| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance 54 B BAMONSAI SANGUEM SOUTH GOA 403 704 | SOUTH GOA | GOA | 403704 | ₹7.3 L | L1 | Accepted-Finance Accepted for AOC |
| 2 | L2₹7.4 LRejected-Finance ANANDWADI GOA | GOA | ₹7.4 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹7.5 LRejected-Finance BHO 834 1 DEVACHAHAVADA PANAS SANVORDEM GOA | SOUTH GOA | GOA | 403103 | ₹7.5 L | L3 | Rejected-Finance Rejected |
| 4 | L4₹8.4 LRejected-Finance FATORDA MARGAO GOA | ₹8.4 L | L4 | Rejected-Finance Rejected |
Tender Value
₹8.0 L
EMD Value
₹15,966
Closing Date
19 May 2026, 12:00 pmClosed
Sarpanch
V.P. Kirlapal Dabal
Construction of Crematorium at Dabal in V.P. Kirlapal Dabal
2026_VP_29073_1
VPKD/DHR/E-Tend/26-27/708
Open Tender
Civil Works
Works
120 days
Dabal
Please refer tender Documents
2 documents required · 2 mandatory
₹5,000
₹15,966
3 Jun 2026
6 May 2026
22 May 2026
6 May 2026
19 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 34.04 | M3 | 291 | ₹9,905.64 |
| 2 | Rubble packing with hard laterite stone under
floors including watering ramming and
consolidating etc. in pipeline trenches and other
foundations complete. | 8.93 | M3 | 2,211 | ₹19,744.23 |
| 3 | Providing & laying cement concrete 1:3:6 (1
cement: 3 coarse sand: 6 graded granitic or basaltic
stone aggrt. 20 mm. nominal size) excluding cost of
centering, shuttering and finishing in: All kinds of soil | 9.25 | M3 | 6,325 | ₹58,506.25 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 4.01 | Foundations, Footings, Bases for columns | 14.76 | M2 | 407 | ₹6,007.32 |
| 4.02 | iii) Centering & shuttering including Strutting, Propping & removal of form work for:Columns, Piers, Pillars, Aburments, Posts and
struts (square rectangle polygon in plan) | 32.1 | M2 | 598 | ₹19,195.8 |
| 4.03 | iii) Centering & shuttering including Strutting, Propping & removal of form work for: Sides and Soffits of beams, Beam Haunchings,
Cantilever, Girders, Bressumers and Lintels plinth
beams not exceeding 1m in depth | 29.05 | M2 | 412 | ₹11,968.6 |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 5.01 | a) All works upto plinth level | 3.77 | M3 | 7,178 | ₹27,061.06 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_29520.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].