Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance 54 B BAMONSAI SANGUEM SOUTH GOA 403 704 | SOUTH GOA | GOA | 403704 | ₹7.3 L | L1 | Accepted-Finance Accepted for AOC |
| 2 | L2₹7.4 LRejected-Finance ANANDWADI GOA | GOA | ₹7.4 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹7.5 LRejected-Finance BHO 834 1 DEVACHAHAVADA PANAS SANVORDEM GOA | SOUTH GOA | GOA | 403103 | ₹7.5 L | L3 | Rejected-Finance Rejected |
| 4 | L4₹8.4 LRejected-Finance FATORDA MARGAO GOA | ₹8.4 L | L4 | Rejected-Finance Rejected |
Tender Value
₹8.0 L
EMD Value
₹15,966
Closing Date
19 May 2026, 12:00 pmClosed
Sarpanch
V.P. Kirlapal Dabal
Construction of Crematorium at Dabal in V.P. Kirlapal Dabal
2026_VP_29073_1
VPKD/DHR/E-Tend/26-27/708
Open Tender
Civil Works
120 days
Dabal
Please refer tender Documents
2 documents required · 2 mandatory
₹5,000
₹15,966
3 Jun 2026
6 May 2026
22 May 2026
6 May 2026
19 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil | 34.04 | M3 | 291 | ₹9,905.64 | - |
| 2 | Rubble packing with hard laterite stone under
floors including watering ramming and
consolidating etc. in pipeline trenches and other
foundations complete. | 8.93 | M3 | 2,211 | ₹19,744.23 | 5035 |
| 3 | Providing & laying cement concrete 1:3:6 (1
cement: 3 coarse sand: 6 graded granitic or basaltic
stone aggrt. 20 mm. nominal size) excluding cost of
centering, shuttering and finishing in: All kinds of soil | 9.25 | M3 | 6,325 | ₹58,506.25 | 6011 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | ||||||
| 4.01 | Foundations, Footings, Bases for columns | 14.76 | M2 | 407 | ₹6,007.32 | - |
| 4.02 | iii) Centering & shuttering including Strutting, Propping & removal of form work for:Columns, Piers, Pillars, Aburments, Posts and
struts (square rectangle polygon in plan) | 32.1 | M2 | 598 | ₹19,195.8 | - |
| 4.03 | iii) Centering & shuttering including Strutting, Propping & removal of form work for: Sides and Soffits of beams, Beam Haunchings,
Cantilever, Girders, Bressumers and Lintels plinth
beams not exceeding 1m in depth | 29.05 | M2 | 412 | ₹11,968.6 | - |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | ||||||
| 5.01 | a) All works upto plinth level | 3.77 | M3 | 7,178 | ₹27,061.06 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_29520.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid