Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹49.4 L+₹1.5 L (3.05%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹50.8 L+₹2.8 L (5.88%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹51.1 L+₹3.1 L (6.54%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹51.9 L+₹4.0 L (8.34%)Admitted-Finance 211 KRALPORA BUDGAM JAMMU KASHMIR 191113 UDYAM JK 04 0011111 | BUDGAM | JAMMU AND KASHMIR | 191113 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARMUKH INFRASTRUCTURE PRIVATE LIMITED L4 | M/S WANI ELECTRA & SUPPLIERS L5 | Escon Electricals L9 | M/S HIBBA ELECTRICALS L6 | FAYAZ AHMAD DAR L8 | RIM ELECTRICALS & SUPPLIERS L3 | M/S ENRON GROUP OF ENGINEERS L7 | GEC ELECTRICALS L2 | junaid ahmad sheikh L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply installation testing and commissioning of 250 kVA (11/6.6/0.433KV), 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Copper wound , and with LV Cable Box having detachable Aluminium Gland plate (Double Ratio) | 3 | No | 16,35,000 ₹16,35,000 | 18,27,000 ₹18,27,000 | 18,69,000 ₹18,69,000 | 15,90,000 ₹15,90,000 | 17,22,000 ₹17,22,000 | 17,10,000 ₹17,10,000 | 17,62,500 ₹17,62,500 | 15,60,000 ₹15,60,000 Lowest | 15,60,000 ₹15,60,000 Lowest |
| 1.02 | Supply installation testing and commissioning of 200 kVA (11/6.6/0.433KV), 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate (Double Ratio) | 4 | No | 14,00,000 ₹14,00,000 | 15,16,000 ₹15,16,000 | 18,40,000 ₹18,40,000 | 14,80,000 ₹14,80,000 | 13,94,000 ₹13,94,000 | 12,80,000 ₹12,80,000 | 13,00,000 ₹13,00,000 | 12,20,000 ₹12,20,000 | 11,00,000 ₹11,00,000 Lowest |
| 1.03 | Supply installation testing and commissioning of 100 kVA (11/6.6/0.433KV), 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate (Double Ratio) | 1 | No | 2,20,000 ₹2,20,000 | 2,97,000 ₹2,97,000 | 2,33,000 ₹2,33,000 | 1,90,000 ₹1,90,000 | 1,99,500 ₹1,99,500 | 1,90,000 ₹1,90,000 | 2,25,000 ₹2,25,000 | 1,68,000 ₹1,68,000 Lowest | 1,68,000 ₹1,68,000 Lowest |
| 1.04 | Supply installation testing and commissioning of 9 Mtr. Long Pole (ST-410 SP 33) | 35 | No | 6,12,500 ₹6,12,500 | 3,49,965 ₹3,49,965 Lowest | 4,02,500 ₹4,02,500 | 4,90,000 ₹4,90,000 | 5,75,750 ₹5,75,750 | 4,55,000 ₹4,55,000 | 5,53,000 ₹5,53,000 | 6,19,500 ₹6,19,500 | 5,25,000 ₹5,25,000 |
| 1.05 | Prividing and fixing of GI Channel / Angle/ X-arm including clamps and braces (S/Stn Part Complete) | 2,500 | Kg | 3,25,000 ₹3,25,000 | 1,97,500 ₹1,97,500 Lowest | 2,50,000 ₹2,50,000 | 2,95,000 ₹2,95,000 | 2,95,000 ₹2,95,000 | 3,00,000 ₹3,00,000 | 3,85,000 ₹3,85,000 | 3,12,500 ₹3,12,500 | 3,12,500 ₹3,12,500 |
| 1.06 | Supply installation testing and commissioning of 0.05 ACSR Conductor. | 2.5 | Km | 1,00,000 ₹1,00,000 | 1,22,500 ₹1,22,500 | 2,22,500 ₹2,22,500 | 1,32,500 ₹1,32,500 | 1,32,000 ₹1,32,000 | 1,00,000 ₹1,00,000 | 137.5 ₹137.5 Lowest | 1,00,000 ₹1,00,000 | 1,12,500 ₹1,12,500 |
| 1.07 | Supply installation testing and commissioning of Gapless Surge Arrestor,9 KV,10KA, LA with Polymer housing Stn Type | 8 | Set | 23,992 ₹23,992 | 24,000 ₹24,000 | 33,600 ₹33,600 | 33,600 ₹33,600 | 23,600 ₹23,600 Lowest | 24,000 ₹24,000 | 38,080 ₹38,080 | 34,800 ₹34,800 | 28,000 ₹28,000 |
| 1.08 | Supply installation testing and commissioning of 11 KV G.O AB Switch, 3-Phase, 3-Pole 200 A Vertical Type | 8 | Set | 79,992 ₹79,992 | 56,000 ₹56,000 Lowest | 76,800 ₹76,800 | 96,000 ₹96,000 | 82,400 ₹82,400 | 80,000 ₹80,000 | 78,000 ₹78,000 | 84,000 ₹84,000 | 96,000 ₹96,000 |
| 1.09 | Supply installation testing and commissioning of 11 KV Horn Gap Fuse set 3-Phase 200A | 8 | Set | 23,200 ₹23,200 Lowest | 40,000 ₹40,000 | 26,400 ₹26,400 | 28,000 ₹28,000 | 30,000 ₹30,000 | 24,800 ₹24,800 | 29,160 ₹29,160 | 30,800 ₹30,800 | 32,000 ₹32,000 |
| 1.10 | Supply installation testing and commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 115 | No | 19,550 ₹19,550 | 17,250 ₹17,250 Lowest | 20,700 ₹20,700 | 20,700 ₹20,700 | 28,750 ₹28,750 | 21,850 ₹21,850 | 25,530 ₹25,530 | 19,550 ₹19,550 | 29,900 ₹29,900 |
Tender Value
₹59.6 L
EMD Value
₹1.2 L
Closing Date
29 Oct 2025, 4:00 pmClosed
Executive Engineer ED I
Office of Ex Engineer EDI Basantbagh
Creation of 8 Nos of DTs of various Capacities 3x250 KVA 11 66 433KV 4x200 KVA 11 66 433KV and 1x100 KVA 11 66 433KV Double Ratio Sub Stations along with HT Line for providing Power Supply to the newly constructed flats at Sempora
2025_PDD_291353_1
E NIT NO 040 OF ED-I
Open Tender
Electrical Works
Lump-sum
45 days
Office of Executive Engineer ED I
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Yes
Executive Engineer ED I
₹1.2 L
Yes
3 Nov 2025
9 Oct 2025
30 Oct 2025
9 Oct 2025
29 Oct 2025
9 Oct 2025
9 Oct 2025 - 11 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TECH040.pdf
Other Document • 18.96 MB
SBD040.pdf
Other Document • 0.73 MB
BOQ_936960.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .