Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.5 L
EMD Value
₹9,540
Closing Date
23 Jan 2020, 6:00 pmClosed
XEN R AND B DIVISION UDHAMPUR
XEN R AND B DIVISION UDHAMPUR
BOQ
2020_PWDJK_90625_7
ENIT No. 91 of 2019-20 Dated 17-01-2020
Open Tender
Civil Works
Item Rate
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN R AND B DIVISION UDHAMPUR
₹9,540
Yes
25 Jan 2020
18 Jan 2020
24 Jan 2020
18 Jan 2020
23 Jan 2020
18 Jan 2020
Amount
Earth work in excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth , 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 mtr and lift upto 1.50 mtr, disposed earth to be levelled & neatly dressed (without breaking public/ private property) as per direction of Engineer In charge at site. All kinds of soil
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width & for shafts, wells, cesspits & the like not exceeding 10 sqm on plan, depth upto 1.5 m including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled & neatly dressed. All kinds of soil
Filling available excavated earth (excl. rock) in trenches , plinth , sides of foundations etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead up to 50 m & lift up to 1.5 m.
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) Nallah incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed with 30% plum. incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Providing & laying cement concrete in retaining walls, return walls, Walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto floor 5- level, excluding the cost of centering, shuttering & finishing. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed. incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Providing & laying cement concrete in retaining walls, return walls, Walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto floor 5- level, excluding the cost of centering, shuttering & finishing. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed with 30% boulders incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level. incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Reinforcement for RCC works incl. straightening, cutting, bending, placing in position & binding all complete Thermo machenical treated bars.
Centering & shuttering incl. strutting , propping etc. and removal of form work for :-
Foundations, footings, bases of columns etc.
Retaining walls, return walls, walls (any thickness) including attached plasters, buttresses, plinth and string courses etc.
Suspended floors , roofs, landings, balconies, & access platform.
Edges of slabs and breaks in floor and walls under 20 cm wide.
Providing and laying damp- proof course 40 mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size) crushed. incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
12 mm cement plaster of mix 1:6 (1 cement: 6 coarse sand). incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Dry Random Rubble masonry with hard stone in foundation & plinth using Nallah stone without bond stone incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Providing, laying, spreading, compacting of broken Nallah stone aggregate of size 63 to 45 mm for water bound macadam specifications including spreading in uniform thickness hand packing, rolling with 3 wheeled steel/ vibratory roller 8 to 10 tonne capacity in stages to proper grade and camber using good earth to fill up the interstics of coarse aggregate watering and compacting to the require denesity. incl all carriage lead, lift, loading/ unloading/ handling/ rehandling Complete
Providing and laying non-pressure NP3 class ( Heavy duty) 1000 mm dia RCC H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete ( Recovery rate of 8'-0" length pipe with collars @ Rs.10000+ Taxes each) if supplied by the department.
M/S Friends Group of Constructions
M/S MATHUR CONSTRUCTION
Shiva Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .