Tender Value
₹312.1 Cr
EMD Value
₹1.6 Cr
Closing Date
10 Aug 2026, 6:55 pmDue tomorrow
Executive Engineer, PWD Division No.1, Nagpur.
Executive Engineer, PWD Division No.1, Nagpur.
CONSTRUCTION OF BOYS HOSTEL, GIRLS HOSTEL, DINING HALL BUILDING AND LIBRARY BUILDING AT MAHARASHTRA NATIONAL LAW UNIVERSITY NAGPUR, WARANGA, NAGPUR (INCLUDING ELECTRIFICATION WORK)
2026_PWR_1319712_1
pwc/ngp/div1/12-1-OPEN/2026-27
Open Tender
Civil Works
Item Wise
730 days
AT NAGPUR.
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
via Net Banking
₹1.6 Cr
MNLU CAMPUS AND C.E. OFFICE PWD,NAGPUR.
21 Jul 2026
21 Jul 2026
12 Aug 2026
21 Jul 2026
10 Aug 2026
21 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1L | |||||
| 1.1 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 0.8 | One Square Metre | 100 | ₹79.9 |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | One Cubic Metre | 100 | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m) By Manual Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 1 | One Cubic Metre | 100 | ₹99.9 |
| 7 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5m To 3.0 m) By Mechanical Means | - | One Cubic Metre | 100 | - |
| 8 | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and back filling with available earth soil /murum watering, ramming etc. complete. (Lift upto 1.5m) By Mechanical Means | - | One Cubic Metre | 100 | - |
| 9 | Transportation of excavated material,Overburden, Rubish, Earth,etc,upto lead 1km to the location assigned by Engineer In charge and as directed by
engineer in charge. | 0.4 | One Cubic Metre | 100 | ₹39.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.02 MB
DRAWINGS.pdf
Other Document • 18.99 MB
BOQ_2261626.xls
BOQ • 1.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].