Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.3 CrAdmitted-Finance C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | -51.11% | ₹33.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹36.8 Cr+₹3.5 Cr (10.7%)Admitted-Finance | -45.90% | ₹36.8 Cr+₹3.5 Cr (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹37.6 Cr+₹4.3 Cr (12.9%)Admitted-Finance | -44.80% | ₹37.6 Cr+₹4.3 Cr (12.9%) | L3 | Admitted-Finance |
| 4 | L4₹37.8 Cr+₹4.5 Cr (13.5%)Admitted-Finance | -44.50% | ₹37.8 Cr+₹4.5 Cr (13.5%) | L4 | Admitted-Finance |
| 5 | L5₹38.9 Cr+₹5.6 Cr (16.8%)Admitted-Finance 102 RAVINDRA NAGAR OLD PALASIA INDORE M P | INDORE | MADHYA PRADESH | 452001 | -42.89% | ₹38.9 Cr+₹5.6 Cr (16.8%) | L5 | Admitted-Finance |
Tender Value
₹68.1 Cr
EMD Value
₹68.1 L
Closing Date
27 Apr 2026, 5:30 pmClosed
Chief Engineer NH(PW) Konkan Bhavan Navi Mumbai
Chief Engineer NH(PW) Konkan Bhavan Navi Mumbai
Performance Based Maintenance Contract (PBMC)work for Rehabilitation and Upgradation of Chikhali Khamgaon section of NH548C design Km.43.962 to 100.065 (length 52.703 km) with two/four lane with paved shoulder configuration of NH548CC in the State of
2026_MoRTH_902349_1
10/EENH/AKL/2025-26/02, Dt.11.03.2026
Open Tender
Civil Works - Highways
Percentage
1825 days
Chikhali
Please refer tender documents
5 documents required · 5 mandatory
₹11,800
Executive Engineer NHD Akola
₹68.1 L
Chief Engineer NH(PW) Konkan Bhavan Navi Mumbai
18 May 2026
13 Mar 2026
28 Apr 2026
13 Mar 2026
27 Apr 2026
13 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | ROUTINE MAINTENANCE ( Lumpsum)
( For Toal Length 60 Months ) | - | Lumpsum | 14,26,51,449 | - |
| 1.2 | INITAL RECTIFICATION WORKS ( Lumpsum)
(To be completed within 06 months from the notice to proceed) | - | LumpSum | 7,95,91,520.3 | - |
| 1.3 | PERIODICAL MAINTENANCE WORKS (LumpSum)
(To be completed as decided by the Engineer but overlay of Highway to be completed within 24 Months ( as the case may be) from the date of notice to proceed) | - | LumpSum | 43,67,35,634.72 | - |
| 1.4 | Emergency Works ( Unit Rates) | - | LumpSum | 1,09,34,580 | - |
| 1.5 | AMC For ATMS Facility | - | LumpSum | 20,00,000 | - |
| 1.6 | Charges For Electricity Bill | - | LumpSum | 88,00,000 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_948446.xls
BOQ • 0.28 MB
nit10corg4other.pdf
PDF • 0.78 MB
nit10corg3date.pdf
PDF • 0.76 MB
nit102corg2date.pdf
PDF • 0.33 MB
pbmcchikhlikhmgrfpmerged.pdf
PDF • 3.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .