Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.4 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M SATHIYANANTHAM L4 | M/S SAI RAM ENTERPRISES L2 | Gangan Elumalai L3 | BEEMJI ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|
| 1.00Vellore District Construction of Drainage at Priya Nagar in Venkatapuram Panchayat Vellore Block 15 CFC (BP) 2025-2026 Package No 01 | |||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 83.29 | cum | 365 ₹30,400.85 | 300 ₹24,987 | 253.23 ₹21,091.53 | 130 ₹10,827.7 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 15.42 | cum | 5,379.5 ₹82,951.89 | 5,500 ₹84,810 | 5,158.63 ₹79,546.07 Lowest | 6,100 ₹94,062 |
| 4.00 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 305.1 | cum | 548 ₹1,67,194.8 | 300 ₹91,530 Lowest | 525.6 ₹1,60,360.56 | 350 ₹1,06,785 |
| 5.00 | cement concrete 1: 3 : 6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 35.09 | cum | 6,160.73 ₹2,16,180.02 | 7,500 ₹2,63,175 | 5,914.3 ₹2,07,532.79 Lowest | 6,500 ₹2,28,085 |
| 6.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all etc.. Complete | 76.28 | cum | 590.61 ₹45,051.73 | 300 ₹22,884 Lowest | 566.99 ₹43,250 | 450 ₹34,326 |
| 7.00 | Name Board | 1 | No | 300 ₹300 | 1,000 ₹1,000 | 288 ₹288 Lowest | 1,000 ₹1,000 |
| 8.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 97,574.27 ₹97,574.27 | 87,909.48 ₹87,909.48 | 92,172.41 ₹92,172.41 | 85,515.43 ₹85,515.43 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,700
Closing Date
21 Jul 2026, 3:00 pmClosed
The Block Development Officer Vellore
The Block Development Officer Vellore
Vellore District Construction of Drainage at Priya Nagar in Venkatapuram Panchayat Vellore Block 15 CFC (BP) 2025-2026 Package No 01
2026_RDTN_683533_1
A2/696/2025
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office Vellore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,700
21 Jul 2026
2 Jul 2026
21 Jul 2026
2 Jul 2026
21 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Vellore District Construction of Drainage at Priya Nagar in Venkatapuram Panchayat Vellore Block 15 CFC (BP) 2025-2026 Package No 01 | - | - | - | - |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 83.29 | cum | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 15.42 | cum | - | - |
| 4 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 305.1 | cum | - | - |
| 5 | cement concrete 1: 3 : 6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 35.09 | cum | - | - |
| 6 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all etc.. Complete | 76.28 | cum | - | - |
| 7 | Name Board | 1 | No | - | - |
| 8 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | - | - |
stage.html
html • 0.02 MB
finance_821658.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_821658.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].