Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC NA | PALWAL | HARYANA | 121004 | L1 | Accepted-AOC Work Awarded in regular lottery system | |
| 2 | L1₹6.7 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 3 | L1₹6.7 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 4 | L1₹6.7 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 5 | L1₹6.7 LRejected-AOC | L1 | Rejected-AOC Rejected |
Tender Value
₹6.7 L
EMD Value
₹6,720
Closing Date
17 Jun 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, SONEPUR
Out Post Building at Subalaya_building
2026_CERWI_131209_1
Tender Online SNPR-02 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Sonepur
2 documents required · 2 mandatory
₹4,000
₹6,720
Yes
29 Aug 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
6 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uptooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposalof top organic soil not exceeding 150 mm in thickness. | 900 | sqm | 8.63 | ₹7,767 |
| 2 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Column Foundation,For Shed Column,SHED, AREA,Road cutt off side,End Cut off | 19.41 | cum | 282.88 | ₹5,490.7 |
| 3 | Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge.( Column Foundation,For Shed Column,SHED, AREA,Road cutt off side,End Cut off) | 8.72 | cum | 602.04 | ₹5,249.79 |
| 4 | Cement concrete (1:3:6) using 40mm HG metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge.( Column Foundation,For Shed Column,SHED, AREA,Road cutt off side,End Cut off) | 15.61 | cum | 6,123.32 | ₹95,585.03 |
| 5 | Providing C.C. (1:2:4) using 12mm size hard granite crusher broken chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer- in - Charge.( Column Foundation,For Shed Column,SHED, AREA,Road cutt off side,End Cut off) | 46.65 | cum | 7,663.28 | ₹3,57,492.01 |
| 6 | Dismantling and removing doors , windows and ventilators including removal of frames. | 4.2 | sqm | 465.14 | ₹1,953.59 |
| 7 | Providing , fitting & fixing Steel Angle Iron doors & windows frame with M.S grill manufactured from standard rolled steel angle section 50 mm X 50 mm X 6 mm cornered of the frame duly metered and electrically welded with fish tail hold fasts made out of M.S flats of size 200 | 252 | kg | 95 | ₹23,940 |
| 8 | Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance, taxes of all materials, all labour and T&P required for the work including the cost of primer all other materials aetc complete as per direction of the Engineer-in-Charge. | 12.6 | sqm | 263.98 | ₹3,326.15 |
| 9 | Supplying, fitting & fixing of MS angle Iron channels for raftors in roofs fixing in12 lProPer position including fabrication, drilling holes etc. with cost, conveyance, taxes of all materials and labour with T&P etc. complete as directed by the Engineer-in-charge.MS Sq. Bar 4" Size Column,MS Sq. Bar 2.5" Size Rafter,MS Sq. Bar 2.5" Size Purlin,Stair Case,Add for base plate support etc | 1,169.62 | kg | 95 | ₹1,11,113.9 |
| 10 | Straighteening cutting bending M.S. & T.S rod including cost conveyance of materials.(Quantity (Column base+ Above GL)) | 1.39 | qtl | 8,617.66 | ₹11,978.55 |
stage.html
html • 0.11 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.66 MB
Tendernotice_1.pdf
PDF • 3.10 MB
BOQ_594776.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .