| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.5 Cr+₹6.7 L (1.52%)Rejected-AOC DADRA AND NAGER HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | ₹4.5 Cr+₹6.7 L (1.52%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.5 Cr+₹12.8 L (2.90%)Rejected-AOC DADRA AND NAGAR HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | ₹4.5 Cr+₹12.8 L (2.90%) | L3 | Rejected-AOC L3 |
| 4 | L4₹5.4 Cr+₹96.0 L (21.7%)Rejected-AOC DADRA AND NAGER HAVELI DN | ₹5.4 Cr+₹96.0 L (21.7%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
25 Apr 2022, 5:00 pmClosed
Deputy Conservator of Forest(T),DNH,Silvassa
Deputy Conservator of Forest(T),DNH,Silvassa
Construction of Check dams in Forest and Wildlife Area (T and WL) Forest Department, U.T. of DNH,(6 Nos) (at Besda, Vasda, Bedpa Mulgam, Rudana Maragpada, Luhari, Sindoni Sidnipada)2nd Call.
2022_UTDNH_5859_1
E Tender Notice No 01OF 2022-23 (T)
Open Tender
Agricultural or Forestry
Item Rate
180 days
UT OF DNH
As per NIT refer
3 documents required · 3 mandatory
₹2,000
Deputy Conservator of Forest(T),DNH,Silvassa
₹9.0 L
20 May 2022
4 Apr 2022
26 Apr 2022
4 Apr 2022
25 Apr 2022
4 Apr 2022
Amount
Excavation of canal/drain in hard murrum including depositing the excavated stuff in uniform layers in canal banks or in spoil banks or as and where directed including dressing the canal section upto lead of 50 meter and lift shown below including clearing the site dewatering etc complete ( manual operation with dewatering) (a) Up to 1.50m depth
Excavation of canal/drains in hard rock including blasting, depositing the excavated stuff in uniform layers in canal banks or in spoil banks or as and where directed including dressing the canal section upto lead 50 meter and lift shown below etc. complete including clearing the site dewatering etc complete (manual operation with dewatering) (a) Up to 1.50m depth
Providing material and labour for Drilling holes of 35mm dia vertical or inclined in all formations of rock/cement up toi required depth including washing with air & water at required pressure for following stage of depth (A) from 0.0 m to 10.00m depth.
Providing material and labour for Pressure Grouting to the foundation strata at suitable distance at a approved pressure of 7.50 Kg/One Sq.Mt. including dewatering and testing etc. complete.
Providing material and labour for Pressure(Injection) grouting to structures with cement slurry by including providing PVC nipple size of 15cm long 1/2" at 30 cm C/C distance at maximum pressure of 7.50 kg/Sq.cm including providing necessary scaffolding and materials etc complete.
Providing material and labour for laying Reinforced cement concrete of cement, sand and metal (20mm to 25mm size) in 1:1.5:3 proportion laid in situ including centering, shuttering, temping, smooth finishing, curring etc. complete as directed for all leads and lifts (including vibrating) as directed etc. & Curing complete.
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering.
Providing material and labour for laying in position FE 500/500D TMT bar reinforcement including cutting, bending, hooking and tying complete as per detailed for the following. (A) Abutment cap & Dirt wall. (B) Pier Cap as directed etc. complete.
Clearing the canal land width including removing the shrub, bushes, cactus, weed other vegetation including xutting down trees upot 0.50cm girth and depositing the removed materials outside the canal land width up to to lead of 50 meter as directed etc. (Without water pool) complete as directed.
Providing material and labour for 230mm thick Pucca Rubble pitching in cement mortar 1:5 proportion with the surface pointed with cement mortar of 1:3 proportion including etc. complete for all leads & lifts.
Providing material and labour for Providing Cement Plaster mortar 1:3 proportion including smooth finishing, curing scaffolding etc. complete for all leads and lifts, in various thickness as under. (12mm thicknees).
Ekta Construction
M/S Jai Shri New Chamunda Construction Co
M/S. V.S.KOTADIA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .