Loading…
Loading…
Tender Value
₹3.7 Cr
EMD Value
₹1.9 L
Closing Date
1 Sept 2023, 3:00 pmClosed
DC/EO
Thirumanjanaveethi Swamimalai-612302
Repair and Restoration at (sbu temple of Arulmigu Swaminatha swamy Temple,swamimalai) Arulmigu kabartheeswararSwamyTemple,Thiruvalanchuzhi Kumbakonam Taluk, Thanjavur District
2023_HRCE_350010_1
01/2023 date 17 07 2023
Open Tender
Civil Works - Others
Item Rate
455 days
Arulmigu Swaminatha swamy Temple, swamimalai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.9 L
21 May 2024
27 Jul 2023
1 Sept 2023
27 Jul 2023
1 Sept 2023
27 Jul 2023
Amount
Repair and Restoration at Arulmigu Kabartheeswarar Swamy Temple,Thiruvalanchuzhi
Clean removal of Cement mortar plaster from the surface of walls etc,. asper standard specifications.(W-0103,Page-25)
Through scrapping of old plaster surface (W-0106,Page-26) etc., complete as per standard specification.
Brick work Striching in Lime Mortor 1:2 using Wire cut bricks of size 9" x 4" x 2" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Dismantling of stone masonry in lime mortar walls (W-0013,Page-21)
Dismantling, clearing away and carefully stacking materials useful for reuse for Brick/Stone Masonry in cement mortar wall under 3m high (W-0015,Page-21)etc., complete as per standard specification.
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of Pline Cement Concrete work work (W-0034,Page-22)etc., complete as per standard specification.
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of Lime concrete (W-0033,Page-22) etc., complete as per standard specification.
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of Terracing work in roof or floor (W-0017,Page-21)etc., complete as per standard specification.
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of wrought and put-up framed timber in roof/floor (W-0028,Page-22)etc., complete as per standard specification.
Supplying of country wood for making the following items using Illuppai wood (W-2267,Page-171)
Cut stone masonry work (using old stones) in Lime mortar 1:2 including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Plastering with Lime mortar 1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard Specifications.
Providing water wash with stone structure appropriate methodology to restore the originalities of the existing granite structure including hire charges, scaffolding arrangement conveyance charges for tools and plants and machinaries to the work ship spot and cleaning the site after completion of work etc, complete.
Pointing the cut stone Masonry with Lime mortar 1:1.5 (One part of Lime and one and a half part of sand) including cost and conveyance of all materials and all labour charges, curing etc. complete complaying with standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant standard specification including cost of supplying filling sand etc.,complete as per standard specification.
Brick jelly lime Cement concrete 1:2:5 (One of Lime two of sand and five of Brick jelly) for foundation using 40mm gauge Brick jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in all respects complying with relevant Std, Specification and as directed by the Department Officers.
Brick work in Lime mortar 1:2 using Wire cut bricks for Heritage works of size 9" x 4" x 2" including cost and conveyance of all materials and labour charges and all other incidental charges etc., complete complying with standard specification. For foundation and basement.
Dome brick work in Lime Mortor 1:2 using Wire cut bricks for Heritage works of size 9" x 4" x 2" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Brick masonry Lime mortar 1:2 (Heritage works) using Wire cut bricks for Heritage works of size 9" x 4" x 2" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including Lime, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete for vimanam / gopuram
Kalkaram Upto 15'0" for Sannathi
Arasaralru theerdavari vimmanam Upto 15'0"
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) curved surface centering
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortar 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc., complete including all extra for folding and including clearing from the vimanams/gopurams superficial area
For kalkaram 15'0" height
Vimanam 15'0" height
Brick work in Lime Mortor 1:2 using Wire cut bricks for Heritage works of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification works for foundation and basement.
Labour charges for cut stone old stone Flooring Removing excluding cost and conveyance of stone from quarry but including all labour charges for Stacking at places shows as per the Instruction ofdepartmental officers etc, complete (Labour charges for old stone Flooring Removing) (Sl.No.2,page-162)
Labour charges for old stone Flooring Fixing excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing, scaffolding charges handling charges hoisting and fixing in position etc complete.,Labour charges for old stone Flooring Fixing. (W-0218,Page-173)
Flooring with cut stone slab 600mm x 600 mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the department officers including cost and conveyance of all materials to site and labour charges for paving and pointing with Lime mortar 1:1.5 etc.,complete as per standard specification.
Brick on edge flooring over a bed of concrete 100 mm thick and pointing with Lime Mortar 1:1.5 including cost of all materials and labour charges for laying etc., complete as per the standard specification.
Plastering with Lime mortar 1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specfication.
Special ceiling plastering for R.C.C. slab beam and sunshades with cement mortar 1:3, 10mm thick including cost and conveyance of all materials and labour charges, curing etc., complete complying with standard specifications.
Clean removal of old paint from the surface of OLD WOOD DOOR,WINDOW and Painting old wood work with two coats of enamel paint of approved quality and color over one coat of white primer in all floors the rates is to include cost of all materials, brushes scaffolding charges etc., complete complying with standard specifications.
Clean removal of old paint from the surface OLD IRON WORK and Repainting old iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc., complete complying with standard specifications.
Best varnish two coats for wood works etc, complete complying with standard specifications.
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost conveyance loding and unloding charges etc. complete with standard specification. (M-2277,2278,2279,Page-172)
Labour charges for laying cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for laying cut stone Thani Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
DRILLING of borewells any where in Tamilnadu including transportation from one place to another within Tamilnadu in alluvial soil or sedimentary strata of clay and sand or sand, stone, shale, pebbles boulers etc. By first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia by direct or reverse rotary mud, and circulation method, using Contractor's rigs, fuel, labour, drilling bentonite mud and water required for drilling at site. Site will be shown by the Departmental officers including construction of mud pit. (Only Calyx drills are to be used).TWAD Sl.No.14(a)page-282
Reaming from 140/150 mm dia pilot bore to 300mm dia bore as directed by the Departmental Officers etc., complete
Labour charges for inserting PVC casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement paste etc. complete.
Supply and Delivery of unplasticised for plain PVC Casing pipes for the following dia in 3m length with screwed and Socket ends and centering guides for every 15m length of pipes as per IS 12818/2010 and as amended from time to time to suit deep borewells upto 80m to 250m depth (CM) for delivery at site with ISI marking including transfortation charges and etc complete. DN 200mm PVC plain casing pipes.(DN 200mm PVC plain casing pipe Asper TWAD 1.1/Page No.17
Supply and Delivery of unplasticised for ribbed screen PVC Casing pipes for the following dia in 3m length with screwed and socket ends and centering guide for every 15m length of pipes as per IS 12818/2010 and as amended from time to time to suit deep borewells for delivery at site withing ISI marking including transfortation charges and etc complete. DN 200mm Ribbed screen pipe.ISI marking including transfortation charges and etc complete. DN 200mm PVC plain casing pipes.
Charges for developing the bore wells with Air compressor of 300 CFM capacity (minimum 8 hours) including transportation labour and fuel charges for compressor as directed by Departmental officers and conducting yield test by "V" Notch method.(TWAD Sl.No,14(e) page-282
Supply and Delivery and fixing of DN 200mm PVC end plug suitable for the above pipes with ISI marking etc. complete.TWAD 1.5 PVC SPECIALS AS PER IS 10124/1982 Part-II/SL.No.11,page-12
Supplying and filling of sand and gravel mix complying with relevant standard specification including cost of supplying filling sand etc.,complete as per standard specification.
Scraping the decayed lime plastered from the surface of vimanams and gopuram, carefully including isolated bricks of brick work without damaging the varivargams racking out the joint cleaning the surface with water including all working in heights, hire charges for special tools, brushes etc., complete as per standard specifications.
Excluding kalkaram(Height 15')
Excluding kalkaram(Height 25')
Excluding kalkaram Above (50'0"Height)
Providing new sudhai vigrahams in the vimanams and Rajagopurams with coper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1:5 (Heritage work) added 20% of Lime finishing the same with lime mortar 1:1:5 (Heritage work) added 20% of cement bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as broken bricks, and copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including multicolour painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) size of sudhai 3'6"to 4'6"
Providing scaffolding charges for Vimanam/Gopuram with casurina posts coconut or palm trees wherever necessary for main formwork and providing with net lawn/pvc mesh coveribg, providing ladder arrangements, country wood plank for working inspection etc., complete Hire charges only for errection and maintenance and removing the same on completion of work. as per standard specification. 15'0"(W-0210,Page-172)
Providing scaffolding charges for Vimanam/Gopuram with casurina posts coconut or palm trees wherever necessary for main formwork and providing with net lawn/pvc mesh coveribg, providing ladder arrangements, country wood plank for working inspection etc., complete Hire charges only for errection and maintenance and removing the same on completion of work. as per standard specification. Up to 75' ht. (W-0213,Page-172)
Painting with multicolour (Panchavarnam) good water based exterior emulsion paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.15'00"
(a). Vimanam /Gopuram upto 15'00" height
(b).Vimanam /Gopuram upto 25'0" height
(c).Vimanam /Gopuram upto 100'0" height
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
M Ganesan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_417198.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .