Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.8 LAWARDED | AWARDED |
Tender Value
₹8.0 L
EMD Value
₹23,750
Closing Date
1 Sept 2025, 9:30 pmClosed
Public Works Department
Annual Maintenance of Murugamalla to Srinivasapura border via Nandiganahalli, Pedduru, Kadirappanayakanakote from ch. 1.50 to 6.60, 7.20 to 8.90, 9.82 to 11.40, 11.64 to 15.00 km for the year 2025-26 in Chintamani Taluk, Chickaballapur District
PWD/2025-26/RD/WORK_INDENT24974
PWD/2025-26/RD/WORK_INDENT24974
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Chikkaballapura
₹500
₹23,750
25 Aug 2025
25 Aug 2025
2 Sept 2025
29 Aug 2025
Annual Maintenance of Murugamalla to Srinivasapura border via Nandiganahalli, Pedduru, Kadirappanayakanakote from ch. 1.50 to 6.60, 7.20 to 8.90, 9.82 to 11.40, 11.64 to 15.00 km for the year 2025-26 in Chintamani Taluk, Chickaballapur District
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .