| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC 184 BHUPENDRA ROY ROAD KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | L1 | Accepted-AOC The work order has been issued. | |
| 2 | L2₹14.1 L+₹2,040 (0.14%)Rejected-Finance GR 8 ADDA 1 FLOOR CITY CENTRE DURGAPUR 713216 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713216 | L2 | Rejected-Finance 2nd LOWEST BIDDER | |
| 3 | L3₹17.9 L+₹3.8 L (27.2%)Rejected-Finance MAIRAKATA P O GARBETA DIST PASCHIM MEDINIPUR 721127 | GARBETA | PASCHIM MEDINIPUR | WEST BENGAL | 721127 | L3 | Rejected-Finance 3rd LOWEST BIDDER |
| Sl No | Description | Qty | Unit | MODERN ELECTRIC L1 | DURGAPUR POWER L2 | R.K.ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Electrical Installation maintence manpower charges for day to day (preventive , corrective and breakdown ) & replacement of materials ( supplied by Dept ) at the time of demand from Authority concern / officers at site within the following areas . The maintence & replacement of materials with Lamp , Holder , Choke , Fl. Tube , LED Lamp , HPSV Choke , Condenser , Ignitor , Fan Condenser, wires etc should be 3 (three ) shifts per day on working & holiday including operation of HT and LT Electrical Installation and arrangement for uninterupted power supply as when required to different Hospital utilities and operation of DG set with sub stations and for rutine preventive maintenance work and report recorded in the prescribed format by the Engineer -in-charge subject to terms , condition & scope of work . The agency have to depute folowing categories of personnel for day to day maintenance of EI work with the valid workman permit / license from the Director of Electricity , West Bengal , and all of them should be provided with self explanatory photo Identity cardsas per direction of EIC Area Coverd : i) Main Sub Station, ii) Blood Bank, Surgery OT, Causality OT, CCU, USG Room, Orthopaedic OT , ENT OT, Male Medical Ward, Female Medical Ward, Male Chest Ward, Female Chest Ward , Covid-19 ward , MSVP office etc including allied areas of Main & Emergency Building iii) Haematology Lab , Microbiology Lab, Covid-19 Testing Lab , Pharmacology Lab, Pathology Lab, Anatomy (Organ) Museum , Central Library , 350 Lecture Hall etc of Natun Bhavan Building iv) Sub Division office ,with various Quarters & street light etc. | ||||||
| 1.01 | Skilled- Electrician ( 1 person in A shift + 1 person in B shift + 1 person in C shift per day ) = (Total 3 nos Skilled Electrician per day for 03 (three) Shift X 12 Month.) | 12 | Months | 61,678 ₹7,40,136 Lowest | 61,768 ₹7,41,216 | 77,613 ₹9,31,356 |
| 1.02 | Semi - Skilled Electrician ( 1 person in A shift + 1 person in B shift + 1 person in C shift per day ) = (Total 3 nos Semi-Skilled Electrician per day for 03 (three) Shift X 12 month) | 12 | Months | 55,566 ₹6,66,792 Lowest | 55,646 ₹6,67,752 | 71,502 ₹8,58,024 |
| 2.00SCOPE OF WORK : The primary objectives of preventive and corrective maintenance are to minimize electrical breakdowns and faults, prevent fire hazards arising from electrical short circuits and faults, and reduce downtime. Any fire hazard incidents resulting from short circuits, or the falling of ceiling fans, luminaries, etc., due to inadequate maintenance will be treated with utmost seriousness. The maintenance agency shall be held accountable for such incidents. a) The electrical installation includes entire cabling network and wirings, BDB's, PDB’s power & distribution cables, O.H. Lines, Compound lights, fittings & fixture. LT panels, FDA systems, UPS system, Sub-Stations etc. b) The mainsterviece nalsao icncluedes : 1) DG set - Operation of DG sets as and when required & checking and maintenance of AMF panel including checking the condition of fuel level, Lubricating oil & battery connection etc, carrying & pouring of Fuel if necessary and maintaining the log book. 2) FDA System - Cleaning and dusting of detectors and devices of Fire Detectection and annunciation system periodically, once in a month. 3) UPS System - Periodic checking (twice in a month) of Water level of Battery and pouring of water if required in consulatation with Concerned AE/JE 4) Quarterly inspection, testing and cleaning of all HT & LT substation equipments by deployment of separate legally authorized qualified personnel having SCC/Workman’s permit as mentioned elsewhere in this contract with submission of IR/Earth Test Reports (once in six months) in the format prescribed by the Engineer-in- Charge. Log books/Call books/Materials Register/Attendance Register are to be maintained at each substation/office in the format prescribed by the EIC. | ||||||
| 3.00ADDITIONAL & SPECIAL TERMS & CONDITIONS OF CONTRACT (For E.I. Maintenance) : The agency must provide measuring/operating equipment such as digital multimeter, clambmeter, thermal imeger, earth regeistance tester, low voltage insulation mager, hot air blower, air blower, screw driver set, all type of spaner, cable puncher etc. to the employed staff. | ||||||
| 3.01The agency shall maintain one Call Book which shall record all the calls alongwith remedial action taken, duly verified by the Junior Engineer/Assistant Engineer periodically. | ||||||
| 3.02Separate Log book is to be maintained for L.T. installation & H.V. installation. The daily record of the Log book is to be signed by the licensed Supervisor of the contractor and verified & signed by concerned Junior Engineer & Assistant Engineer; and the same should be sent to the Executive Engineer through proper channel at the time of submission of bills. | ||||||
| 3.03Recording of various electrical parameters (with co. own tools/equipments) of different L.T. panel board, BDBs, Main switches etc, recording of different parameters of 11 KV H.T. Sub-stations equipments, testing of Insulation Resistance, Earth Resistance etc. are to be made in Log book in regular manner and the necessary working report in this respect to be submitted monthly to the concerned Assistant Engineer & Junior Engineer every day. Thermal imager should be used in measuring/observing temperature rise of electrical equipments like Transformer, H.T. VCBs, BDBs, L.T. panel boards, AC, Light fittings, etc. regularly to find out any abnormalities and the measurements are to be recorded in Log book compulsorily in proper manner every day. | ||||||
| 3.04In case, any abnormal reading is noticed, then the same should be rectified/set right immediately by taking prompt, appropriate & effective measures/actions by proper recording under intimation to the concerned Assistant Engineer & Junior Engineer. | ||||||
| 3.05All type of maintenance & operation tasks incl. proper testing, checking etc. with necessary action of preventive & corrective/rectifying measure in case of any fault/abnormality for Sub-stations within the compound are to be accomplished with proper care, safety & precaution measure and all these tasks are to be recorded in separate Log books, which are to be signed by highly skilled electrician & licensed supervisor deployed by the contractor duly verified & signed by concerned Assistant Engineer & Junior Engineer on regular basis. | ||||||
Tender Value
Refer Docs
EMD Value
₹35,576
Closing Date
7 Mar 2026, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE,SWEC,PWD, MIDNAPORE
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
Annual mtc. of complete electrical installation works incl. main sub stations, main and emergency buildings, CCU, all operation theatres, Natun Bhavan bldg, subdivision office and allied areas of hospital complex under BSMCH Electrical Section II
2026_WBPWD_1010426_1
WBPWD/SE/SWEC/NIQ42/2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
BANKURA
Please refer Tender documents.
3 documents required · 3 mandatory
₹35,576
OFFICE OF THE SE,SWEC,PWD,MIDNAPORE
2 Nov 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
7 Mar 2026
24 Feb 2026
24 Feb 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Electrical Installation maintence manpower charges for day to day (preventive , corrective and breakdown ) & replacement of materials ( supplied by Dept ) at the time of demand from Authority concern / officers at site within the following areas . The maintence & replacement of materials with Lamp , Holder , Choke , Fl. Tube , LED Lamp , HPSV Choke , Condenser , Ignitor , Fan Condenser, wires etc should be 3 (three ) shifts per day on working & holiday including operation of HT and LT Electrical Installation and arrangement for uninterupted power supply as when required to different Hospital utilities and operation of DG set with sub stations and for rutine preventive maintenance work and report recorded in the prescribed format by the Engineer -in-charge subject to terms , condition & scope of work . The agency have to depute folowing categories of personnel for day to day maintenance of EI work with the valid workman permit / license from the Director of Electricity , West Bengal , and all of them should be provided with self explanatory photo Identity cardsas per direction of EIC Area Coverd : i) Main Sub Station, ii) Blood Bank, Surgery OT, Causality OT, CCU, USG Room, Orthopaedic OT , ENT OT, Male Medical Ward, Female Medical Ward, Male Chest Ward, Female Chest Ward , Covid-19 ward , MSVP office etc including allied areas of Main & Emergency Building iii) Haematology Lab , Microbiology Lab, Covid-19 Testing Lab , Pharmacology Lab, Pathology Lab, Anatomy (Organ) Museum , Central Library , 350 Lecture Hall etc of Natun Bhavan Building iv) Sub Division office ,with various Quarters & street light etc. | |||||
| 1.01 | Skilled- Electrician ( 1 person in A shift + 1 person in B shift + 1 person in C shift per day ) = (Total 3 nos Skilled Electrician per day for 03 (three) Shift X 12 Month.) | 12 | Months | - | - |
| 1.02 | Semi - Skilled Electrician ( 1 person in A shift + 1 person in B shift + 1 person in C shift per day ) = (Total 3 nos Semi-Skilled Electrician per day for 03 (three) Shift X 12 month) | 12 | Months | - | - |
| 2SCOPE OF WORK : The primary objectives of preventive and corrective maintenance are to minimize electrical breakdowns and faults, prevent fire hazards arising from electrical short circuits and faults, and reduce downtime. Any fire hazard incidents resulting from short circuits, or the falling of ceiling fans, luminaries, etc., due to inadequate maintenance will be treated with utmost seriousness. The maintenance agency shall be held accountable for such incidents. a) The electrical installation includes entire cabling network and wirings, BDB's, PDB’s power & distribution cables, O.H. Lines, Compound lights, fittings & fixture. LT panels, FDA systems, UPS system, Sub-Stations etc. b) The mainsterviece nalsao icncluedes : 1) DG set - Operation of DG sets as and when required & checking and maintenance of AMF panel including checking the condition of fuel level, Lubricating oil & battery connection etc, carrying & pouring of Fuel if necessary and maintaining the log book. 2) FDA System - Cleaning and dusting of detectors and devices of Fire Detectection and annunciation system periodically, once in a month. 3) UPS System - Periodic checking (twice in a month) of Water level of Battery and pouring of water if required in consulatation with Concerned AE/JE 4) Quarterly inspection, testing and cleaning of all HT & LT substation equipments by deployment of separate legally authorized qualified personnel having SCC/Workman’s permit as mentioned elsewhere in this contract with submission of IR/Earth Test Reports (once in six months) in the format prescribed by the Engineer-in- Charge. Log books/Call books/Materials Register/Attendance Register are to be maintained at each substation/office in the format prescribed by the EIC. | |||||
| 3ADDITIONAL & SPECIAL TERMS & CONDITIONS OF CONTRACT (For E.I. Maintenance) : The agency must provide measuring/operating equipment such as digital multimeter, clambmeter, thermal imeger, earth regeistance tester, low voltage insulation mager, hot air blower, air blower, screw driver set, all type of spaner, cable puncher etc. to the employed staff. | |||||
| 3.01 | The agency shall maintain one Call Book which shall record all the calls alongwith remedial action taken, duly verified by the Junior Engineer/Assistant Engineer periodically. | - | - | - | - |
| 3.02 | Separate Log book is to be maintained for L.T. installation & H.V. installation. The daily record of the Log book is to be signed by the licensed Supervisor of the contractor and verified & signed by concerned Junior Engineer & Assistant Engineer; and the same should be sent to the Executive Engineer through proper channel at the time of submission of bills. | - | - | - | - |
| 3.03 | Recording of various electrical parameters (with co. own tools/equipments) of different L.T. panel board, BDBs, Main switches etc, recording of different parameters of 11 KV H.T. Sub-stations equipments, testing of Insulation Resistance, Earth Resistance etc. are to be made in Log book in regular manner and the necessary working report in this respect to be submitted monthly to the concerned Assistant Engineer & Junior Engineer every day. Thermal imager should be used in measuring/observing temperature rise of electrical equipments like Transformer, H.T. VCBs, BDBs, L.T. panel boards, AC, Light fittings, etc. regularly to find out any abnormalities and the measurements are to be recorded in Log book compulsorily in proper manner every day. | - | - | - | - |
| 3.04 | In case, any abnormal reading is noticed, then the same should be rectified/set right immediately by taking prompt, appropriate & effective measures/actions by proper recording under intimation to the concerned Assistant Engineer & Junior Engineer. | - | - | - | - |
| 3.05 | All type of maintenance & operation tasks incl. proper testing, checking etc. with necessary action of preventive & corrective/rectifying measure in case of any fault/abnormality for Sub-stations within the compound are to be accomplished with proper care, safety & precaution measure and all these tasks are to be recorded in separate Log books, which are to be signed by highly skilled electrician & licensed supervisor deployed by the contractor duly verified & signed by concerned Assistant Engineer & Junior Engineer on regular basis. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.61 MB
BOQ_2480982.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .