Tender Value
₹3.5 L
EMD Value
₹6,920
Closing Date
22 Jan 2024, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Improvement Renovation of Direct Outlet of Main Ravi Canal by way if RCC wall and Pitching Grouting near RD 43900M at spots
2024_IFC_242463_1
e-NIT No. 14 of 2023-24
Open Tender
Civil Works - Canal
Item Rate
20 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹6,920
Executive Engineer RCC Lower Division Hiranagar
24 Jan 2024
10 Jan 2024
23 Jan 2024
10 Jan 2024
22 Jan 2024
10 Jan 2024
10 Jan 2024 - 15 Jan 2024
15 Jan 2024
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dumping stone excluding cost of stones. in Horizontal on level
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Supply of Nallah Stone
Carriage of Materials from Source to site of work a) Carriage of Stone agg. 20MM niminal size av. 10 Kms by Mechincal Transport and 300M Head Load
Carriage of Materials from Source to site of work b) Carriage of Nallah Stone av. 8 Kms by Mechincal Transport and 300M Head Load
Disposal of silt. Av. 2 Kms by Mechnical Transport and 300M Head Load
AJAY PANOTRA
ANKUSH SHARMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .