Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹62.5 Laccepted-aoc | ₹62.5 L | accepted-aoc |
Tender Value
₹60.3 L
EMD Value
₹1.2 L
Closing Date
29 Jun 2026, 4:30 pmClosed
Minor Irrigation Department
Sahana. K.S
Construction of Check Dam near Naganahalli and Chambenahalli kere in Bangarpet Taluk Kolar District.
MI/2025-26/DA/WORK_INDENT10107/CALL-2
MI/2025-26/DA/WORK_INDENT10107/CALL-2
Open
Dam and Allied works
Two Tender Document System(Two Cover)
Minor Irrigation Division Kolar
₹1,510
₹1.2 L
16 Sept 2026
22 Jun 2026
30 Jun 2026
25 Jun 2026
In Figures
Total Cost Net of Tax =
Add Consultancy Services Tax @ 12.36% =
TOTAL COSTS (Including Tax) =
Note : The ceiling cost of the consultancy is as shown in the Summary of Costs. Payments will be made as per stipulations of the Special Conditions of Contract.
Authorised Signatory
Name and Title of Signatory : Mr. A.T.Samuel, Executive Director
Name of Firm : STUP Consultants P Ltd., Bangalore
Krishna Raja Anicut under Package-I (In Arkalgud & K.R.Nagara talukas of Mysore district)
4B. SUMMARY OF COSTS
In Figures
Total Cost Net of Tax =
Add Consultancy Services Tax @ 12.36% =
TOTAL COSTS (Including Tax) =
Note : The ceiling cost of the consultancy is as shown in the Summary of Costs. Payments will be made as per stipulations of the Special Conditions of Contract.
Authorised Signatory
Name and Title of Signatory : Mr. A.T.Samuel, Executive Director
Name of Firm : STUP Consultants P Ltd., Bangalore
Break up of Costs for Package-I
Team Leader
Project Advisor
Senior Irrigation Engineer
Dam Expert
Senior Structural Engineer
Irrigation Engineer
Senior Surveyor
Senior Geotechnical Engineer
Senior Quantity Surveyor
GIS Expert
Field Engineer
TOTAL =
Structural Engineer
Structural Engineer
Assistant Field Engineer
Surveyor
Assistant Geotechnical Engineer
Quantity Surveyor
Senior CAD Operator
CAD Operator
CAD Operator
TOTAL =
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.
a) Purchases = 2 vehicles for 3 months and 1 vehicle for 6 months at Rs.50,000/- only rental per month for 9 months = 50000x9 =
b) Operation, Maintenance, Repairs = At Rs.2,000/- per one maintenance per one month for 9 months = 2000x1x9 =
TOTAL =
Professional Staff
a) 2 site trips per month for 2 days each @ Rs.5,000/- per trip (Boarding, Lodging and other incidental expenses) for 6 months = 5000x2x6 =
a) Transport conveyance (Taxi hiring charges) for 2 site trips per month for 2 days each @ Rs.10,000/- per trip for 6 months = 10000x2x6 =
TOTAL =
Office / accomodation for Field Engineers & Surveyors @ Rs.10,000/- per month for 6 months = 10000x6 =
TOTAL =
Authorised Signatory
Name and Title of Signatory : Mr. A.T.Samuel, Executive Director
Name of Firm : STUP Consultants P Ltd., Bangalore
PACKAGE-I - Krishna Raja & Chamaraja Anicuts (In Arkalgud, K.R.Nagara & Hunsur talukas of Mysore district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 1
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. A.E.Chidananda
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 1
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. M.Mahesh
Mr. K.N.Bhojaraj
Mr. Sanjay Miraskar
Mr. R.Venugopal
Mrs. Praveen C. Prabhu
Mrs. S.Hemalatha
Ms. R.Usha
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-II - Mirle/Ramasamudra & Katte Malalavadi Anicuts (In K.R.Nagara & Hunsur talukas of Mysore district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 2
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. R.Varaprasad
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 2
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr.Nanda Kumar.R.N.
Mr.Parameshwaraiah
Mr.P.R.Mahalingam
Mr. V.S.Bidare
Mr. K.T.Arasu
Mr.N.Ramamurthy
Mr.V.R.S.Sharma
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-III - Kudlur, Kitur, Haluvagilu & Changaravalli Anicuts (In Belur & Hassan talukas of Hassan district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 3
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. K.N.Saravanan
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 3
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. Raghotham K.Patil
Mr.Narayanaswamy
Mr. Sanjay Miraskar
Ms. M.Jayashree
Mr. Vasanth Kumar
Mr.M.G.Mahendra
Mrs.N.Vishalakshmi
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-IV - Mandagere & Hemagiri Anicuts (In K.R.Nagara & K.R.Pete talukas of Mandya district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 1
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. A.E.Chidananda
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 1
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. M.Mahesh
Mr. K.N.Bhojaraj
Mr. Sanjay Miraskar
Mr. R.Venugopal
Mrs. Praveen C. Prabhu
Mrs. S.Hemalatha
Ms. R.Usha
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-V - Devaraya & Virija Anicuts (In Mysore, Srirangapatna & T.N.Pura talukas of Mysore/Mandya districts)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 2
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. R.Varaprasad
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 2
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr.Nanda Kumar.R.N.
Mr.Parameshwaraiah
Mr.P.R.Mahalingam
Mr. V.S.Bidare
Mr. K.T.Arasu
Mr.N.Ramamurthy
Mr.V.R.S.Sharma
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-VI - Chikkadevaraya & Bangaradoddi Anicuts (In T.N.Pura, Srirangapatna & Pandavapura talukas of Mandya/Mysore districts)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 3
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. K.N.Saravanan
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 3
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. Raghotham K.Patil
Mr.Narayanaswamy
Mr. Sanjay Miraskar
Ms. M.Jayashree
Mr. Vasanth Kumar
Mr.M.G.Mahendra
Mrs.N.Vishalakshmi
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-VII - Ramaswamy & Raja Parameshwari Anicuts (In T.N.Pura, Malavally & Mysore talukas of Mysore district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 1
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. A.E.Chidananda
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 1
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. M.Mahesh
Mr. K.N.Bhojaraj
Mr. Sanjay Miraskar
Mr. R.Venugopal
Mrs. Praveen C. Prabhu
Mrs. S.Hemalatha
Ms. R.Usha
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-VIII - Hullahalli & Halasur Anicuts (In Mysore, T.N.Pura, Nanjanagud & H.D.Kote talukas of Mysore district)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 2
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. R.Varaprasad
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 2
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr.Nanda Kumar.R.N.
Mr.Parameshwaraiah
Mr.P.R.Mahalingam
Mr. V.S.Bidare
Mr. K.T.Arasu
Mr.N.Ramamurthy
Mr.V.R.S.Sharma
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
PACKAGE-IX - Madhavamanthri, Thaggahalli & D.J. Anicuts (In T.N.Pura, Malavally, Maddur & Kollegala talukas of Mysore, Mandya & Chamarajanagra districts)
3G. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL - Team 3
Mr. A.T.Samuel
Mr. G.K.Suryaprakash
Mr. G.V.Venugopal
Mr. U.R.Raghotham
Mr. K.N.Saravanan
Mr. M.R.Raghunandan
Mr. H.R.Malatesh
Mr. K.N.Jayaprakash
Mr. D.R.Krishnamurthy
Mr. M.N.Srinivasa
Mr. D.Mohammed Rafi
Full Time :
Reports Due :
Activities Duration :
Denotes Professional Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Professional Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
3G. TIME SCHEDULE FOR SUPPORT STAFF - Team 3
Mr. K.Prabhananda
Mr. D.S.Nagesh
Mr. Raghotham K.Patil
Mr.Narayanaswamy
Mr. Sanjay Miraskar
Ms. M.Jayashree
Mr. Vasanth Kumar
Mr.M.G.Mahendra
Mrs.N.Vishalakshmi
Full Time :
Reports Due :
Activities Duration :
Denotes Support Staff will be active and work through out the length shown for the time specified as and when required.
Denotes Support Staff will be active for the period shown.
Signature
(Authorised Representative)
Full Name :
Title :
Address :
Milstone Chart (Financial Bar Chart)
Construction of Check Dam near Naganahalli and Chabenahalli kere in Bangarpet Taluk, Kolar District. (MI/2025-26/DA/WORK_INDENT10107)
1st month
Physical
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Removal of stumps and roots including backfilling with suitable material to required compaction Girth from 300 mm to 600 mm Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery,labour,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Dam & Allied Works) Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing and constructing dry rubble stone pitching 300 mm thick with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete. Complete with all lead and lifts and as per the directions of engineer incharge of work.
De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification. Complete with all lead and lifts and as per the directions of engineer incharge of work.
Month wise total
Ist milestone
Milestone
Milestones and liquidity damages
Milestones
Mile Stone 1
Mile Stone 2
Mile Stone 3
Earthwork excavations and Embankment
Cement Concrete
Reinforcement of Steel
Annual turn over
Similar nature of work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Activity financial physical bar chart 10107.xls
Instructions to Tenderers • 0.43 MB
mineral dispatch permit.zip
Instructions to Tenderers • 6.45 MB
723 MISU 2025.pdf
Others - GO Copy • 0.06 MB
INDENT 10107 KW3 BID Document.doc
Tender Document • 1.57 MB
Royalty circular.jpg
Instructions to Tenderers • 0.11 MB
SCAN_20260619_172346946.pdf
Design Document • 0.80 MB
New Royalty Rate.pdf
Instructions to Tenderers • 4.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .