| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 15 HOSHIYAR SINGH PARK KIRBY PLACE DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | ₹2.0 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹2.1 Cr+₹12.8 L (6.54%)Rejected-Finance | ₹2.1 Cr+₹12.8 L (6.54%) | L2 | Rejected-Finance Not being lowest |
| 3 | L3₹2.1 Cr+₹14.2 L (7.25%)Rejected-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | ₹2.1 Cr+₹14.2 L (7.25%) | L3 | Rejected-Finance Not being lowest |
| 4 | L4₹2.1 Cr+₹18.9 L (9.70%)Rejected-Finance 1 206 SHOP NO 71 MANDIR MARKET SADAR BAZAR DELHI CANTT 110010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | ₹2.1 Cr+₹18.9 L (9.70%) | L4 | Rejected-Finance Not being lowest |
| 5 | L5₹2.3 Cr+₹32.3 L (16.5%)Rejected-Finance 232 1 D SHIVLOK KANKARKHERA DISTT MEERUT UP PIN 250001 | MEERUT | MEERUT | UP | 250001 | ₹2.3 Cr+₹32.3 L (16.5%) | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | V r traders L3 | M/S SURINDERAS CONSTRUCTION CO. L6 | A R construction L4 | Shikhar ji Enterprises L5 | Shivom Projects Private limited L1 | L G BUILDERS L7 | Adhunik Builders L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkhats or frames n.exc 1.50 sqm with shutters (without taking off shutters from the frames) complete all as specified and directed. | 450 | Each | 49 ₹22,050 | 10 ₹4,500 Lowest | 69 ₹31,050 | 80 ₹36,000 | 40 ₹18,000 | 50 ₹22,500 | 25 ₹11,250 |
| 2.00 | Taking down chowkhats of frames exc 1.50 sqm but n. exc 4.0 sqm with shutters (without taking off shutters from the frames) complete all as specified and directed. | 42 | Each | 49 ₹2,058 | 10 ₹420 Lowest | 89 ₹3,738 | 120 ₹5,040 | 100 ₹4,200 | 50 ₹2,100 | 50 ₹2,100 |
| 3.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed. | 80 | Cum | 89 ₹7,120 | 100 ₹8,000 | 199 ₹15,920 | 200 ₹16,000 | 100 ₹8,000 | 250 ₹20,000 | 50 ₹4,000 Lowest |
| 4.00 | Dismantling of brick tiles, terracing tiles, single layer from roof laid, bedded and pointed in any mortar complete all as specified and directed. | 1,980 | Sqm | 7.49 ₹14,830.2 | 10 ₹19,800 | 9 ₹17,820 | 35 ₹69,300 | 5 ₹9,900 Lowest | 36 ₹71,280 | 5 ₹9,900 Lowest |
| 5.00 | Removal of Mud from top roof slab, any thickness, including plastering and leeping (whether full thickness removed or only a part thereof) complete all as specified and directed. | 237 | Cum | 299 ₹70,863 | 100 ₹23,700 Lowest | 399 ₹94,563 | 200 ₹47,400 | 100 ₹23,700 Lowest | 150 ₹35,550 | 150 ₹35,550 |
| 6.00 | Demolition of reinforced cement concrete as in roofs, floors (other than ground floors), beams, staircases ,landing chajjas and similar suspended work (Reinforcement cut as required to facilitate demolition) of any description and in any position not otherwise specially provided complete all as specified and directed. | 20 | Cum | 49 ₹980 Lowest | 100 ₹2,000 | 599 ₹11,980 | 250 ₹5,000 | 450 ₹9,000 | 300 ₹6,000 | 50 ₹1,000 |
| 7.00 | Demolition of cement concrete (unreinforced) of any description and in any position not specifically provided for complete all as specified and as directed. | 90 | Cum | 49 ₹4,410 Lowest | 100 ₹9,000 | 299 ₹26,910 | 200 ₹18,000 | 120 ₹10,800 | 300 ₹27,000 | 50 ₹4,500 |
| 8.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 2,212 | Sqm | 7.49 ₹16,567.88 | 5 ₹11,060 Lowest | 29 ₹64,148 | 10 ₹22,120 | 5 ₹11,060 Lowest | 25 ₹55,300 | 5 ₹11,060 Lowest |
| 9.00 | Dismantling of aluminimum partition from its position carefully and refixing at same places after fixing of floor tile area of each partion n exc 6.00 Sqm complete all as specified and directed. | 120 | Each Job | 329 ₹39,480 | 500 ₹60,000 | 299 ₹35,880 | 280 ₹33,600 | 300 ₹36,000 | 1,500 ₹1,80,000 | 50 ₹6,000 Lowest |
| 10.00 | Roughening surfaces of old concrete floor by picking sweeping clean and washing down with water to remove dust and brushing neat cement slurry with 3.0 Kg of cement per sqm complete all as specified and directed. | 1,980 | Sqm | 7.49 ₹14,830.2 | 5 ₹9,900 Lowest | 9 ₹17,820 | 10 ₹19,800 | 5 ₹9,900 Lowest | 15 ₹29,700 | 10 ₹19,800 |
Tender Value
₹2.7 Cr
EMD Value
₹3.4 L
Closing Date
25 Oct 2025, 6:00 pmClosed
HQ Chief Engineer Delhi Zone
HQ Chief Engineer Delhi Zone Delhi Cantt-10
SPL REPAIR TO BLDG NO. P-204, P-215 AND P-216 DOUBLE STOREY SINGLE LIVING BARRACKS AT COD UNDER GE NORTH DELHI CANTT-10
2025_MES_728034_1
CEDZ/TOKEN-30 OF 2025
Open Tender
Civil Works
Item Rate
270 days
Delhi Cantt-10
As per NIT
10 documents required · 10 mandatory
₹2,000
GE North
₹3.4 L
Yes
28 Feb 2026
27 Aug 2025
28 Oct 2025
27 Aug 2025
25 Oct 2025
18 Oct 2025
27 Aug 2025 - 3 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
uploadtender8381.rar
Tender Documents • 4.59 MB
BOQ_815030.xls
BOQ • 0.91 MB
05ammd83181.pdf
PDF • 0.60 MB
04Amdt83181.pdf
PDF • 0.19 MB
03Amdt83181.pdf
PDF • 0.15 MB
02amdt83181.pdf
PDF • 0.19 MB
01amdt83181.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .