Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.8 L+₹98,372.94 (14.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RANGANATHAN L2 | G. JAYACHANDRAN L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Construction of Mini Community Sanitary Complex for Boys Toilet Type -6 (GHSS ) in Solavaram at Solavaram Panchayat at Kaniyambadi Block SBM(G) 2026 -2027 Package no 01 | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 25.86 | cum | 268.42 ₹6,941.34 | 234.76 ₹6,070.89 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4.54 | cum | 1,917.74 ₹8,706.54 | 1,677.27 ₹7,614.81 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 5.62 | cum | 5,647.5 ₹31,738.95 | 4,939.34 ₹27,759.09 Lowest |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 6.5 | cum | 285.27 ₹1,854.26 | 249.5 ₹1,621.75 Lowest |
| 6.00 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 27.81 | sqm | 557.14 ₹15,494.06 | 487.28 ₹13,551.26 Lowest |
| 7.00 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 40.16 | sqm | 1,114.27 ₹44,749.08 | 974.55 ₹39,137.93 Lowest |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.63 | MT | 93,511.16 ₹58,912.03 | 81,785.51 ₹51,524.87 Lowest |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm | 8.79 | cum | 9,444.37 ₹83,016.01 | 8,260.11 ₹72,606.37 Lowest |
| 10.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 17.56 | cum | 6,232.85 ₹1,09,448.85 | 5,451.29 ₹95,724.65 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,780
Closing Date
23 Sept 2026, 3:00 pmClosed
The Block Developement Officer,Kaniyambadi
The Block Developement Office,Kaniyambadi
Vellore District Construction of Mini Community Sanitary Complex for Boys Toilet Type -6 (GHSS ) in Solavaram at Solavaram Panchayat at Kaniyambadi Block SBM(G) 2026 -2027 Package no 01
2026_RDTN_701663_1
B5/1388/2026
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office, Kaniyambadi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7,780
23 Sept 2026
5 Sept 2026
23 Sept 2026
5 Sept 2026
23 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Vellore District Construction of Mini Community Sanitary Complex for Boys Toilet Type -6 (GHSS ) in Solavaram at Solavaram Panchayat at Kaniyambadi Block SBM(G) 2026 -2027 Package no 01 | - | - | - | - |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 25.86 | cum | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 4.54 | cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 5.62 | cum | - | - |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 6.5 | cum | - | - |
| 6 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 27.81 | sqm | - | - |
| 7 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 40.16 | sqm | - | - |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.63 | MT | - | - |
| 9 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm | 8.79 | cum | - | - |
| 10 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 17.56 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_843398.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .