Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
5 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RNB DIVISION VAILOO
EXECUTIVE ENGINEER RNB DIVISION VAILOO
Construction of Lane , by way of soiling / metalling from house of Mohd Yaseen sofi towards house of Nazir Ahmad Mir at Magray Mohalla , constt. Of protection bund from house of Farooq
2021_PWDJK_118247_1
FRESHNIT99Vailoo
Open Tender
Civil Works
Item Rate
20 days
ACHABAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Yes
EXECUTIVVE EGINEER RNB DIVISION VAILOO
Exempted
6 Mar 2021
25 Feb 2021
6 Mar 2021
26 Feb 2021
5 Mar 2021
26 Feb 2021
120 days
Amount
Construction of Lane , by way of soiling / metalling from house of Mohd Yaseen sofi towards house of Nazir Ahmad Mir at Magray Mohalla ,
Supplying and fillig of RBM / GSB including spreading , levelling , dressing , compacting with 8-10 tone road roller capacity , loading , unloading , watering , ramming and all carriages involved complete job.
Providing and laying WBM G-II of specified grade 63mm to 45 mm size including supplying and stacking of graded stone agg. Including suplying and stacking of stone screenings including supplying and stacking of binding material including laying of WBM with stone screenings and binding material , including consolidation with PRR 8-10 tone capacity including all carriages involved complete job.
Providing / laying of RCC pipes including trench excavation for the same laying of pipes in proper slope and position ,refilling of excavated material including Cushing of pipes with Nallah muck all leads , lifts and carriage complete job. 16 Inch dia including all carriages complete job.
Add cost of photographs and sign boards complete job.
constt. Of protection bund from house of Farooq Ahmad Shahkaz towards house of Reyaz Ahmad Ganie at Khazirshahmohalla
Earth work excavation by mechanically means trenches for foundation , drains, pipes , cables etc. not exceeding 1.5 m in width and for shafts , wels , cesspits and the like not exceeding 10 sqm on plan , depth up to 1.5 m including disposal of excavated earth up to 50 m from cutting edge disposed earth to be levelled and neatly dressed as directed by Engineer In charge at site complete job. (all kinds of soil) .
Providing and laying stone soling hand packing complete job including all carriages involved. Complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) INCLD ALL CARRIAGES INVOLVED.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) INCLD ALL CARRIAGES INVOLVED. Complete job.
12 mm thick cement plaster in 1:4 mix 1 cemet : 4 fine sand including all carriages complete job.
Centering and shuttering incld. Strutting, propping etc and removal of form work for : Foundations , footings and bases of columns etc.
Add cost of photographs and sign boards complete job. Including loading for 250 mtrs for all materials
constt. Of side wall / edge wall at house of Mohd Ramzan Shahkaz towards shed at Ab. Rashid Khan at Khazir Shah Mohalla
Earth work excavation by mechanically means trenches for foundation , drains, pipes , cables etc. not exceeding 1.5 m in width and for shafts , wels , cesspits and the like not exceeding 10 sqm on plan , depth up to 1.5 m including disposal of excavated earth up to 50 m from cutting edge disposed earth to be levelled and neatly dressed as directed by Engineer In charge at site complete job. (all kinds of soil) .
Providing and laying stone soling hand packing complete job including all carriages involved. Complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) INCLD ALL CARRIAGES INVOLVED.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) INCLD ALL CARRIAGES INVOLVED. Complete job.
12 mm thick cement plaster in 1:4 mix 1 cemet : 4 fine sand including all carriages complete job.
Centering and shuttering incld. Strutting, propping etc and removal of form work for : Foundations , footings and bases of columns etc.
Add cost of photographs and sign boards complete job. Including loading for 250 mtrs for all materials
Fencing of Graveyard near house of Mushtaq Ahmad Mir at Magray Mohalla
Earth work excavation by mechanically means trenches for foundation , drains, pipes , cables etc. not exceeding 1.5 m in width and for shafts , wels , cesspits and the like not exceeding 10 sqm on plan , depth up to 1.5 m including disposal of excavated earth up to 50 m from cutting edge disposed earth to be levelled and neatly dressed as directed by Engineer In charge at site complete job. (all kinds of soil) .
Providing and laying stone soling hand packing complete job including all carriages involved. Complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) INCLD ALL CARRIAGES INVOLVED.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) INCLD ALL CARRIAGES INVOLVED. Complete job.
Structural steel work in single section fixed without connecting plateIncld. Cutting hosing , fixing in position and applying a priming cost of Approved steel primer all complete`
P/ Fixing of chain link fencing with angles by welding plate iron over it with all cost and carriages and painting etc. complete job.
12 mm thick cement plaster in 1:4 mix 1 cemet : 4 fine sand including all carriages complete job.
Centering and shuttering incld. Strutting, propping etc and removal of form work for : Foundations , footings and bases of columns etc.
Add cost of photographs and sign boards complete job. Including head load for 250 m for al materials
constt. Of lane / drain from Masjid sharief towords house of Gh. Nabi Mir at Gori Mohalla at MC Achabal
Dismentalling of top of drain wall with other objects for secouring the iron railing on top of drain
Structural steel work in single section fixing connecting plateIncld. Cutting hosing , fixing in position and applying a priming cost of Approved steel primer all complete`
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) INCLD ALL CARRIAGES INVOLVED. Complete job.
12 mm thick cement plaster in 1:4 mix 1 cemet : 4 fine sand including all carriages complete job.
Centering and shuttering incld. Strutting, propping etc and removal of form work for : Foundations , footings and bases of columns etc.
Add cost of photographs and sign boards including head load for 25 mtrs for all materials complete job.
M/S NAZIR AHMAD RATHER
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .