Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,200
Closing Date
27 Apr 2022, 11:00 amClosed
Superintending Engineer
15/12 A, Thornhill Road, Civil line, Prayagraj
I/C of 63 to 100KVA T/f at Mahrudeeh, 250 KVA to 400 KVA T/F at Sector-F Naher and Lala ki Sarai Govinpur Installation of new 63 KVA T/F at Mahaveer Puram and Laying of 33 KV U/g cable near IERT Railway Crossing in BP-2022-23 (Upcoming Summer Season
2022_PVVNV_691098_1
02/EUDC-II/PYG/SE/2022-23
Open Tender
Electrical Works
120 days
Prayagraj
As per Tender Specification
2 documents required · 2 mandatory
₹602
S.E. EUDC-II, Prayagraj
₹10,200
29 Apr 2022
20 Apr 2022
27 Apr 2022
20 Apr 2022
27 Apr 2022
20 Apr 2022
Amount
Increasing Capacity of 63 KVA/100KVA T/f at Mahrideeh, 250 KVA to 400 KVA T/F at Sector-F Naher and Lala ki Sarai Govinpur Installation of new 63 KVA T/F at Mahaveer Puram and Laying of 33 KV underground cable near IERT Railway Crossing in Business Plan 2022-23 (Upcoming Summer Season), including loading, unloading & Carriage of materials from Store Center Naini to Dump site and vice-versa, under supervision of EUDD Tagore Town, Prayagraj.
Errection & Commissioning of (3x120+1x195+1x16)/ (3x95+1x70+1x16) sq.mm ABC,necessary clamps, I-Hook, dead end clamp, suspension clamp,pierising connecter 1x35 sq.mm. & 1x16 sq.mm. PVC cable as per RESSPO norms will be arranged by the contractor exept AB cable and Weasel Conductor as per Resspo and Electrical Safety rule
Errection & Commissioning of distribution boxes/kiosk on the LT poles including all clamps & materials required, connections & sealing its connection in between Distribution Box & ABC 1x35 sq. mm LT PVC cable (all required Local materials including Distribution box arranged by the contractor as per Resspo and Electrical Safety rule)
Laying of single 33 KV 3x300 sq mm XLPE cable by drilling method. The cable shall be laid at the depth of 900 mm from the surface of road. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules. (The rates must be quoted for each cable of length per mtr.)
Supply and Fixing of Heat Shrink cable type end Terminations suitable for 33 KV, 3x300 sq mm XLPE cable Outdoor jointing kit
Earthing of L.T Cubical box/support/pannel complete with the help of M.S. rod 16 mm dia and 2.5 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod.
Fixing & grouting of stay rod with cement, sand and bricks ballast in ratio 1:4:8 and fasteniong the stay wire with pole and stay rod nozzling.(Grouting and all material will be provided by the contractor)
Erection of L.T.800 A cubical Box, with the help of channel, clamp & nut bolt etc. as per Resspo and Electrical Safety rule
Erection, grouting, plinthing, of single support pole 11 mtr long STP for LT line, including fixing of necessary clamps grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly. (All material will be supplied by the contractor Except 11 mtr long STP)
Erection, grouting, plinthing, of single support pole 8.5 mtr long PCC POLE for LT line, including fixing of necessary clamps grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr.with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastring around the plingth in ratio 1:2:4 with 12 mm thickness curing of plingth should be done properly. (All material will be supplied by the contractor Except 11 mtr long STP)
Erection & commissioning of T/F 63 KVA on D.P. along with HT/LT connections. Complete in all respect,as per Resspo and Electrical Safety rule
Erection & commissioning of T/F 400 KVA on Plinth & return back 250 KVA to store Complete in all respect,as per Resspo and Electrical Safety rule
Erection & commissioning of T/F 100 KVA D.P. along with HT/LT connections. Complete in all respect,as per Resspo and Electrical Safety rule.
Laying of single 11 KV 1x240 sq mm LT PVC cable along with lugging and connection at D/t, DP Box & LT Line.
Wire mash fancing of 400 KVA T/f & DP Box as per standerd schedule.
D N S ENTERPRISES
Shiv Enterprises
M/s Samdariya and Company
M/s Hari Om Enterprises
Urmila Associates
M/s A.E. Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid