| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹58.0 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | 1 | Accepted-AOC Accepted as L1 bidder and awarded value is including GST. | |
| 2 | 2₹49.2 L+₹8,112 (0.17%)Rejected-Finance CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | 2 | Rejected-Finance After revised rate bidder ranked as L2 bidder. Hence rejected as L2 bidder. | |
| 3 | 3₹75.6 L+₹26.4 L (53.8%)Rejected-Finance | 3 | Rejected-Finance Rejected as L3 bidder. |
Tender Value
₹99.3 L
EMD Value
₹1.2 L
Closing Date
6 Sept 2024, 5:30 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
supporting of roof by mechanized drilling (by providing hydraulic roof bolter) 1.8m long hole in hard pebble ferrous roof with 27 mm drill bit for anchoring of 20-22 mm dia. roof bolts with resign capsule, fitting of bearing plates, W-Straps and tigh
2024_SECL_315553_1
SECL/JK/GM(O)/24-25/eT/20 Dt.21.08.2024
Open Tender
Civil Works - Others
Item Rate
365 days
Bhadra 7-8 UG Mine, Bhadra Sub-Area, Jamuna Kotma
As per NIT
4 documents required · 4 mandatory
₹1.2 L
26 Nov 2024
21 Aug 2024
7 Sept 2024
21 Aug 2024
6 Sept 2024
22 Aug 2024
22 Aug 2024 - 30 Aug 2024
Amount
Supporting of roof by mechanize drilling of 1.8m long hole drill in hard pebble-ferrous roof with 27mm drill bit for anchoring 20/22mm dia roof bolts with resign capsule and fitting of bearing plate and tightening of nuts at M.K. Seam Development panel of Bhadra 7and 8 Mine, Bhadra Sub Area, Jamuna Kotma Area. Bolts grouted should be complete with the test as per DGMS CIRCULAR. Junction support roof bolt grouting should be completed with W-strap. (1).Roof bolt rod, Bearing plate, Nut, resign capsule, electric power will be provided by department on free of cost. ( water source will be provided at panel and its supply up to machine will be the contractor responibility. (2).Transportation of roof bolts rod, W-strap, Bearing plates, nut, resign capsule, power cable, water hoses and shifting of power pack shall be done by contractor. (3).Power cable and water hoses from power pack to be drill machine shall be supplied by conractor drill nut and drill bit will be provided by the contractor. (4). Hydrraulic oil for power pack shall be supplied by contractor. (5). Hydraulic drill machine with power pack drill bits and other necessary parts/hoses etc. of the mechanised hydraulic drilling machine required there in will be done by contractor. (6). All maintanance and related shifting will be done by contractor. (7). All electricals installation like switch/control panel cable will be done by contractor. (8). Contractor will deploy workers as required under the provision of Mines Act 1952 and will be resposible to follow the provisions of CMR/CMPF/CMPS and other applicable laws and by laws. (9). Assistance in anchoring testing of 10% installation of roof bolt Anchoring machine will be provided by company and manpower will be done by contractor. (10). Contractor will install sufficient nos of hydraulic power pack machine in well maintaied condition so as to cater all the working laces he will also provide sufficient no of manpower in all the shifts for the purpose ( Estimated rate includes laber, machinery and material cost)
Total impact of GST for the purpose of CTC
Ram Awadh Singh
NAMO FOUNDATION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .