Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.1 L+₹13,883 (0.69%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.4 L+₹41,940 (2.10%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹20.5 L+₹49,345 (2.47%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹21.6 L+₹1.6 L (7.92%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S GAJENDRA PAL SINGH CONTRACTOR L4 | RAJKUMARI L1 | M/S PRADEEP ASSOCIATES L10 | M/s CHANDRA PAL SINGH L2 | M/S SAMPOORNA CREATION L5 | S F INFRA PROJECTS L3 | SHREE RAMESHWAR SINGH L8 | SHIVA ENTERPRISES L7 | Jitendra Construction L9 | JAI MAHAKAL CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN FOUNDATION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER IN CHARGE UP TO 30 METER LEAD FROM THE FOUNDATION | 50 | CUM | 45 ₹2,250 | 50 ₹2,500 | 100 ₹5,000 | 45 ₹2,250 | 80 ₹4,000 | 40 ₹2,000 Lowest | 40 ₹2,000 Lowest | 100 ₹5,000 | 90 ₹4,500 | 470 ₹23,500 |
| 2.00 | UPROOTTING JHUNDS AND MOONJ DISPOSAL AWAY FROM SITE | 575 | SQM | 20 ₹11,500 | 18 ₹10,350 | 35 ₹20,125 | 5 ₹2,875 | 28 ₹16,100 | 5 ₹2,875 | 3 ₹1,725 Lowest | 35 ₹20,125 | 35 ₹20,125 | 35 ₹20,125 |
| 3.00 | CLEANING THIKS BUSHES AND THORNY JUNGLE WITHOUT UPROOTING | 1,150 | SQM | 2 ₹2,300 | 2 ₹2,300 | 4 ₹4,600 | 0.4 ₹460 Lowest | 3.5 ₹4,025 | 1 ₹1,150 | 3 ₹3,450 | 4.4 ₹5,060 | 10 ₹11,500 | 41 ₹47,150 |
| 4.00 | PROVIDING AND LAYING C C 1 3 6 IN FOUNDATION AND FLOOR INLUDING COST OF MATERIAL LABOUR T AND P ETC | 18.8 | CUM | 5,000 ₹94,000 | 4,500 ₹84,600 | 5,000 ₹94,000 | 4,000 ₹75,200 | 4 ₹75.2 Lowest | 5,000 ₹94,000 | 500 ₹9,400 | 5,000 ₹94,000 | 1,500 ₹28,200 | 5,151.53 ₹96,848.76 |
| 5.00 | DISMENTLING BRICK WORK OR STONE WORK AND CEMENT CONCRETE IN CEMENT MORTAR AND INCLUDIND STACKING OF MATERIAL WITH IN A DISTANCE OF 60M AS PER DIRECTION OF ENGINEER IN CHARGE | 4.9 | CUM | 350 ₹1,715 | 350 ₹1,715 | 1,000 ₹4,900 | 200 ₹980 | 414 ₹2,028.6 | 300 ₹1,470 | 500 ₹2,450 | 518 ₹2,538.2 | 25 ₹122.5 Lowest | 5,100 ₹24,990 |
| 6.00 | Ist CLASS BRICK WORK IN 1 4 CM INCVLUDING ALL COST OF MATERIAL LABOUR AND T AND P ETC COMPLETE | 112 | CUM | 4,800 ₹5,37,600 | 4,500 ₹5,04,000 | 5,100 ₹5,71,200 | 5,200 ₹5,82,400 | 4,810 ₹5,38,720 | 5,200 ₹5,82,400 | 6,000 ₹6,72,000 | 5,000 ₹5,60,000 | 4,000 ₹4,48,000 Lowest | 4,705.53 ₹5,27,019.36 |
| 7.00 | CENTERING AND SHUTTERING FOR R C C WORK INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P | 330 | SQM | 500 ₹1,65,000 | 500 ₹1,65,000 | 800 ₹2,64,000 | 250 ₹82,500 | 649 ₹2,14,170 | 400 ₹1,32,000 | 700 ₹2,31,000 | 600 ₹1,98,000 | 600 ₹1,98,000 | 71 ₹23,430 Lowest |
| 8.00 | STEEL REINFOCEMENT INCLUDING BENDING BINDING CUTTING PLACEING OF REINFORCEMENT MATERIAL LABOUR T AND P | 4.6 | MT | 68,000 ₹3,12,800 | 65,000 ₹2,99,000 | 80,000 ₹3,68,000 | 70,000 ₹3,22,000 | 66,773 ₹3,07,155.8 | 60,000 ₹2,76,000 | 65,000 ₹2,99,000 | 62,000 ₹2,85,200 | 80,000 ₹3,68,000 | 75 ₹345 Lowest |
| 9.00 | RCC 1 1.5 3 IN SALB AND ABUTMENT INCLUGDING ALL MATERIAL LABOUR AND T AND P ETC COMPLETE | 38.5 | CUM | 5,500 ₹2,11,750 | 5,500 ₹2,11,750 | 7,500 ₹2,88,750 | 6,900 ₹2,65,650 | 5,947 ₹2,28,959.5 | 6,000 ₹2,31,000 | 6,500 ₹2,50,250 | 6,500 ₹2,50,250 | 1,500 ₹57,750 Lowest | 4,100 ₹1,57,850 |
| 10.00 | DISMENTLING EXISTING PLASTER INCLUDING DISPOSAL OF REFUSE WITH IN DISTANCE OF 60M | 129 | SQM | 15 ₹1,935 | 20 ₹2,580 | 80 ₹10,320 | 20 ₹2,580 | 21.44 ₹2,765.76 | 10 ₹1,290 Lowest | 150 ₹19,350 | 26.8 ₹3,457.2 | 15 ₹1,935 | 1,919.53 ₹2,47,619.37 |
Tender Value
₹27.2 L
EMD Value
₹54,400
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIGARH
CONSTRUCTION OF BOUNDRY WALL THE SECURITY OF MAKHAINA TAR GHAR INPECTION HOUSE SITUATED ON ANUPSHAHR BRANCH
2025_UPIDC_1070366_10
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹54,400
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .