| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance LIG 4 SHARDA VIHAR KORBA C G 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 LAdmitted-Finance | ₹2.3 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected in technical evaluation as per NIT clause 13(g) |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected in technical evaluation as per NIT clause 13(g) |
| Sl No | Description | Qty | Unit | SWAMI ELECTRICALS L2 | HARI OM POWER ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Complete repairing, rewinding and testing of 01 no. 650 kW, 6.6 kV, Alstom make 3 phase squirrel cage induction motor bearing sl no. 200107/4 of Gevra Project.
Scope of work includes: -
a) Complete replacement of winding with new 99.96% grade (F - Class insulation copper conductor) as per design.
b) Weight of Copper for 01 Motor= 247.68 Kg.
Strip Size- 3.18 x 7.55 mm, no. of coils - 72, weight of one coil - 3.44 kg.
c) The rate is inclusive of Cost of insulating materials changing of complete with new insulation (f - Class insulation).
d) The rate is inclusive of cleaning, checking, brazing of connections, heating and repairing of bearing sheet of rotor, Painting and testing etc.
e) Rate is inclusive of Labour Charges & Contactors profit.
f) Scrap materials inclusive copper will be retained by repairer.
g) Bidders are requested to thoroughly inspect the job lying at our site before participating in tender.
h) All materials shall be routed through Regional Stores.
i) To and fro transportation shall be borne by bidder. | 1 | jobs | 2,33,774.5 ₹2.3 L | 1,64,400 ₹1.6 L |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
31 Mar 2026, 5:00 pmClosed
Staff Officer, EnM
Office of the Area General Manager, SECL Gevra Area - 495452
Complete repairing, rewinding and testing of 01 no. 650 kW, 6.6 kV, Alstom make 3 phase squirrel cage induction motor bearing sl no. 200107/4 of Gevra Project.
2026_SECL_356424_1
SECL/GA/SO ENM/25-26/E-TENDER/156 dt. 11/03/2026
Open Tender
Miscellaneous Works
30 days
Gevra Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,400
28 May 2026
17 Mar 2026
2 Apr 2026
17 Mar 2026
31 Mar 2026
18 Mar 2026
17 Mar 2026 - 24 Mar 2026
Complete repairing, rewinding and testing of 01 no. 650 kW, 6.6 kV, Alstom make 3 phase squirrel cage induction motor bearing sl no. 200107/4 of Gevra Project. Scope of work includes: - a) Complete replacement of winding with new 99.96% grade (F - Class insulation copper conductor) as per design. b) Weight of Copper for 01 Motor= 247.68 Kg. Strip Size- 3.18 x 7.55 mm, no. of coils - 72, weight of one coil - 3.44 kg. c) The rate is inclusive of Cost of insulating materials changing of complete with new insulation (f - Class insulation). d) The rate is inclusive of cleaning, checking, brazing of connections, heating and repairing of bearing sheet of rotor, Painting and testing etc. e) Rate is inclusive of Labour Charges & Contactors profit. f) Scrap materials inclusive copper will be retained by repairer. g) Bidders are requested to thoroughly inspect the job lying at our site before participating in tender. h) All materials shall be routed through Regional Stores. i) To and fro transportation shall be borne by bidder.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 0.15 MB
Tendernotice_3.pdf
PDF • 0.82 MB
BOQ_369280.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid