| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance Lowest One |
| 2 | L2₹3.1 L+₹19,125.06 (6.67%)Rejected-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹3.1 L+₹19,125.06 (6.67%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹3.2 L+₹34,451.77 (12.0%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹3.2 L+₹34,451.77 (12.0%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹3.6 L+₹75,733.02 (26.4%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹3.6 L+₹75,733.02 (26.4%) | L4 | Rejected-Finance 4th Lowest |
| 5 | L5₹4.0 L+₹1.1 L (39.3%)Rejected-Finance PO DHARCHANDNA TEHSIL CHOPAL DISTT SHIMLA | ₹4.0 L+₹1.1 L (39.3%) | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹6.1 L
EMD Value
₹15,000
Closing Date
22 Jan 2024, 11:00 amClosed
DPO, IDP, Shimla at Shoghi
DPO, IDP, Shimla at Shoghi
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Chapai Nala in GP- Dharchandna under Nerwa unit
2024_CPD1_83851_1
DLT / 019/ 2023-24
Open Tender
Civil Works - Water Works
Item Rate
60 days
Nerwa Shimla H.P.
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DPO, IDP
₹15,000
23 Jan 2024
10 Jan 2024
22 Jan 2024
10 Jan 2024
22 Jan 2024
10 Jan 2024
10 Jan 2024 - 22 Jan 2024
Amount
Construction of Brushwood vegetative barrier cutting and preparation of wooden posts 2.00 long, 8 to 10 cm dia and digging of holes 20-30 cm dia and 50 cm deep, fencing of live hedge in position complete including binding of rope and carriage of material in all lead & lifts.
Cutting in earth work and disposal of excavated earth upto a lead of 20 Pick and jump work
Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returing the stacked soil in 15 cm layers, when required into plinths sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres as directed by Engineer-in-Charge. Pick and jump work
C/o check dam/Check wall in Dry stone Masonry complete as per drawing and technical specifications.
Providing and laying boulder apron for bed protection with stone boulders laid dry complete as per drawing and technical specifications.
Providing and Weaving of wire netting for wire crate with GI wire 4mm/5mm or SWG 6/8 including binding sides and protion to make crate of : in 15x15 cm mesh including all respect complete and carriage of material in all lead and lifts.
Boulder filling dry hand packed titely as in crate/apron bunds
Collection of boulder stones along the nallah
Carriage of boulder stone by manual labour over a distance of 200 metre average
RAM LAL
RAJESH KUMAR
MANOJ KUMAR
Tulsi Ram
DEVENDER SINGH
Dinesh Kumar Govt Contractor
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .