Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹1.3 Cr+₹8.7 L (7.20%)Rejected-Finance SKALZANGLING AIR PORT ROAD LEH LADAKH 194101 | LEH | LEH | LADAKH | 194101 | ₹1.3 Cr+₹8.7 L (7.20%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.3 Cr+₹11.5 L (9.53%)Rejected-Finance | ₹1.3 Cr+₹11.5 L (9.53%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹1.5 Cr+₹27.4 L (22.8%)Rejected-Finance | ₹1.5 Cr+₹27.4 L (22.8%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹1.5 Cr+₹28.4 L (23.6%)Rejected-Finance 137 3 STREET NO 4 RAJINDER NAGAR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.5 Cr+₹28.4 L (23.6%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S RIGDOL CONSTRUCTION L4 | PADMA ENTERPRISES L2 | M/S ANIL KUMAR L5 | M/S GLOBAL ENGINEERS L3 | M/S BILAL AHMAD BHAT L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for Excavating over areas, n exc 1.5 m deep and getting out Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 613.22 | Cum | 650 ₹3,98,593 | 400 ₹2,45,288 | 1,279 ₹7,84,308.38 | 330 ₹2,02,362.6 | 290 ₹1,77,833.8 Lowest |
| 2.00 | M & L for Excavating over areas, exc 1.5 m and n.exc 3.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 608.52 | Cum | 700 ₹4,25,964 | 400 ₹2,43,408 | 1,499 ₹9,12,171.48 | 390 ₹2,37,322.8 | 310 ₹1,88,641.2 Lowest |
| 3.00 | M & L for Excavating over areas, exc 3.00 m and n.exc 4.50 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 384.25 | Cum | 750 ₹2,88,187.5 | 500 ₹1,92,125 | 1,599 ₹6,14,415.75 | 470 ₹1,80,597.5 | 374 ₹1,43,709.5 Lowest |
| 4.00 | M & L for Excavating over areas, exc 4.50 m and n.exc 6.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 103.16 | Cum | 800 ₹82,528 | 600 ₹61,896 | 2,159 ₹2,22,722.44 | 680 ₹70,148.8 | 400 ₹41,264 Lowest |
| 5.00 | M & L for Excavating over areas, exc 6.00 m and n.exc 7.50 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge | 48.12 | Cum | 850 ₹40,902 | 650 ₹31,278 | 2,659 ₹1,27,951.08 | 800 ₹38,496 | 450 ₹21,654 Lowest |
| 6.00 | M & L for Excavating over areas, exc 7.50 m and n.exc 9.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 1.54 | Cum | 900 ₹1,386 | 800 ₹1,232 | 4,999 ₹7,698.46 | 1,500 ₹2,310 | 450 ₹693 Lowest |
| 7.00 | M & L for Excavating in trenches, not exc. 1.50 m wide and not exc. 1.50 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 571.5 | Cum | 700 ₹4,00,050 | 590 ₹3,37,185 | 1,009 ₹5,76,643.5 | 490 ₹2,80,035 | 290 ₹1,65,735 Lowest |
| 8.00 | M & L for Excavating in trenches, n exc. 1.50 m wide and exc 1.50 not exc. 3.00 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 9.45 | Cum | 750 ₹7,087.5 | 400 ₹3,780 | 2,569 ₹24,277.05 | 800 ₹7,560 | 280 ₹2,646 Lowest |
| 9.00 | M & L for Excavating in trenches, n exc. 1.50 m wide and exc 3.00 not exc. 4.50 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | 1 | Cum | 800 ₹800 | 600 ₹600 | 2,999 ₹2,999 | 1,500 ₹1,500 | 300 ₹300 Lowest |
| 10.00 | M & L for Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed by Engineer-in-charge | 1,038.65 | Cum | 90 ₹93,478.5 Lowest | 200 ₹2,07,730 | 99 ₹1,02,826.35 | 130 ₹1,35,024.5 | 150 ₹1,55,797.5 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
27 Apr 2026, 2:00 pmClosed
CWE(AF) Leh
HQ CWE(AF) Leh
ADDN ALTN TO EXISTING SEWAGE SYSTEM AT CERTAIN LOCATIONS IN DOMESTIC AREA AT AF STN LEH
2026_MES_757579_1
82230/E8
Open Tender
Civil Works
Item Rate
180 days
GE(AF) Leh
As per NIT
10 documents required · 10 mandatory
₹1,000
GE (AF) Leh
₹2.7 L
Yes
8 Jun 2026
25 Mar 2026
29 Apr 2026
25 Mar 2026
27 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | M & L for Excavating over areas, n exc 1.5 m deep and getting out Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating over areas, exc 1.5 m and n.exc 3.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating over areas, exc 3.00 m and n.exc 4.50 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating over areas, exc 4.50 m and n.exc 6.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating over areas, exc 6.00 m and n.exc 7.50 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge | - | Cum | - | - |
| - | M & L for Excavating over areas, exc 7.50 m and n.exc 9.00 m deep and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating in trenches, not exc. 1.50 m wide and not exc. 1.50 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating in trenches, n exc. 1.50 m wide and exc 1.50 not exc. 3.00 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating in trenches, n exc. 1.50 m wide and exc 3.00 not exc. 4.50 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
| - | M & L for Excavating in trenches, n exc. 1.50 m wide and exc 4.50 not exc. 6.00 m depth for cesspits, manholes etc. and getting out in Hard/Dense soil even in foul position complete all as specified and as directed by Engineer-in-charge. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TenderDocuments.pdf
Tender Documents • 1.39 MB
BOQ_848602.xls
BOQ • 0.44 MB
drgsewage.pdf
Additional Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .