Superintending Engineer PMGSY Circle Jammu
Office of the Superintending Engineer PMGSY Circle Jammu Tiger Division Burma Dwar, Satwari
Construction and Maintenance of link road from Chamber Kanari road Km 1.150 to Tatkhana , PACKAGE NO. JK11-4051, PMGSY-IV, Batch-I of 2026-27 Block- Mandi DISTRICT POONCH (using waste Plastic (LENGTH - 2.00 Kms)
2026_JKRRD_148064_1
JK114051
Open Tender
Civil Works - Roads
300 days
Mandi
Please refer Tender documents.
8 documents required · 8 mandatory
₹10,000
₹9.1 L
PMGSY Circle Jammu
29 May 2026
29 May 2026
23 Jun 2026
30 May 2026
22 Jun 2026
2 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Hilly Roads:- Excavation in all kinds of soil, Soft Rock & Hard Rock, by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with all lift and leads as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 . | 32,371.26 | Cum | 222.42 | ₹72,00,015.65 |
| 2 | Excavation for Structures:- Earthwork in excavation for structures in all kinds of soil, soft and hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides and bottom and backfilling in trenches with excavated suitable material including de watering if required. | 1,806.73 | Cum | 605.45 | ₹10,93,884.68 |
| 3 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | 181.92 | Cum | 5,653.7 | ₹10,28,521.1 |
| 4 | Providing and laying of plain cement concrete of Grade M-15 in Foundation complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 266.73 | Cum | 5,848.7 | ₹15,60,023.75 |
| 5 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | 156.87 | Cum | 6,249.04 | ₹9,80,286.9 |
| 6 | Providing and laying of plain Cement concrete of Grade M-20 in foundations complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. | 22.34 | Cum | 6,460.6 | ₹1,44,329.8 |
| 7 | Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. | 35.63 | Cum | 6,902.28 | ₹2,45,928.24 |
| 8 | Providing and laying reinforced cement concrete of Grade M-25 in super structures complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204, 1205.4 & 1205.5 . Including cost of curing ,and form work , all leads, lifts and carriages of materials by MT complete. | 26.57 | Cum | 8,106.44 | ₹2,15,388.11 |
| 9 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Super Structure including bending, binding complete as per drawings & Technical specification Clauses 1002, 1010 and 1202 including cost of binding wire and also including, all leads , lifts, handling & re-handling and carriage of materials by MT complete. | 2.65 | MT | 94,652.09 | ₹2,50,828.04 |
| 10 | Polygonal/Random Rubble Masonry laid Dry un coursed brought to course in sub structure including cost of bond/through stones, all leads, lifts, carriages,of materials by MT handling and re-handling complete. | 392.49 | Cum | 3,126.17 | ₹12,26,990.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.06 MB
SBDPoonchTatkhana4051.pdf
Tender Documents • 1.88 MB
BOQ_231165.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid