||||
| 6.00 | a) for column foundation | 8.89 | Square metre | 5,960 ₹52,984.40 | 5,951 ₹52,904.39 |
| 7.00Reinforced cement concrete M30 grade using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure) | |||||
| 8.00From G.L upto 4.50m depth | |||||
| 9.00 | (i) below 1.50m to 4.50m depth from G.L for Footing | 34.66 | Cubic metre | 9,860 ₹3.4 L | 9,859 ₹3.4 L |
| 10.00 | Below G.L upto 1.50m depth for column & G.L brace | 2.52 | Cubic metre | 9,780 ₹24,645.60 | 9,720 ₹24,494.40 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
9 Dec 2025, 3:00 pmClosed
Block Development Officer (BP), Vilathikulam
Block Developmet Office, Vilathikulam
Construction of 60000 liter Capacity OHT Tank Keelavaippar Village and Panchayat in Vilathikulam Panchayat Union of Thoothukudi District under PGF 2025-26
2025_RDTN_628333_1
Construction of 60000 liter Capacity OHT Tank Keelavaippar Village and Panchayat in Vilathikulam
Open Tender
Civil Works
Vilathikulam
Please refer Tender Doument
3 documents required · 3 mandatory
₹0
₹25,000
14 Mar 2026
3 Dec 2025
9 Dec 2025
3 Dec 2025
9 Dec 2025
3 Dec 2025
Construction of 60000 liter Capacity OHT Tank Keelavaippar Village and Panchayat
Earth work excavation and depositing on bank with initial lead 10m and lift of 2.0m in the following classification of soils, bailing out water wherever necessary including providing danger lights etc., and as directed as per specification SS 20B and special specification. in Hard rock Rock requiring blasting as per standard specifications and as directed by the Engineer.
First depth of 2m for column foundation
Second depth of 2m for column foundation
Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level.
a) for column foundation
Reinforced cement concrete M30 grade using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure)
From G.L upto 4.50m depth
(i) below 1.50m to 4.50m depth from G.L for Footing
Below G.L upto 1.50m depth for column & G.L brace
Above G.L upto 4.50m height for column & brace
Above 4.50m to 7.32m ht., from G.L for column & brace
Above 7.32m to 10.98m ht., from G.L for column & brace
Above 10.98m to 14.64m ht., from G.L for column
Above 10.98m to 14.64m ht., from G.L for Floorbeam , Floor slab , Side wall & Haunch
Above 14.64m ht., to 18.30m ht., for roof slab & side wall
Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood) joints of 10cm x 6.5cm spaced at about 90cm c/c and supported by Casurina props of 10cm to 13cm dia. at 75cm c/c complying with standard specification and as directed.
Plain Surface
Upto 3.30m ht., from G.L for Column footing, G.L brace peripheral & I set of Brace above GL
From 3.30m to 4.30m ht., for brace & roof slab bottom
From 5.30m to 6.30m ht., for brace
From 6.30m to 7.30m ht., for brace
From 8.30m ht., to 9.30m ht., for brace
From 9.30m ht., to 10.30m ht., for brace
From 11.30m to 12.30m ht. for floor beam & floor slab bottom (including 1.5m working space)
Centering for square column
upto 3.30m ht.
From 3.30m to 4.30m ht.,
From 4.30m to 5.30m ht.,
From 5.30m to 6.30m ht.,
From 6.30m to 7.30m ht.,
From 7.30m to 8.30m ht.,
From 8.30m ht to 9.30m ht
From 9.30m ht to 10.30m ht
From 10.30m ht to 11.30m ht
From 11.30m ht to 12.30m ht
Centering for curved surface
From 0 to 3.30m ht from floor level for side wall
From 3.3 to 4.30m ht from floor level for side wall & roof slab sides
From 11.30m to 12.30m ht for sides of floor slab
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer. The rate to include the cost of binding wire also.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Provision for MS Ladder and Hand rails for 60000 litres - 12m Staging Height Service Reservoirs (vide separate sheet)(89000+27000)
Refilling the excavated earth after laying and joining of pipes including all labour charges etc..complete
Supplying and fixing in position of 0.60 x 0.60m water tight CI manhole frame and cove of approved pattern at the roof slab and as directed. The manhole frame and cover should be of light duty and confirming to IS: 1726-1974 (33kg)
Provision for pipe connection arrangement for Inlet, Outlet, Scour and Overflow etc.,
65MM dia GI Tee
65MM dia GI 90 Bend
65MM dia GI Coupler
65MM dia GI Union
65MM dia GM Elbow
65MMx50MM dia GI Reducer
65MM dia GM Gate Valve
50MM dia GM Gate Valve
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_751261.xls
BOQ • 0.27 MB
TechnicalBid.pdf
Tender Documents • 0.64 MB
Download all tender documents and submit your bid