Loading…
Loading…
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
24 Jul 2026, 2:00 pm
Construction of P.way stores shed at Vikarabad & Seram station.
99_W_SC_26_OT
99_W_SC_26_OT
Open
12 Months
Vikarabad, Telangana
₹0
₹9.0 L
2 Jul 2026
2 Jul 2026
10 Jul 2026
A-SCHEDULE-A(DSR-2023 GENERAL ITEMS) 15692037.65 Below/P
B-SCHEDULE-B (DSR -2023 CEMENT CONCRETE ITEMS) 9310136.96 Below/P
C-SCHEDULE-C (DSR-2023 REINFORCEMENT STEEL ITEMS) 7442890.28 Below/P
D-SCHEDULE-D (DSR-2023 STRUCTURAL STEEL ITEMS) 11884853.00 Below/P
E-SCHEDULE-E (DSR-2023 WATER SUPPLY PIPES & FITTINGS ITEMS) 204039.61 Below/P
Item Breakup - A-SCHEDULE-A(DSR-2023 GENERAL ITEMS)
Item Breakup - B-SCHEDULE-B (DSR -2023 CEMENT CONCRETE ITEMS)
Item Breakup - C-SCHEDULE-C (DSR-2023 REINFORCEMENT STEEL ITEMS)
Item Breakup - D-SCHEDULE-D (DSR-2023 STRUCTURAL STEEL ITEMS)
Item Breakup - E-SCHEDULE-E (DSR-2023 WATER SUPPLY PIPES & FITTINGS ITEMS)
Item Breakup - F-SCHEDULE-F (N.S ITEMS)
Designing and developing Detailed structural MT and working Drawings for Steel structures upto all heights such as Sheds, Stagings etc. , based on Railway's approved General Arrangement Drawing (GAD) and relevant IS codes & Specifications, duly designing all members, components, connections including foundation and submission of check prints duly getting proof-checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions/ corrections in drawings/ designs, further submission of original in transparent film paper and design calculations booklets getting final proof checked by Railway approved institutes and soft copy for Railways approval etc. including bill of quantities with contractor's technical expertise, instruments labour, tools, plants, consumables, stationery, transportation, taxes and repeatedly attending till final approval by Railways as per the special conditions if any, complete and as directed by Engineer in-charge. Note: 1) Only Weight of Structural Steel in 'M.Ton' is considered for calculation of Quantity. 2) The contractor should submit designs of proposed steel structure as per approved General Arrangement Drawing for all components e.g., foundations, frames, roofing and wall panels and all other components and foundation including bill of quantities and as per directions of Engineer -in-charge for verification and approval. 3) Soil Test for SBC, is to be done & report to be submitted by Contractor/Agency to determine the type of foundation and payment will be made separately under relevant item, if applicable.
Supplying and fixing of 2mm thick embossed Sqm poly-carbonate sheet of GE lexan or similar approved make, profiled to suit the Galvalume sheet in roof, fixing the poly- carbonate sheet and galvalume sheet by using hex head self-drilling and taping screws with EPDM metal washers at each corrugation with EPDM metal washers at each corrugation with ultra- violet resistance PVC caps and providing silicon sealant all- round the fixed poly-carbonate sheet to make it leak proof including all materials, labour, tools etc., as per specifications and as directed by the Engineer-in-charge.
Supplying, fixing and Installation over shed Numbers 12.00 of Maxxalr Roof Turbo Ventilator Fan 24" Inner 30" Outer Dia, Hindalco Make Blade 0.47 mm Thickness, Width- 85 mm, Length- 485 mm, Aluminium Turbo Ventilator Top & Ring SS 304, Width-Two Ring & Two Small Bearing, Turbo 'Jentllator Fan Top & Bottom Plate SS (304), Main Saliya 16 mm Thickness, Length-485, Installation Soiled Rlblt- 147 Nos Per Nos, Polycarbonate Base Plate 2 mm Thickness. (Wldth-1080, Length-1665 mm) BASE PROFILE SN-1000 with all contractor, labour, tools, plants, roes, all lead 11ft descent, etc., complete and as directed by Engineer In charge at site. Total 262878.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Mastertenderbooklet2ason26.03.2026.pdf
ATTACHMENT
Mastertenderbooklet1ason26.03.2026.pdf
ATTACHMENT
master building conditions
ATTACHMENT
STCablecondiditionsF.pdf
ATTACHMENT
Scopeofwork.pdf
ATTACHMENT
MasterDocumentforSpecialConditionsforcontractsforCivil-Buildingworks-Correctedon10.03.2026.pdf
ATTACHMENT
Download all tender documents and submit your bid