Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical S O GHULAM MOHD R O BOGDANG | Accepted-Technical Responsive |
| 2 | Accepted-Technical LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING LEH | Accepted-Technical Responsive |
| 3 | Accepted-Technical R O NEY | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹2.5 Cr
EMD Value
₹6.0 L
Closing Date
9 Apr 2026, 2:00 pmClosed
Executive Engineer PWD RnB Nubra
Executive Engineer PWD RnB Nubra
Construction of link road from main road to New Pachathang. (Under Distt. Capex)
2026_PWD_18663_1
68 of PWD RnB Nubra 2025-26
Open Tender
Civil Works - Roads
Percentage
720 days
Nubra
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
Executive Engineer PWD RnB Nubra.
₹6.0 L
5 May 2026
20 Mar 2026
11 Apr 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil @98% | |||||
| 2Ordinary rock @2% | |||||
| 3Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil @80% | |||||
| 4Ordinary rock @20% | |||||
| 5Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | |||||
| 6Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | |||||
| 7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | |||||
| 8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | |||||
| 9Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | |||||
| 10Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto and above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_44717.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .