| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹14.3 L+₹1.3 L (10.1%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹14.6 L+₹1.7 L (12.8%)Accepted-Finance | L3 | Accepted-Finance Accepted |
Tender Value
₹13.0 L
EMD Value
₹13,000
Closing Date
23 Aug 2024, 6:00 pmClosed
se
edc sonbhadra
Electrical work
2024_PVVNV_944226_1
47/edc(so)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹13,000
4 Sept 2024
7 Aug 2024
24 Aug 2024
7 Aug 2024
23 Aug 2024
7 Aug 2024
Amount
CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 10 Km.)
ST Pole 11 Mtr Long
Top Channel MS 100x50x2240 mm.Long
MS Channal 125x65x1300 Sq MM (T-off)
11 KV Pin Insulator With Pin
ACSR Weasal conductor
ACSR Dog conductor
11 KV V-type Cross Arm
MS Dropper Angle
Stay Complete
AB Cable 3x120 SQ MM
3 Phase Distribution Box
Earthing Complete
Stay Loop Insulator
GS/GI Earth Wire 6 SWG
400 KVA T/F
250 KVA T/F
DE-CENTRALIZED MATERIALS, Provided Contractor
X-Arm Holding Clamp with Nut&Bolt
Barbed Wire
F-Bracket
Danger Board with Nut&Bolt
Clamp for T/F
Nut & Bolt Washear
I Hook with End Dead and Clamp
I Hook with Suspenstion and Clamp
Top, T-Off Cross Bracing Angle Clamp With Nut & Bolt
Work of following materials as Per RESSPO/PuVVNL norms at the work site.
Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing Complete
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL Conductor, binding with insulators & jumpering.
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Dog conductor , binding with insulators & jumpering.
AB Cable 3x120 SQ MM
INSTALATION OF 250 KVA TRANSFORMER ON SUBSTATION BASE
INSTALATION OF 400 KVA TRANSFORMER ON SUBSTATION BASE
INSTALATION OF 3 Phase Distribution Box
GS/Gi Earth Wire 6 SWG
Dismount of Aaccesseries of all Poles
Work of Opening Jumper
Dismount of old/used/damaged ACSR conductor/GI wire/ Lt ABC cable make in bundle and safely carriage to dump store
Carriage of old used materials from dump store to store center sonbhadra
Ashirvad Enterprises
M/s ANITA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .