Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 45 ADARSH COLONY UDHAMPUR J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 1 181 KAMATCHI AMMAN KOVIL STREET KANNAN COLONY CHINTHAMANI MADURAI 625009 | MADURAI | MADURAI | TAMIL NADU | 625009 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 Cr
Closing Date
22 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (P) CH UDhampur
GE (P) CH Udhampur PIN-900386 C/o 56 APO
Quotation for rates of certain E/M items are inviting for supply of material for Completion of incomplete work for construction of 650 Bedded Hospital alongwith OTM Accn incl Lift, Central AC Plant, Hot Water Supply, Fire Hydrant, Sprinkler System,
2023_MES_583424_1
3001//Quoatation/2022-23/10/E3
Open Tender
Civil Works
Item Rate
30 days
GE (P) CH Udhampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
24 Mar 2023
28 Feb 2023
24 Mar 2023
1 Mar 2023
22 Mar 2023
8 Mar 2023
Amount
HOT WATER BOILER
Supply only High speed diesel fired Hot Water boiler of capacity 10 Lakh Kcal, as per BS845 Part-I, Wet back type, Indirect method with hot water outlet temp 1400 C, Inlet water temp 1200 C, hot water circulation rate 50m3/hr, Voltage level 415V+6% and 50Hz+3% 3ph., 4 wire and control volts 240/220 Volts, 1 Ph, 50 Hz including fwg accessories:- Make: Thermax/Forbes.
(a) MAIN UNIT (SMW - 1000) :- Full fusion welded shell duly insulated with mineral wool & cladded with MS colour pre-coated sheet. Pressure part consisting of wet back furnace, two sets of convection smoke tubes, hinged refractory door and smoke chamber with soot cleaning door - 01 for each boiler. Note:- ERW tubes Tubes OD X Thickness – As per OEM standards
(b) PRESSURE JET DUAL BLOC BURNER ASSEMBLY :- Pressure jet dual bloc burner assembly suitable for diesel firing along with the modulation mechanism required for the burner turndown. Burner is suitable to take ambient air - 01 No for each boiler.
(c) COMBUSTION FORCED DRAFT FAN ASSEMBLY:- The Combustion Forced Draft Fan Assembly shall be supplied. The control of the air to the furnace shall be done with the help of damper control assembly. The fan shall be as per relevant IS standards. The Fan casing, impeller and the vanes shall be of Carbon steel - 01 for each boiler
(d) HOT WATER CIRCULATION PUMPS (1 WORKING + 1 STANDBY):- Two circulating pumps (1W + 1S) along with coupling, coupling guard, and motor, single air-cooled mechanical seal duly assembled on a base frame - 02 Nos for each boiler.
(e) FOUNDATION / ANCHOR BOLTS:- As per OEM recommendations.
(f) CONTROL PANEL BOX ASSEMBLY:- Power cum control panel, free standing type confirming to IP 42 with MCB/MCCB- 01 for each boiler The panel is made out of 14 / 16 SWG CRCA sheets and powder coated with Siemens gray color. he power & control section are physically isolated with partition plate - The power section is provided with a main incomer Isolating switch with MCCB. - The required switch gears for all the feeders are housed in the power section. - Burner management system along with necessary start stop button, auxiliary contactor, and control circuit of all motors, indication lamps & hooter for the alarm are housed in the control section.
(g) MAKE UP WATER PUMP:- Make up pump of 2 m³/hr capacity & 63 mLC along with drive motor assembly mounted on a base frame - 01 for each boiler.
(h) All the connection assessories/instruments as per the scope of supply mentioned in P&ID. Instruments offfered shall be suitable for area classification- 01 set for each boiler.
Note :- (i) The cost all the accessories and instrument shall be included in the quoted rates and will be supllied by the contractot without any extra cost to the Dept. (ii) Any other required accessories to performing hot water boilers desire efficiency shall aslo be included in the quoted rates and will be supplied without any extra cost to the Dept.
Hot Water Boiler. Fixing only of High speed diesel fired Hot Water boiler of capacity 10 Lakh Kcal, as per BS845 Part-I, Wet back type, Indirect method with hot water outlet temp 1400 C, Inlet water temp 1200 C, hot water circulation rate 50m3/hr, Voltage level 415V+6% and 50Hz+3% 3ph., 4 wire and control volts 240/220 Volts, 1 Ph, 50 Hz including fwg accessories:-
(a) MAIN UNIT (SMW - 1000) :- Full fusion welded shell duly insulated with mineral wool & cladded with MS colour pre-coated sheet. Pressure part consisting of wet back furnace, two sets of convection smoke tubes, hinged refractory door and smoke chamber with soot cleaning door - 01 for each boiler Note:- ERW tubes Tubes OD X Thickness – As per OEM standards
(b) PRESSURE JET DUAL BLOC BURNER ASSEMBLY :- Pressure jet dual bloc burner assembly suitable for diesel firing along with the modulation mechanism required for the burner turndown. Burner is suitable to take ambient air - 01 No for each boiler
(c) COMBUSTION FORCED DRAFT FAN ASSEMBLY:- The Combustion Forced Draft Fan Assembly shall be supplied. The control of the air to the furnace shall be done with the help of damper control assembly. The fan shall be as per relevant IS standards. The Fan casing, impeller and the vanes shall be of Carbon steel - 01 for each boiler
(d) HOT WATER CIRCULATION PUMPS (1 WORKING + 1 STANDBY):- Two circulating pumps (1W + 1S) along with coupling, coupling guard, and motor, single air-cooled mechanical seal duly assembled on a base frame - 02 Nos for each boiler.
(e) FOUNDATION / ANCHOR BOLTS:- As per OEM recommendations.
(f) CONTROL PANEL BOX ASSEMBLY:- Power cum control panel, free standing type confirming to IP 42 with MCB/MCCB- 01 for each boiler The panel is made out of 14 / 16 SWG CRCA sheets and powder coated with Siemens gray color. he power & control section are physically isolated with partition plate - The power section is provided with a main incomer Isolating switch with MCCB. - The required switch gears for all the feeders are housed in the power section. - Burner management system along with necessary start stop button, auxiliary contactor, and control circuit of all motors, indication lamps & hooter for the alarm are housed in the control section.
(g) MAKE UP WATER PUMP:- Make up pump of 2 m³/hr capacity & 63 mLC along with drive motor assembly mounted on a base frame - 01 for each boiler.
(h) All the connection assessories/instruments as per the scope of supply mentioned in P&ID. Instruments offfered shall be suitable for area classification- 01 set for each boiler.
Note :- Fixing rates also includes testing and commissioning without any extra cost to the department.
PAWAN KUMAR GOVT. CONTRACTORS
M/S VED PARKASH GUPTA
R K BUILDERS
stage.html
html • 0.02 MB
finance_653623.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .