Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86,993.49Admitted-Fee/PreQual/Technical/Finance | -13.00% | ₹86,993.49 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹98,992.60+₹11,999.10 (13.8%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹98,992.60+₹11,999.10 (13.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹99,992.52+₹12,999.03 (14.9%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹99,992.52+₹12,999.03 (14.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
8 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
REPAIRMENT OF IRRIGATION LADH NEAR LAND OF MASOOD AHMAD AND OTHERS AT ARDGUND SADOORA A BLOCK VESSU
2026_RDPR_323185_30
ENIT103of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,000
11 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-in- charge:
1:4:8 or leaner mix (i/c equivalent design mix) | 1 | cum | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | cum | - | - |
| 0.0 | S/P of Stone Soling hand packed tightly in bed including levelling & ramming. | - | cum | - | - |
| 0.0 | P/L in position of cement concrete of specified grade excluding the cost of centring and shuttering 1:3:6 by using 20mm nominal size agg | - | cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1 Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 0.0 | carriage of materials by MT | - | - | - | - |
| 0.9 | sand aggregates for an avg lead of 10kms by mt(sta) | 1 | cum | - | - |
| 0.0 | Carriage of material by H/L , Lead 150m (STA),Crushed stone aggregate/sand | - | cum | - | - |
| 0.9 | Soling stone | - | cum | 1 | - |
| 0.0 | Provision for Signboard, Photograph. And unforeseen items | - | Job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1087161.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .