Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
21 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Baitalpur Depot, Bharat Petroleum Corporation Limited
Please read the general terms and condition for material specifications . For any further clarifications, you may contact the undersigned on cell no. 7052554400 or Mr Robin Tirkey (9163138052) ? Bidder is requested to offer his/her rate in rupees. ? Bidder will be able to note the total amount of their quote. ? If the Bidder is not willing to execute the job, bidder has the option of regret. Any part or full tender may be postponed or cancelled without assigning any reason. We are enclosing GCC also for your reference. Please submit your competitive quotes in the https://bpcleproc portal. BPCL will not be responsible for any delay in submitting e-tender due to connectivity issues or any other technical issue at your end.
14489
1000412108
Limited Tender
Works
Baitalpur Depot
24 Nov 2023
16 Nov 2023
22 Nov 2023
16 Nov 2023
21 Nov 2023
16 Nov 2023
16 Nov 2023 - 20 Nov 2023
Subject: -Drain, Kerb Wall and PCC Construction Works at Baitalpur Depot
Scope of work: - Work of construction of kerb wall and drain.
Following to be done at location.
1. Kerb wall to be constructed height of 300 mm from ground level or lower surface at TWD
PH, UG tank farm and TLFG PH manifold area as per specification of BPCL SOR.
2. Product drain to be constructed at TWD PH area and OWS no 03 and behind the Tank Farm
no.01/02, as per specification of BPCL SOR.
3. All work of kerb wall and drain to be discussed with officer in-charge or location in-charge.
4. Kindly visit the location BPCL Baitalpur depot situated at Baitalpur before quoting rates to
understand the scope of work as pre bid visit.
5. Any other additional works as per officer/engineering officer in-charge or location in-
6. Permits to be taken for all types of jobs considering associated risk and mitigation
measures with duly signed by concerned officers after necessary toolbox talks.
7. Proper PPEs to be made available and will in scope of contractor doing the job.
Refer below for quoting the rates: -
DESCRIPTION QTY. UOM UNIT RATE (INR)
NO. NO. AMOUNT (INR)
1 Excavation works 9018736 100 M3
2 Plaster works 9018853 1000 M2
3 Brick works 9018821 100 M3
4 PCC works 9018779 150 M3
5 RCC Work 9018795 20 M3
6 Dismantling 9018860 45 M3
8 GST @ 18% of item no
9 Total( item no 06+07)
10 Total( say in lacs)
SPECIAL TERM & CONDITION.
1. The quantity given in tender will be ordered time to time throughout the contract period as
per need. There is no surety to consume complete tendered quantity. Bidders need to
consider per unit rate irrespective of the bulk quantities as the quantities are purely
tentative and execution shall be done as per requirement only.
2. There is no guarantee that the given quantity in the tender will be consumed completely.
3. There will be no restriction on Number Purchase order to be placed till consumption of
complete quantity during tender period.
4. It is mandatory to deliver the items within 15 days after placing PO.
5. Payment will be only made after successful completion of project and submitting necessary
test certificates of concrete.
6. BPCL Engineer reserves right to change/modify design at any stage before taking the actual
service of any line item.
7. The complete supervision at site is the responsibility of vendor, BPCL engineer will visit site
at frequent intervals. Any mishap/ accident at site, BPCL will not be responsible for the
8. No Advance payment shall be made. Billing shall be done after completion of job.
9. The successful bidder shall be liable to submit the security deposit after the finalization of
10. Delay in delivery of service will lead to LD as per 0.5% of PO value per week and maximum
LD can be deducted 5 % of total value.
11. The successful bidder should submit the Security Deposit/retention money of 10 % of total
contract value. The same will be released after 6 months of successful completion of
12. Successful bidder needs to follow the specifications strictly during supply.
13. The delivery date needs to be adhered to and there shall be no extension for the work.
14. Delay in delivery of items will lead to LD as per standard terms.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
14489.pdf
pdf • 0.67 MB
BUDGETDOC_14489.pdf
pdf • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .