| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC | ₹29.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.2 LRejected-Finance | ₹30.2 L | L2 | Rejected-Finance L2 Not eligible for AOC |
| Sl No | Description | Qty | Unit | P.JAYAKUMAR L1 | G.JAYARAJ L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc. with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc. including all incidetal charges etc. complete as per standard specification. For foundations SS 20 B TNDSS No.23 & 24 V, VI (S2) VI 9 | 137.7 | m³ | 263 ₹36,215.10 | 270.89 ₹37,301.55 |
| 2.00 | Supply and delivery of filling of M-sand in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand to site and all labour charges and all other incidential charges etc. complete as per standard specification TNDSS No.24 & 25 NBC part VI (S2) 8 | 6 | m³ | 279 ₹1,674 | 287.37 ₹1,724.22 |
| 3.00 | Cement concrete of mix 1:4:8 (one cement four sand and eight aggregates) using 40 mm gauge machine broken granite stone jelly for foundation including de watering if found necessary and laid in layers of not more than 15 cm thick well rammed and consolidated etc complying with standard specification. TNDSS No.28 V, VI S25. | 6 | m³ | 5,516 ₹33,096 | 5,681.48 ₹34,088.88 |
| 4.00 | Reinforcement Cement concrete 1:1½:3 (one cement one and a half sand and three aggregates) using machine broken granite jelly of 20 mm size for all reinforced cement concrete works excluding cost of centering shuttering strutting and also cost of reinforcement grill in position but including laying vibrating with mechanical vibrators using finishing etc complete, as directed by the departmental officers etc complete complying with standard specification. TNDSS No.28 V, VI S25. | 33.5 | m³ | - | - |
| 5.00 | For Items 1.5 m to 4.5 m below GL | 33.5 | m³ | 8,290 ₹2.8 L | 8,538.7 ₹2.9 L |
| 6.00 | Items to 0 to 1.5 m below GL | 6 | m³ | 8,152 ₹48,912 | 8,396.56 ₹50,379.36 |
| 7.00 | For items 0 to 4.5 m above GL | 8 | m³ | 8,293 ₹66,344 | 8,541.79 ₹68,334.32 |
| 8.00 | Above 4.5 m and up to 7.3 from GL | 3 | m³ | 8,571 ₹25,713 | 8,828.13 ₹26,484.39 |
| 9.00 | For items below 7.32 m and up to 10.98 m from GL | 8 | m³ | 8,848 ₹70,784 | 9,113.44 ₹72,907.52 |
| 10.00 | Columns from 10.98 m to 14.64 m above GL | 21 | m³ | 9,126 ₹1.9 L | 9,399.78 ₹2.0 L |
Tender Value
₹35 L
EMD Value
₹35,000
Closing Date
7 Jan 2026, 3:00 pmClosed
Executive Officer
Kaliyakkavilai Town Panchayat
Construction of 100000 litre capacirty OHT at Meycode area near Mannarippu Anganwadi in Kaliyakkavilai Town Panchayat
2025_DTP_638058_1
642/2024/A1
Open Tender
Civil Works - Water Works
90 days
Kaliyakkavilai Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,000
Yes
8 Feb 2026
31 Dec 2025
7 Jan 2026
31 Dec 2025
7 Jan 2026
31 Dec 2025
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc. with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc. including all incidetal charges etc. complete as per standard specification. For foundations SS 20 B TNDSS No.23 & 24 V, VI (S2) VI 9
Supply and delivery of filling of M-sand in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand to site and all labour charges and all other incidential charges etc. complete as per standard specification TNDSS No.24 & 25 NBC part VI (S2) 8
Cement concrete of mix 1:4:8 (one cement four sand and eight aggregates) using 40 mm gauge machine broken granite stone jelly for foundation including de watering if found necessary and laid in layers of not more than 15 cm thick well rammed and consolidated etc complying with standard specification. TNDSS No.28 V, VI S25.
Reinforcement Cement concrete 1:1½:3 (one cement one and a half sand and three aggregates) using machine broken granite jelly of 20 mm size for all reinforced cement concrete works excluding cost of centering shuttering strutting and also cost of reinforcement grill in position but including laying vibrating with mechanical vibrators using finishing etc complete, as directed by the departmental officers etc complete complying with standard specification. TNDSS No.28 V, VI S25.
For Items 1.5 m to 4.5 m below GL
Items to 0 to 1.5 m below GL
For items 0 to 4.5 m above GL
Above 4.5 m and up to 7.3 from GL
For items below 7.32 m and up to 10.98 m from GL
Columns from 10.98 m to 14.64 m above GL
From items 14.64 m and up to 18.30 m from GL
Supplying and erecting of steel centering for sides & soffits including necessary supports & strutting up to 3.29 m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60 cm & 10 guage sttiffened, welded with steel angle of size 25 x 25 x 3 mm for boarding laid over silver oak joists (country wood) of size 10 x 6.5 cm spaced 23,00,000/- about 90 cm c/c and supported by casurina props of 10 13 cm dia, spaced 23,00,000/- 75 cm c/c etc. complete complying with standard specifications and as directed by the departmental officers. Rate for 10 m2. for the following items (RCC floor slab, roof slab, rectangular / square, tee / EII beams, lintels, staircase waist slabs, landling slabs, landing beam, portico beam etc.) TNDSS No.86 K, 86A.
PLAIN SURFACE
Below ground level items
CURVED SURFACE
Below GL items
SQUARE COLUMN
Below GL
CIRCULAR COLUMN
Below GL
3.31 to 4.30 m central column
4.31 to 5.30 m central column
5.31 to 6.30 m central column
6.31 to m 7.30 m central column
7.31 to 8.30 m central column
8.31 to 9.30 m central column
9.31 to 10.30 m central column
10.31 to 11.30 m central column
11.31 to 12.30 m central column
Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or ribbed tar steel rods, for all RCC works as per the design given by the departmental officers including cost of steel cutting, bending, placing in position and binding with binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete. TNDSS No.SS 86 & 86A V,VI, VII (S6) 7,3
Painting two coats with ready mixed plastic emulsion paints of first class quality and of approved colour over a priming coat including through scraping clean removal of dirt etc, complete and including cost of necessary plaster of paris, putty, brushes, wherever required and all labour charges, scaffolding charges etc., complete as per standard specification.
Providing and fixing of RCC inner access ladder in RCC 1:1½:3 (one cement, one and half sand and three aggregate) using 20 mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc. to required height and clear width of 45 cm consisting of two Nos. of vertical post of 10 x 15 cm and step slab of 25 x 25 mm etc complete.
Providing PVC ventilating mosquito proof nylon net with 110 mm PVC cowl and all directed by departmental engineers
Providing manhole cover of size 0.60 x 0.60 m in RCC 1:1.5:3 with suitable reinforcement and 50 x 50 x 6 mm M.S angle fixed along edges and as directed by departmental officers.
Refilling the basement with excavated earth in layers of not more than 15 cm thick well rammed watered and consolidated etc. complete with standard specification.
Providing two legged scaffolding using 15 cm blue gun posts or casurina props or best quality bamboo posts at 4 metres over all length, the distance between two rows being 1.25 metre and spacing of posts 2 metres. in both the rows with two horizontal posts with 0.5 metres over lap on either side and braces at 2 m c/c including longitudinal and traverse middle braces to step up as providing a platform with country wood planks of 40 mm thick and 1 Mt. width etc. in complete around the OHT of total height 10.50 metre.
Construction of RCC spiral staircase in RCC 1:1½:3 20 mm HBGS of 1.80 m Ø of required height for approach to the roof of SR with RCC hand rails as per type design including necessary earth work for providing foundation in CC 1:4:8 mix RCC footing 1:1½:3 mix, GL platform etc. including cost of steel reinforcement, fabrication charges, scaffolding charges, centering, precasting charges, cement painting etc complete. The staircase should be braced to the column of service reservoir at suitable interval etc complete.
Supply and fixing of RCC hand rail of height 0.90 m supporting with RCC support column including casing of hand rail fixing in position at the top of the roof slab of OHT including cost of all materials and all labour charges etc complete.
Supplying and delivery of following PVC / GI pipes and specials
90 mm PVC pipe
80 mm GI pipe
Earth work excavation and depositing on bank with initial lead of 2 metre narrow trenches for laying of pipes and refilling earth for water supply works in the hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil as directed by the departmental officers.
Labour charges for laying of PVC/GI pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plum bind for providing water supply works.
90 mm PVC pipe
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Bid.pdf
Tender Documents • 0.28 MB
BOQ_763656.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid