Loading…
Loading…
Tender ID
Tender Value
₹28.8 L
EMD Value
₹57,675
Closing Date
23 Feb 2026, 2:30 pmClosed
Superintending Engineer
New Office Complex, NFM- Ph.-II, Sarai Pipal Thalla, Azadpur, Delhi-110033
Supply, Installation, Testing and Commissioning of slow speed weigh in motion SSWIM ic Comprehensive maintenance for 05 years 1 plus 4 years at NSM Entry gate of F and V MNI Azadpur
2026_DAMB_286908_1
APMC/ED(E)/25-26/18
Open Tender
Electrical Works
Percentage
APMC Azadpur
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹57,675
16 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
SITC of pit mounted slow speed weigh in motion (SSWIM) system operates at lower vhicle speed with following technical specifications • Hybrid Bending Plate Size 1500mm X 620mm, •Number of Hybrid Bending Plates per lane 2 Nos.(For Standard 3 M wide lane),• Capacity of the platform 30 Ton/Axle, • In Motion Error ±upto 3% on FSR, upto speed 15 Km/h, • Number of load cells per Lane 4, •Type of Load Cell Double Ended Shear Beam,• Capacity of load cell 15t each,• Load Cell mV Output 2mV/V, Safe Over Load - Load Cell 150% of rated capacity,• Ultimate Overload 200% of rated capacity,• Material of construction – Load Cell Stainless Steel, • Protection class for Load cell IP 68,• Protection class for Controller/Indicator IP 67,• Communication TCP/IP (Built-in Ethernet Port), •Calibration Factory calibrated, • Re- calibration/Stamping & verification Every 12 months, • Vehicle Separator Infra-Red sensors based, housed in weather protected housing, • Direction Detection by Vehicle Separator Forward and Reverse. It includes lane Module Software license & integration (one time + annual support) for SSWIM system incorporating the RFID information (Vehicle details, etc..), raising alerts for black listed vehicles in market yard, integrating the ANPR Cameras etc complete as required, Loop detector with sensors for reversible system, DIO Card (Digital Input Output Interface), 8F UNI-TUBE optical fiber cables single mode , reporting Module Software for integration of whole system at one plateform complete as required.
Comprehensive Maintenance of 1st year after liability period of One year
Comprehensive Maintenance of 2nd year
Comprehensive Maintenance of 3rd year
Comprehensive Maintenance of 4th year
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_380012.xls
BOQ • 0.30 MB
NITweighbridge.pdf
Tender Documents • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .