Executive Engineer, DED Landal House, Lalkothi Complex, GTA
(a) Emergent restoration Road from Marybong to Saila Dhura, between 0-1 km ch 23.24 Lingia Marybong GP (b) Emergent restoration Road from Ram Golai to Tomsang Khasmal, between 2-3 km ch 18.19 Lingia Marybong GP(c) Emergent restoration from Tomsang Po
2026_GTA_993157_1
GTA/ED/ DMCD(SDRF)/EE/DED(ES-I)/ NIeT-79/1(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
Darjeeling
As per NIeT
4 documents required · 4 mandatory
₹0
₹3.6 L
22 Jan 2026
22 Jan 2026
16 Feb 2026
23 Jan 2026
13 Feb 2026
23 Jan 2026
(a) Marybong to Saila Dhura : Land slide clearance in soil-Clearance of landslide in soil and ordinary rock by Bull dozer….
Earth work in excavation of foundation of structuresas per drawing and technical specification, includingsetting out, removing, spreading or stacking of spoilswithin a lead of 150 m. as directed and includingtrimming the sides of the trenches, leveling, dressingand ramming the bottom, and backfilling withapproved material complete as per direction of theEngineer-in-Charge In all sorts of soil excluding marshy soil &rocks (soft or hard) by manual means.a) upto 3 m depth (iv) Without pumping out water and shoring
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steel sheetplate with required bracing for any kind of plain orreinforced concrete works in all sorts of minorstructure including culvert, box culvert, cross-drainetc. The rate is inclusive of fitting, fixing and strikingout after completion of work as per specification anddirection
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wallwith 100 mm dia AC pipe, extending through the fullwidth of the structure with slope of 1V:20H towardsdrawing face. Complete as per drawing and Technicalspecifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material
Dry Rubble Flooring Construction of dry rubble flooring at cross drainage works for relatively less important works.
(b) Ram Golai to Tomsang Khasmal : Land slide clearance in soil-Clearance of landslide in soil and ordinary rock by Bull dozer….
Earth work in excavation of foundation of structuresas per drawing and technical specification, includingsetting out, removing, spreading or stacking of spoilswithin a lead of 150 m. as directed and includingtrimming the sides of the trenches, leveling, dressingand ramming the bottom, and backfilling withapproved material complete as per direction of theEngineer-in-Charge In all sorts of soil excluding marshy soil &rocks (soft or hard) by manual means.a) upto 3 m depth (iv) Without pumping out water and shoring
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steel sheetplate with required bracing for any kind of plain orreinforced concrete works in all sorts of minorstructure including culvert, box culvert, cross-drainetc. The rate is inclusive of fitting, fixing and strikingout after completion of work as per specification anddirection
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wallwith 100 mm dia AC pipe, extending through the fullwidth of the structure with slope of 1V:20H towardsdrawing face. Complete as per drawing and Technicalspecifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material
Dry Rubble Flooring Construction of dry rubble flooring at cross drainage works for relatively less important works.
(c) Tomsang Pokhari to Limbu Dhura : Land slide clearance in soil-Clearance of landslide in soil and ordinary rock by Bull dozer….
Earth work in excavation of foundation of structuresas per drawing and technical specification, includingsetting out, removing, spreading or stacking of spoilswithin a lead of 150 m. as directed and includingtrimming the sides of the trenches, leveling, dressingand ramming the bottom, and backfilling withapproved material complete as per direction of theEngineer-in-Charge In all sorts of soil excluding marshy soil &rocks (soft or hard) by manual means.a) upto 3 m depth (iv) Without pumping out water and shoring
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steel sheetplate with required bracing for any kind of plain orreinforced concrete works in all sorts of minorstructure including culvert, box culvert, cross-drainetc. The rate is inclusive of fitting, fixing and strikingout after completion of work as per specification anddirection
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wallwith 100 mm dia AC pipe, extending through the fullwidth of the structure with slope of 1V:20H towardsdrawing face. Complete as per drawing and Technicalspecifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material
Dry Rubble Flooring Construction of dry rubble flooring at cross drainage works for relatively less important works.
Construction of Dry lean concrete sub base over a prepared sub grade with coarse and fine aggregates conforming..
Add 18% GST
Add 1% Cess
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_2428953.xls
BOQ • 0.35 MB
WBF-2911.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .